{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Company Interviews","title":"Scotia Metals (CSE:SMET) - Lithium Drilling Ahead of Schedule & a Low-Cost Brazil Option","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/5db9f440\"></iframe>","width":"100%","height":180,"duration":1892,"description":"Interview with Rodrigo Roso, Director & CEO of Scotia Metals\nOur previous interview: https://www.cruxinvestor.com/posts/scotia-metals-csesmet-nova-scotias-largest-lithium-holder-preps-q3-2026-drill-11333\nRecording date: 20th November 2026\nScotia Metals (CSE:SMET) has started drilling at its Acadia Lithium Project in southwestern Nova Scotia. Its board brings together lithium developers from Galaxy Resources and Allkem with capital markets investors behind K92 Mining and Dolly Varden Silver. In early November 2026, the company started a 6-hole scout program of about 1,000 m at the Green Wolf target, about 2 months ahead of the early-2027 date in its original plan. CEO Rodrigo Roso said total drilling will be between 1,000 m and 1,500 m and aims to hit one or more pegmatites.\nThe target is a ridge at the up-ice end of a dense cluster of spodumene boulders. The boulder train ends at the ridge, glacial flow points to it, and some large upright boulders may be outcrop. A ground radiometric anomaly and a fault follow the same feature. Across Green Wolf, five boulder trains over about 3 km by 1 km have returned historical grades up to 3.40% Li₂O. In September 2026, channel sampling of 38 boulders returned 20 samples above 1.0% Li₂O, with a maximum of 2.72%.\nAcadia covers 37,268 ha across 43 licenses. It is the largest lithium land position in Nova Scotia, with more than 80 km of prospective strike. The ground continues north and south of the privately held Brazil Lake deposit, which hosts 10.0 Mt at 1.20% Li₂O (JORC), although Brazil Lake results do not necessarily apply to Scotia's ground. Roso highlighted infrastructure: Shelburne deep-water port is 1 hour away, paved roads reach the drill sites, and power and water are available.\nScotia is targeting a visual update from the core in December, with assays later. If the scout program succeeds, Scotia is targeting a full-property drill program toward the end of the first quarter of 2027. \nScotia signed an option to...","thumbnail_url":"https://img.transistorcdn.com/1wv-MFlQAgnm-ca64e5kK4984dZB0os8-HJdRVsI74M/rs:fill:0:0:1/w:400/h:400/q:60/mb:500000/aHR0cHM6Ly9pbWct/dXBsb2FkLXByb2R1/Y3Rpb24udHJhbnNp/c3Rvci5mbS9zaG93/LzEzNTcyLzE2MjM5/NTQyMDctYXJ0d29y/ay5qcGc.webp","thumbnail_width":300,"thumbnail_height":300}