{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Company Interviews","title":"Erdene Resource Development (TSX:ERD) - Targeting 70,000 oz Gold in 2027 as Dark Horse Pit Advances","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/e2c62b2f\"></iframe>","width":"100%","height":180,"duration":1185,"description":"Interview with Peter Akerley, President & CEO of Erdene Resource Development Corp.\nOur previous interview: https://www.cruxinvestor.com/posts/erdene-resource-development-tsxerd-bayan-khundii-cash-flow-funds-deep-porphyry-hunt-11741\nRecording date: 20th November 2026\nErdene Resource Development is a TSX-listed gold producer whose Bayan Khundii Gold Mine in southwestern Mongolia poured first gold in September 2025. Erdene owns the mine 50:50 with Mongolian Mining Corporation (MMC) through Erdene Mongol LLC, and holds a 5% net smelter return royalty on production above 400,000 ounces (oz). It also owns 100% of the Zuun Mod molybdenum-copper project.\nThird-quarter 2026 results showed a mine moving out of ramp-up. Bayan Khundii sold 11,853 oz of gold at a realized US$4,313/oz, generating US$51M in revenue. Cash costs were US$1,742/oz and all-in sustaining cost was US$1,848/oz. Erdene booked C$9.6M of net income for the quarter. Throughput rose 6% and recoveries held at 96%, but feed grade averaged 2.3 grams per tonne (g/t) while the pit was widened to reach the higher-grade Striker and Midfield zones.\nGrade is the operating focus. President and Chief Executive Officer Peter Akerley said about 80% of the deposit's value is in 20% of the rock, so selective mining drives head grade. Blasting control, dig-line discipline, more pit geologists and high-precision GPS have moved grade from about 2 g/t toward 3 g/t. Holding 3 g/t through the fourth quarter would put 2026 output in the 50,000 oz range.\nThe 2027 target is aorund 70,000 oz. The swing factor is Dark Horse, a satellite pit with about 50,000 oz of 7 g/t material at surface, according to Akerley. The mine plan scheduled Dark Horse for 2028. Erdene is working to bring it into mid-2027 and is targeting a timing decision in the first quarter of 2027. Bayan Khundii and Dark Horse together hold about 450,000 oz in the 4.5 g/t range, which Akerley said supports roughly five years at 70,000 oz or more.\nManagement's stated...","thumbnail_url":"https://img.transistorcdn.com/1wv-MFlQAgnm-ca64e5kK4984dZB0os8-HJdRVsI74M/rs:fill:0:0:1/w:400/h:400/q:60/mb:500000/aHR0cHM6Ly9pbWct/dXBsb2FkLXByb2R1/Y3Rpb24udHJhbnNp/c3Rvci5mbS9zaG93/LzEzNTcyLzE2MjM5/NTQyMDctYXJ0d29y/ay5qcGc.webp","thumbnail_width":300,"thumbnail_height":300}