{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Company Interviews","title":"i-80 Gold (TSX:IAU) - Meet the Team - Tyler Hill","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/e9a45507\"></iframe>","width":"100%","height":180,"duration":486,"description":"Interview with Tyler Hill, Vice President of Geology, i-80 GoldOur previous interview: https://www.cruxinvestor.com/posts/i-80-gold-tsxiau-14m-oz-resource-base-targets-mid-tier-producer-status-7786Recording date: 9th September 2025i-80 Gold is systematically advancing five Northern Nevada gold projects toward production through extensive drilling campaigns and feasibility studies, with completion targets set for Q1 2026 and Q1 2027. The company operates three high-grade underground mines (Granite Creek, Cove, Ruby Hills) and two oxide open pit projects under a strategic hub-and-spoke processing model.The company has demonstrated significant commitment to resource definition through comprehensive drilling programs. At Cove, the flagship project, i-80 Gold completed 45,000 meters of drilling over two years, with feasibility study completion planned for Q1 2026. At Granite Creek, 14,000 meters of infill drilling on 50-meter spacing is planned for 2025, focused on converting inferred resources to measured and indicated categories. The Ruby Hills Archimedes Underground component will begin drilling later in 2025, continuing through 2026, with feasibility study completion targeted for Q1 2027.A key differentiator in i-80 Gold's strategy is the centralized processing hub utilizing existing infrastructure at Lone Tree. The facility features an autoclave processing system that handles refractory ores from the three underground mines, while heap leach pads remain at individual sites. This configuration reduces capital requirements for individual projects while creating operational synergies and cost efficiencies across the portfolio.Led by Vice President of Geology Tyler Hill, who brings over nine years of experience on the Cove project, the 15-person geology team leverages deep local expertise and established contractor relationships. The company utilizes contractor drilling services while maintaining in-house geological expertise at each site, providing operational...","thumbnail_url":"https://img.transistorcdn.com/1wv-MFlQAgnm-ca64e5kK4984dZB0os8-HJdRVsI74M/rs:fill:0:0:1/w:400/h:400/q:60/mb:500000/aHR0cHM6Ly9pbWct/dXBsb2FkLXByb2R1/Y3Rpb24udHJhbnNp/c3Rvci5mbS9zaG93/LzEzNTcyLzE2MjM5/NTQyMDctYXJ0d29y/ay5qcGc.webp","thumbnail_width":300,"thumbnail_height":300}