{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Company Interviews","title":"Lahontan Gold (TSXV:LG) - Targets Q4 2027 First Gold Pour at US$820M NPV Santa Fe","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/073440e5\"></iframe>","width":"100%","height":180,"duration":1118,"description":"Interview with Kimberly Ann, President, Founder, CEO of Executive Chair of Lahontan Gold\nRecording date: 10th November 2026\nLahontan Gold Corp. (TSXV: LG) is advancing a restart of the Santa Fe Mine in Nevada’s Walker Lane. Santa Fe is a past producer that yielded over 359,200 oz gold and 702,000 oz silver between 1988 and 1995 through open-pit mining and heap leaching. Founder and CEO Kimberly Ann argued that the October 2026 PEA gives a deliberately conservative picture of the asset.\nThe PEA base case uses US$3,600/oz gold and US$49/oz silver. It returns an after-tax NPV5% of US$820.0M and an IRR of 40.1% on initial capital of US$172.0M, including a US$22.2M contingency. Cash costs are US$1,909/oz and AISC is US$2,250/oz. The 11-year mine life averages 91,900 AuEq oz a year, rising to about 112,500 oz in years 4 to 11 after throughput expands from 12,500 tpd to 17,000 tpd. At October 13 spot prices of US$4,166 gold and US$59 silver, NPV5% reaches US$1.13 billion and IRR 50.4%.\nThe central debate is the early schedule. Output in years 1 to 3 is lower, and the PEA payback is 3.68 years. Ann says about 200,000 oz on historic heap leach pads, already crushed, are not yet included because assays are pending. She estimates handling at about $5 a ton, with recrushing to improve permeability. First sonic results from 10 holes on Heap Leach Pad Two averaged 0.50 g/t Au and 3.3 g/t Ag, with a 40% average cyanide gold response. Ann says that once pad material is front-loaded, the company models payback near 22 months. That figure is not yet in a published study.\nA second source of legacy material is now under test. Lahontan outlined up to 100 RC holes averaging about 35 m into the Santa Fe East waste rock facility. The facility holds roughly 9.0 Mt mined between 1988 and 1992 under a 0.55 g/t cut-off, and the PEA already moves it as stripping. Ann said historic low-grade stockpiles have also returned assays above 1 g/t.\nOn the path to production, the PEA completes the...","thumbnail_url":"https://img.transistorcdn.com/1wv-MFlQAgnm-ca64e5kK4984dZB0os8-HJdRVsI74M/rs:fill:0:0:1/w:400/h:400/q:60/mb:500000/aHR0cHM6Ly9pbWct/dXBsb2FkLXByb2R1/Y3Rpb24udHJhbnNp/c3Rvci5mbS9zaG93/LzEzNTcyLzE2MjM5/NTQyMDctYXJ0d29y/ay5qcGc.webp","thumbnail_width":300,"thumbnail_height":300}