{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Company Interviews","title":"Central Asia Metals (AIM:CAML) - 70,000 Meters of Drilling Targets Chibougamau Resource Upgrade","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/4d8e4f5c\"></iframe>","width":"100%","height":180,"duration":1699,"description":"Interview with Gavin Ferrar, CEO of Central Asia Metals PLC\nOur previous interview: https://www.cruxinvestor.com/posts/central-asia-metals-lsecaml-proposed-cygnus-acquisition-fills-missing-piece-in-strategy-10672\nRecording date: 19th November 2026\nCentral Asia Metals (AIM, TSX:CAML) has changed from a dividend-paying base metals producer into a self-funded copper growth company. On October 27, 2026, it completed the acquisition of Cygnus Metals and its 100%-owned Chibougamau copper-gold project in Québec, and its shares began trading on the TSX the same day.\nThe cash engine is Kounrad in Kazakhstan, an SX-EW operation that leaches historical waste dumps. 2026 guidance is 12,000-13,000t of copper cathode, and 9,758t was produced in the first nine months. First-half C1 cash cost was $0.91/lb, up from $0.79/lb because of a stronger tenge and payroll inflation. Kounrad still delivered an 84% EBITDA margin. The asset generates around 75% of group cash. Group adjusted free cash flow was $46.8M in the first half, and management points to roughly $100M a year at current prices for at least another 2-3 years. Sustaining capex is $2-3M a year, with no trucks, crushers or mill.\nThe upside case at Kounrad is life extension. CEO Gavin Ferrar states the license runs to 2034, but dump recovery has beaten the leach curves from the original test work. Management once expected only around 1,000t/yr of copper after 2034 and now expects multiples of that. A team is defining the extension requirements, and the company is targeting an answer on the process by end-2026. The company estimates 75,400t of recoverable copper at end-2025, enough to support operations to at least 2034.\nChibougamau provides the growth. The current MRE is 6.4Mt M&I at 2.3% Cu, 0.8 g/t Au and 7.6 g/t Ag, plus 8.5Mt Inferred at 2.1% Cu, 1.7 g/t Au and 7.9 g/t Ag. Corner Bay, Cedar Bay, Devlin and Golden Eye would feed the 900ktpa Copper Rand mill in a hub-and-spoke model. The mill has been idle since 2008 and...","thumbnail_url":"https://img.transistorcdn.com/1wv-MFlQAgnm-ca64e5kK4984dZB0os8-HJdRVsI74M/rs:fill:0:0:1/w:400/h:400/q:60/mb:500000/aHR0cHM6Ly9pbWct/dXBsb2FkLXByb2R1/Y3Rpb24udHJhbnNp/c3Rvci5mbS9zaG93/LzEzNTcyLzE2MjM5/NTQyMDctYXJ0d29y/ay5qcGc.webp","thumbnail_width":300,"thumbnail_height":300}