{"type":"rich","version":"1.0","provider_name":"Transistor","provider_url":"https://transistor.fm","author_name":"Company Interviews","title":"New Found Gold (TSX:NFGC) - Q3 Operating & Financial Results","html":"<iframe width=\"100%\" height=\"180\" frameborder=\"no\" scrolling=\"no\" seamless src=\"https://share.transistor.fm/e/fd23183c\"></iframe>","width":"100%","height":180,"duration":1002,"description":"Interview with Keith Boyle, Director & CEO of New Found Gold\nOur previous interview: https://www.cruxinvestor.com/posts/new-found-gold-tsxnfgc-queensway-pea-mre-update-12474\nRecording date: 11th November 2026\nNew Found Gold has completed its first quarter of commercial production at the Hammerdown Gold Mine in Newfoundland and Labrador, producing 4,863 ounces of gold at 2.77 g/t with zero lost-time incidents. The company sold 6,935 ounces at an average realized price of US$4,285 per ounce, generating C$41.6 million in revenue and C$11.2 million in operating cash flow before working capital changes. Income from mine operations reached C$18.6 million, or 45% of revenue.\nAll-in sustaining costs of US$3,279 per ounce came in US$904 above the Hammerdown PEA. CEO Keith Boyle attributed the gap mainly to three ramp-up items. Stripping in the Rumbullion pit, brought forward from early 2027 to avoid winter conditions, added about US$350 per ounce. An 11% lower head grade added about US$135 per ounce, and infill drilling to upgrade Inferred resources added further cost. Management is targeting a life-of-mine AISC of around US$2,500 per ounce. Three projects support that target: grade control drilling, a crusher and ore sorter due for commissioning in early 2027, and the conversion of the Pine Cove Mill to a gravity-CIL circuit.\nAt the flagship Queensway Gold Project, the revised PEA outlines an after-tax NPV5% of C$1.728 billion and a 126% IRR at US$3,600 gold, with a Phase 1 head grade of 13.41 g/t. The Phase 1 Environmental Preview Report was registered on November 3, 2026, and Boyle expects a ministerial decision by year-end or early in the first quarter of 2027.\nThe roughly C$150 million Phase 1 build is backed by C$167.1 million in cash, a further C$35 million of available debt and expected warrant proceeds. Management says the build is fully funded, including under a stress test at US$3,500 gold. Hammerdown cash flow is earmarked for G&A and exploration. The teams...","thumbnail_url":"https://img.transistorcdn.com/1wv-MFlQAgnm-ca64e5kK4984dZB0os8-HJdRVsI74M/rs:fill:0:0:1/w:400/h:400/q:60/mb:500000/aHR0cHM6Ly9pbWct/dXBsb2FkLXByb2R1/Y3Rpb24udHJhbnNp/c3Rvci5mbS9zaG93/LzEzNTcyLzE2MjM5/NTQyMDctYXJ0d29y/ay5qcGc.webp","thumbnail_width":300,"thumbnail_height":300}