{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Company Interviews","title":"Cabral Gold (TSXV:CBR) - Nearly Triples Resource & Self-Funds Path to Phase 2 PEA","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/530f2e8a\"></iframe>","width":"100%","height":180,"duration":505,"description":"Interview with Alan Carter, President & CEO of Cabral Gold Inc.\nOur previous interview: https://www.cruxinvestor.com/posts/cabral-gold-tsxvcbr-commercial-production-weeks-away-resource-update-by-year-end-12688\nRecording date: 20th November 2026\nCabral Gold Inc. (TSXV:CBR) released an updated Mineral Resource Estimate (MRE) for its Cuiú Cuiú gold district in Pará State, Brazil. The estimate totals 998,800 ounces (oz) Measured and Indicated (M&I) at 0.73 grams per tonne (g/t) gold from 42.5 million tonnes (Mt), and 2,512,900 oz Inferred at 0.95 g/t from 82.1 Mt. Those totals are 49% and 376% above the previous oxide and hard rock estimates combined. The MRE covers 6 deposits, against 3 in the last hard rock estimate in 2022.\nPresident and Chief Executive Officer Alan Carter said the district resource has grown from about 1.2 million ounces (Moz) to about 3.5 Moz, and that most of the increase came from drilling. The MRE draws on 149,835 meters (m) of drilling, including 604 holes for 46,118 m completed since 2022. The pit shells use US$3,500/oz gold. Carter said the company used a 0.35 g/t cut-off for the hard rock, against 0.26 g/t in 2022, even though gold is about double its level of 4 years ago.\nThe hard rock resource is 20.8 Mt at 1.09 g/t for 733,200 oz Indicated and 65.4 Mt at 1.09 g/t for 2,302,000 oz Inferred, up 63% and 406% on 2022. Carter said about 86% of the district total is primary material. At a 1.00 g/t cut-off inside the same pits, the hard rock holds 463,200 oz Indicated at 2.32 g/t and 1,452,200 oz Inferred at 2.37 g/t.\nThe oxide resource stands at 265,600 oz M&I at 0.38 g/t and 210,900 oz Inferred at 0.39 g/t, up 21% and 190% in 16 months. It feeds the Phase 1 heap leach operation, a 3,000 tonne per day plant that poured first gold on September 10, 2026. Cabral is targeting commercial production in the fourth quarter of 2026. Carter said the mine is producing about 3,000 oz a month and that this cash flow makes the company self-funded without...","thumbnail_url":"https://img.transistorcdn.com/1wv-MFlQAgnm-ca64e5kK4984dZB0os8-HJdRVsI74M/rs:fill:0:0:1/w:400/h:400/q:60/mb:500000/aHR0cHM6Ly9pbWct/dXBsb2FkLXByb2R1/Y3Rpb24udHJhbnNp/c3Rvci5mbS9zaG93/LzEzNTcyLzE2MjM5/NTQyMDctYXJ0d29y/ay5qcGc.webp","thumbnail_width":300,"thumbnail_height":300}