{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Company Interviews","title":"New Found Gold (TSXV:NFG) - Hammerdown & the Path to Production","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/e58b346c\"></iframe>","width":"100%","height":180,"duration":1058,"description":"Interview with Keith Boyle, CEO & Director of New Found Gold\nOur previous interview: https://www.cruxinvestor.com/posts/new-found-gold-tsxvnfg-fully-funded-drill-program-for-2026-10527\nRecording date: June 9th 2026\nNew Found Gold Corp (TSXV: NFG | NYSE-A: NFGC) is advancing two gold projects in Newfoundland and Labrador, Canada. Its flagship Queensway Gold Project hosts a NI 43-101 resource of 1.39 million ounces of indicated gold at 2.40 g/t and 0.608 million ounces of inferred gold at 1.77 g/t. The Hammerdown Gold Project, acquired in 2025, provides access to the Pine Cove Mill, a fully permitted, operational processing facility that will receive Queensway Phase 1 ore from Q4 2027, with commercial production targeted for 2028.\nHammerdown is in the final stages of its ramp-up to commercial production, defined as sustained 700 tonne-per-day throughput with consistent grade from the open pit. At steady state, the operation is projected to generate $40 to $50 million per year in free cash flow at an AISC of approximately $2,500 per ounce - sufficient to cover corporate overhead and fund the exploration program. The Pine Cove Mill is being doubled in throughput capacity as part of the Phase 1 capital program, removing the need for a separate processing facility at Queensway. A $220 million financing package closed in April 2026 funds Phase 1 construction, with $148 million in cash and marketable securities held as of May 2026.\nQueensway Phase 1 targets approximately 100,000 ounces per year in the first two years at grades of 12 to 12.5 g/t and an AISC of around $1,300 per ounce. The PEA's base case at US$2,500 gold shows an after-tax NPV of C$743 million, an IRR of 56%, and payback of under two years. The operational team being assembled at Hammerdown, including newly promoted General Manager of Mines Mark Ross, will transfer directly to Queensway.\nA 90,000-metre drill program is underway across a 110-kilometre land package, with the Dropkick zone, returning...","thumbnail_url":"https://img.transistorcdn.com/1wv-MFlQAgnm-ca64e5kK4984dZB0os8-HJdRVsI74M/rs:fill:0:0:1/w:400/h:400/q:60/mb:500000/aHR0cHM6Ly9pbWct/dXBsb2FkLXByb2R1/Y3Rpb24udHJhbnNp/c3Rvci5mbS9zaG93/LzEzNTcyLzE2MjM5/NTQyMDctYXJ0d29y/ay5qcGc.webp","thumbnail_width":300,"thumbnail_height":300}