{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Palm Beach Construction News Roundup","title":"State Road 7 at Last: Traffic, Development and the Questions Left Unanswered","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/5cf11b22\"></iframe>","width":"100%","height":180,"duration":359,"description":"We walk the limits of the long‑delayed State Road 7 work using county and local reporting — what’s actually been finished, what developers are planning along the corridor, and where public reporting leaves gaps on wetlands, permits and traffic modeling. We stick to what local sources report and flag what they don’t.","thumbnail_url":null,"thumbnail_width":300,"thumbnail_height":300}