Canada's modular construction market reached $5.5 billion CAD in 2025 — but the legal frameworks governing most of those projects are still built on standard contract forms designed for conventional site-based construction. Construction lawyers Max Gennis and Matt Gaulton of WeirFoulds LLP lay out the specific contract gaps that create disproportionate risk on modular projects, and why Canada's standard-form bodies (CCDC and CCA) haven't closed those gaps yet. For developers, GCs, and capital partners structuring modular deals in Canada, this episode is a direct-risk briefing.
Canada's modular construction market reached $5.5 billion CAD in 2025 — but the legal frameworks governing most of those projects are still built on standard contract forms designed for conventional site-based construction. Construction lawyers Max Gennis and Matt Gaulton of WeirFoulds LLP lay out the specific contract gaps that create disproportionate risk on modular projects, and why Canada's standard-form bodies (CCDC and CCA) haven't closed those gaps yet. For developers, GCs, and capital partners structuring modular deals in Canada, this episode is a direct-risk briefing.
Key Takeaways:
Until the CCDC and CCA release dedicated modular contract forms, supplementary conditions are effectively the real contract on any Canadian modular project. Owners and contractors who treat standard forms as a sufficient starting point are accepting risk that hasn't been priced or allocated. The right moment to build the contractual framework is before fabrication starts — not after the first module is ready to ship and a dispute is already forming.
Subscribe to Built Different for daily updates on Modular construction reality.
Built Different is a daily podcast for developers, general contractors, and capital partners working in modular, volumetric, and off-site construction.
No hype. No futurism. Just execution reality.
Each episode breaks down what actually determines success or failure in factory-built projects: coordination gaps, design freeze timing, transportation risks, sequencing failures, financing mismatches, and the hidden costs no one models.
This isn't a show about the promise of modular. It's about what happens when modules hit the jobsite—and what you need to get right before they do.
Topics include:
Why modular projects fail (and it's not the factory)
Design freeze and its hidden costs
Transportation as construction risk
Site work that still controls the timeline
Where modular actually saves money—and where it doesn't
Sequencing, coordination, and the gaps between systems
3-4 minutes daily. Built for people who build.