1
00:00:02,469 --> 00:00:05,462
Thanks for joining me today on Let's Get Digital.

2
00:00:05,462 --> 00:00:07,423
I'm Keri Charles, your host.

3
00:00:07,423 --> 00:00:08,984
I'm glad you're here.

4
00:00:08,984 --> 00:00:11,907
My guest today is Joel Ogren.

5
00:00:11,907 --> 00:00:16,410
He is the founder and CEO of Assured Communications.

6
00:00:16,410 --> 00:00:22,876
Now, Assured Communications is a company that's building critical communications
infrastructure all around the world.

7
00:00:22,876 --> 00:00:27,472
But what I'm most impressed with and excited to hear about from Joel...

8
00:00:27,472 --> 00:00:31,264
is his Marine Corps experience because I was also in the Marines.

9
00:00:31,264 --> 00:00:33,810
So Joel, thank you for joining me today.

10
00:00:34,232 --> 00:00:35,546
Thanks for having me.

11
00:00:35,549 --> 00:00:36,899
Great to see you there, Maureen.

12
00:00:36,899 --> 00:00:38,150
Yeah, absolutely.

13
00:00:38,150 --> 00:00:39,301
Hurrah!

14
00:00:41,044 --> 00:00:50,134
So, Joel, talk about your path that, you know, from the Marines and, you know, what led
you to Assured Communications.

15
00:00:50,134 --> 00:00:51,705
Tell us about that story.

16
00:00:52,590 --> 00:00:53,530
Sure.

17
00:00:53,530 --> 00:01:04,050
It was like many of us as we grew up, the path where we are today was we had no idea, you
know, when we were young people coming out of high school, et cetera.

18
00:01:04,050 --> 00:01:08,250
So I enlisted in the Marines at the age of 17.

19
00:01:09,410 --> 00:01:16,518
A few years later, I had put myself through college and got my double E degree and

20
00:01:17,388 --> 00:01:20,470
nominated to go to the platoon leaders course in the Marine Corps.

21
00:01:20,470 --> 00:01:32,007
what for people that don't know what that is, it's a, it's a way for enlisted personnel to
be selected and transition into the officer Corps, another, another level of leadership uh

22
00:01:32,007 --> 00:01:32,847
in the military.

23
00:01:32,847 --> 00:01:44,568
So uh I was blessed to be selected into that program uh and, uh and became a
communications officer about, you know,

24
00:01:44,568 --> 00:01:47,249
five, six years later into my Marine Corps career.

25
00:01:47,249 --> 00:01:48,360
So that was, that was great.

26
00:01:48,360 --> 00:01:50,278
That's really where I started in that.

27
00:01:50,278 --> 00:01:56,343
Of course, back in those days it was, and I know you were in the communications field
also, Kerry.

28
00:01:56,343 --> 00:02:00,161
So you understand, you know, what we were doing back then.

29
00:02:00,161 --> 00:02:05,537
We were still dealing with in the early eighties, we were dealing with paper tape and IBM
cards.

30
00:02:05,537 --> 00:02:10,849
If you can, if anybody remembers those large floppy disks, eight inch floppy disks.

31
00:02:10,849 --> 00:02:12,390
uh

32
00:02:13,442 --> 00:02:16,043
Dazdy drums, all kinds of silly stuff.

33
00:02:16,163 --> 00:02:25,485
And in the, in the field where we were still dragging wire, running wire around the field,
um, you know, cranking phones, the old TA ones and everything like that.

34
00:02:25,485 --> 00:02:33,197
Um, T PRICS at 25s, PRICS 77s now way all before the, enhanced communications modes that
we have today.

35
00:02:33,197 --> 00:02:34,828
So that's where I got involved in it.

36
00:02:34,828 --> 00:02:43,350
Uh, I had, I had intended to, do that for about four years and then go back and be a
cattle rancher back in South Dakota where I grew up.

37
00:02:43,854 --> 00:02:47,394
Um, 24 years later, I had not made that transition.

38
00:02:47,394 --> 00:02:51,614
So I stuck and stuck it out through, uh, two and almost two and a half decades.

39
00:02:51,614 --> 00:02:53,394
So it was a great career.

40
00:02:53,574 --> 00:02:58,274
Uh, I ended, uh, I retired, uh, out of the white house.

41
00:02:58,694 --> 00:03:01,674
Um, and, uh, and then entered into a second career.

42
00:03:01,674 --> 00:03:03,114
So that was great.

43
00:03:03,114 --> 00:03:10,634
That second career, by the way, uh, I ran a communications program at the white house, uh,
went into John Hopkins applied physics lab.

44
00:03:10,634 --> 00:03:13,454
It's been, uh, did another career there effectively.

45
00:03:13,902 --> 00:03:19,054
uh I was, I took a sabbatical from there to go over to DISA.

46
00:03:19,054 --> 00:03:23,706
So that's the Department of Defense's uh ISP, our global ISP.

47
00:03:23,846 --> 00:03:32,010
And I was asked to lead uh a program, which was known as the Center for National Nuclear
Command Control and Communications.

48
00:03:32,010 --> 00:03:40,733
had a very large, very large budget that we executed on, built a team, delivered a global
capability and that in communications, right?

49
00:03:40,733 --> 00:03:43,404
Critical communications, high assurance networking.

50
00:03:43,576 --> 00:03:46,208
So things that networks that are not supposed to fail.

51
00:03:46,208 --> 00:03:55,095
uh And a lot of that is because we have redundancy uh built into our networks and our
network partners out there all around the world.

52
00:03:55,095 --> 00:04:02,662
And that's really how I kind of got my entry into this field that Assured Communications
is doing today.

53
00:04:02,662 --> 00:04:09,728
And that's why I named the company Assured Communications because there's such a focus on
those high assurance.

54
00:04:09,728 --> 00:04:11,269
How do you make networks not fail?

55
00:04:11,269 --> 00:04:12,469
What do you do?

56
00:04:13,142 --> 00:04:14,533
Because they are going to fail.

57
00:04:14,533 --> 00:04:15,344
That's the reality.

58
00:04:15,344 --> 00:04:18,666
No one should think I'm saying that there are networks that are perfect and don't fail.

59
00:04:18,666 --> 00:04:21,368
They all fail for lots of different reasons.

60
00:04:21,368 --> 00:04:31,596
And so what do you do to make sure that those critical nodes, critical communications,
whether it's voice or data, cloud content, whatever it needs to be, can get from point A

61
00:04:31,596 --> 00:04:33,438
to Z appropriately.

62
00:04:33,438 --> 00:04:35,159
That's what we focus on.

63
00:04:35,479 --> 00:04:39,282
So it was a great background being in the military, frankly, because you get

64
00:04:39,438 --> 00:04:43,204
uh As you know, Kerry, uh it's the whatever it takes mentality.

65
00:04:43,204 --> 00:04:45,908
You have to do whatever it takes to accomplish the mission.

66
00:04:45,908 --> 00:04:49,573
We bring that into this company, the people that are here.

67
00:04:49,573 --> 00:04:55,862
I know we're going to talk about the people later, but that's ah critical to this kind of
business.

68
00:04:56,292 --> 00:05:08,053
So Assured Communications has grown well beyond a consulting firm and talk a little bit
more about just all the services you provide and the global work that you do.

69
00:05:09,058 --> 00:05:17,831
Yeah, the joke I tell everybody is I really started this company to kind of semi-retire,
just kind of do some light consulting.

70
00:05:17,831 --> 00:05:21,255
Initially, I had a lot of recommendations from folks.

71
00:05:21,276 --> 00:05:23,148
I was trying to make a decision on...

72
00:05:25,026 --> 00:05:29,489
whether or not I was going to go back to John Hopkins Applied Physics Lab or do something
else.

73
00:05:29,489 --> 00:05:35,153
So I started this, but uh things got busy very quickly on a global scale.

74
00:05:35,153 --> 00:05:41,146
There's a lot of need out there, a lot of products and opportunity.

75
00:05:41,146 --> 00:05:45,553
So, and that's where I really started bringing on and just growing the company.

76
00:05:45,553 --> 00:05:47,781
It just happened uh naturally.

77
00:05:48,106 --> 00:05:52,985
I learned the value of having key partners that you can trust, trusted partners out there.

78
00:05:52,985 --> 00:05:54,370
uh

79
00:05:54,370 --> 00:05:57,312
That's absolutely critical for any business.

80
00:05:57,312 --> 00:05:59,484
And we also wanted to earn their trust.

81
00:05:59,484 --> 00:06:03,056
that's a two-way street.

82
00:06:03,997 --> 00:06:14,604
just the knowledge and the experience of having worked globally uh and meeting those
people, they might've been in uniform also in a prior life, but they're still in the field

83
00:06:14,604 --> 00:06:15,985
just like I was.

84
00:06:16,125 --> 00:06:21,209
And so uh already had a really strong series of relationships around the world.

85
00:06:21,209 --> 00:06:22,860
um

86
00:06:22,860 --> 00:06:26,755
You just keep bumping into those people out there and they're good people, they're solid.

87
00:06:26,755 --> 00:06:29,178
And that network has grown significantly.

88
00:06:29,178 --> 00:06:35,916
There's just a lot of great people in the industry wherever they grew up in it that are
out there making a difference.

89
00:06:36,591 --> 00:06:45,100
So Joel, you've really built a reputation for looking at infrastructure through a much
wider lens than just technology.

90
00:06:45,160 --> 00:06:51,267
So you see it through a lens of economics, politics, regulation, risk.

91
00:06:51,267 --> 00:06:54,850
Why is it important to have such a holistic view?

92
00:06:56,290 --> 00:06:59,412
It's a great question because this comes up so very often.

93
00:06:59,412 --> 00:07:11,139
uh In today's world, have to take in all of the, you have to have a good solid base of
understanding of all of those, because all of those topics are going to impact your

94
00:07:11,139 --> 00:07:12,399
projects today.

95
00:07:12,620 --> 00:07:22,976
I think that if you don't, uh if a company, a customer doesn't have a team that can look
at that and that where you can fit in and participate in that.

96
00:07:23,054 --> 00:07:25,306
you're going to have a lot of challenges that are going to come up.

97
00:07:25,306 --> 00:07:34,272
So uh specifically when you get into the regulatory environment, oh what we have from a
regulatory environment here in the U.S.

98
00:07:34,272 --> 00:07:40,847
is not, doesn't mean it's dissimilar anywhere else around the world, any other country,
but it is going to be different.

99
00:07:40,847 --> 00:07:50,210
There's going to be different timelines, uh different requirements, different licensing
requirements, know, et cetera, uh impact on taxes.

100
00:07:50,210 --> 00:07:58,356
You know, all of these things that you really have to look at, how can you be efficient
across all of those when you're working in multiple countries?

101
00:07:58,356 --> 00:08:07,682
So a lot of that comes from, again, some of the experience, but when you, I think there's
a lot of communication that needs to happen.

102
00:08:07,682 --> 00:08:16,568
Everybody knows this, when you get into a project to not only meet the leadership of the
communities that you're going to be in, but get out there and meet some of the people.

103
00:08:17,109 --> 00:08:19,002
The world is full of disinformation.

104
00:08:19,002 --> 00:08:22,584
due to our social media platforms.

105
00:08:22,584 --> 00:08:30,107
so setting the record straight early and often, helping people understand what you're
doing, what you're not doing also, right?

106
00:08:30,107 --> 00:08:38,591
uh The value of this, how this can help uh maybe their generation or future generations
and what the impact of that is.

107
00:08:38,591 --> 00:08:42,313
I think having good uh positive conversations around that.

108
00:08:42,313 --> 00:08:44,614
And there are some tough conversations that happen.

109
00:08:44,906 --> 00:08:50,161
because these type of facilities, they take land and they impact power and water and all
of that.

110
00:08:50,161 --> 00:08:53,965
And those are all good conversations to have.

111
00:08:53,965 --> 00:09:04,426
So I think you need to understand the current state of the politics, the regulation
impact, environmental permitting, historical, cultural, all of these things that you deal

112
00:09:04,426 --> 00:09:09,140
with in developing projects and taking them to a successful conclusion.

113
00:09:09,977 --> 00:09:15,290
So your project spans subsea, terrestrial, satellite, policy.

114
00:09:15,370 --> 00:09:21,474
When you're taking on something that is this complex, where do the surprises come from?

115
00:09:21,474 --> 00:09:23,675
And maybe give an example of that too.

116
00:09:24,078 --> 00:09:24,360
Sure.

117
00:09:24,360 --> 00:09:26,278
uh

118
00:09:28,646 --> 00:09:37,270
If, if we've done a good job at the topic that we just talked about that holistic view,
you should be well prepared coming in.

119
00:09:37,311 --> 00:09:50,418
Most of the surprises are coming in to, uh, with, when I have customers that are, so, so
risk averse on a project, um, that they end up.

120
00:09:51,018 --> 00:09:54,273
Impact in the project negatively as we go down the line here.

121
00:09:54,273 --> 00:09:58,456
And what I mean by that specifically is you, may, uh

122
00:09:58,456 --> 00:10:07,252
There's project risk, um Permitting risk, as an example, permits and environmental uh
approvals, they just take a long time.

123
00:10:07,252 --> 00:10:09,323
It doesn't matter where you're at in the world these days.

124
00:10:09,323 --> 00:10:13,056
I mean, you're looking at 18, 24 months, 36 months sometimes.

125
00:10:13,056 --> 00:10:19,400
ah I say it quite often, I can't wait to get to the part where I can put a shovel in the
ground and go build something.

126
00:10:19,400 --> 00:10:22,912
That's almost the easy part, you know, because I've got...

127
00:10:23,054 --> 00:10:32,318
uh You know, two law firms and a lobbyist may be working on just trying to get the
environmental and the permitting process through, along with obviously coordination with

128
00:10:32,318 --> 00:10:34,959
the local communities.

129
00:10:35,019 --> 00:10:51,386
But the challenge that we face here is, uh and the surprises are the fact that people
don't really understand that that's part of the path that we're on right now.

130
00:10:51,386 --> 00:10:52,546
So I think...

131
00:10:52,999 --> 00:10:55,781
And maybe it's not, it's an experience issue.

132
00:10:55,781 --> 00:10:58,063
oh They don't believe it.

133
00:10:58,063 --> 00:11:01,416
They're being told something else from someone somewhere else down the line.

134
00:11:01,416 --> 00:11:05,550
They believe somebody else can do it faster, cheaper, you know, et cetera.

135
00:11:05,550 --> 00:11:06,791
These things just take time.

136
00:11:06,791 --> 00:11:08,433
You've got to be a bit of a squeaky wheel.

137
00:11:08,433 --> 00:11:09,594
You've got to know what you're doing.

138
00:11:09,594 --> 00:11:11,058
You follow the process.

139
00:11:11,058 --> 00:11:13,628
It's a phrase I use a lot with my team, follow the process.

140
00:11:13,628 --> 00:11:14,999
The process works.

141
00:11:14,999 --> 00:11:15,740
Right.

142
00:11:15,740 --> 00:11:18,292
And we adjust, we adjust from that, but.

143
00:11:18,582 --> 00:11:26,329
The surprise, what's surprising is how much risk can be put on a project by not making
decisions in a timely manner.

144
00:11:26,329 --> 00:11:27,419
Cause that costs money.

145
00:11:27,419 --> 00:11:35,246
It increases costs, uh products, uh steel costs, a war kicks off, right?

146
00:11:35,246 --> 00:11:41,851
And all of a sudden, anything that has anything to do with the cost of oil, lubricants, et
cetera, over there drives prices up.

147
00:11:41,851 --> 00:11:46,165
So uh that puts a lot of financial risk on the developers.

148
00:11:46,165 --> 00:11:47,486
puts financial risk on.

149
00:11:47,486 --> 00:11:48,326
uh

150
00:11:48,440 --> 00:11:52,858
project implementation, the finance, the budget of the whole project.

151
00:11:52,858 --> 00:12:02,634
uh So moving out smartly, executing a project, if you believe in it, execute, cross that
line of departure.

152
00:12:03,675 --> 00:12:10,259
So a lot of companies sometimes are afraid to tell clients the real hard truths.

153
00:12:11,700 --> 00:12:22,427
you talked about uh when I think I met you at that conference in Metro Connect, you talked
about stopping a project before too much money is spent.

154
00:12:22,668 --> 00:12:27,750
So what is this level of honesty take or require from a leader?

155
00:12:29,742 --> 00:12:34,562
Well, I think you've, this is part of that trusted partner, you know, from the start,
right?

156
00:12:34,562 --> 00:12:36,742
We have to have those hard communications.

157
00:12:36,842 --> 00:12:40,082
And a good example of this, this usually occurs.

158
00:12:40,942 --> 00:12:43,942
There's a series of...

159
00:12:45,678 --> 00:12:49,340
I call it as you're on the critical path to on the project, right?

160
00:12:49,340 --> 00:12:51,571
So that path is made up of many things.

161
00:12:51,571 --> 00:13:01,966
In the early days, I have clients that I've had clients that want to tell me where we
should land a system or tell me where we should build something.

162
00:13:01,966 --> 00:13:04,737
And they've really not done a proper feasibility analysis.

163
00:13:04,737 --> 00:13:11,310
They've not looked strategically at, you know, where is the power if we're bringing cables
in from offshore across the ocean.

164
00:13:11,770 --> 00:13:14,873
You can't just point at a place on the map and say, we're going to bring it in right
there.

165
00:13:14,873 --> 00:13:16,684
There's a lot of stuff going on offshore.

166
00:13:16,684 --> 00:13:18,496
We have to evaluate that and look at that.

167
00:13:18,496 --> 00:13:19,287
That takes time.

168
00:13:19,287 --> 00:13:21,138
That requires resources.

169
00:13:21,559 --> 00:13:28,585
have to, wherever we're going to build the facilities, that needs to be in proximity to
that landing point.

170
00:13:28,585 --> 00:13:31,987
So there's a lot of things that have to be done right up front.

171
00:13:32,388 --> 00:13:40,224
And if they've looked at a map and said, we want to do something right here, or they've
already purchased a piece of land, sometimes I've...

172
00:13:40,224 --> 00:13:47,637
usually been successful in saying, us look at a broader uh range on the map here uh and
help identify that.

173
00:13:47,637 --> 00:13:56,842
uh It's just a lot of hard uh geologic engineering, frankly, at the beginning to make sure
that we can deal with that.

174
00:13:56,842 --> 00:14:03,645
You have to deal with earthquakes, tsunamis, uh soil inundation, soil liquefaction.

175
00:14:03,745 --> 00:14:06,614
There's a lot of things that can happen and make that site.

176
00:14:06,614 --> 00:14:15,136
untenable and you don't want to be spending money and losing time, frankly, in today's
world by making, by not being honest about that.

177
00:14:15,157 --> 00:14:26,400
In other words, if I just accepted the truth or the location that somebody recommended
without having addressed all of those concerns, if they still tell me to go anyway, we'll

178
00:14:26,400 --> 00:14:32,392
do that, but I'll make, you know, we'll make sure that that risk has been defined and
outlined right up front.

179
00:14:32,578 --> 00:14:37,501
But sometimes there are reasons to stop a project as you go along.

180
00:14:37,501 --> 00:14:43,886
And I think you can define that risk in your project profile where it's worthwhile
spending some money upfront.

181
00:14:43,886 --> 00:14:54,533
It's not usually a lot because you're not in the construction phase yet, but it's better
to pause and regroup and perhaps look at another location that's more tenable.

182
00:14:54,533 --> 00:15:00,797
uh Maybe we can get more power or better power or better access, et cetera, to utilities.

183
00:15:00,797 --> 00:15:02,598
uh

184
00:15:02,707 --> 00:15:06,047
That's an example uh of that situation.

185
00:15:06,423 --> 00:15:13,729
So Joel, Assured runs with a very lean team and you mentioned a couple times that you lean
on partners.

186
00:15:13,889 --> 00:15:21,025
So how do you keep that quality, trust, accountability high in this type of model?

187
00:15:22,456 --> 00:15:24,667
Well, we hold each other accountable for sure.

188
00:15:24,667 --> 00:15:33,683
But most of that comes from these relationships that have been developed over decades now
and working with people and having worked with them on other projects.

189
00:15:33,683 --> 00:15:35,744
You know that you have a good working relationship.

190
00:15:35,744 --> 00:15:37,255
You know that you can work well together.

191
00:15:37,255 --> 00:15:43,458
uh We know everybody understands delivery, the economics and the risks.

192
00:15:43,458 --> 00:15:45,009
We take all those risks together.

193
00:15:45,009 --> 00:15:48,421
We make sure that we understand them and we communicate well.

194
00:15:48,682 --> 00:15:49,708
understanding

195
00:15:49,708 --> 00:15:55,620
that project schedule, the economics and everything we have to do around project delivery
is key.

196
00:15:55,920 --> 00:16:00,901
People that, you know, understand the whatever it takes mentality.

197
00:16:01,161 --> 00:16:04,652
And that's not to say that we're doing that, you know, and we're going to take a loss.

198
00:16:04,652 --> 00:16:05,733
We're going to do anything like that.

199
00:16:05,733 --> 00:16:14,825
It's just being upfront, communicating the challenges as they develop and are defined to
us and executing together with the team that knows how to get it done.

200
00:16:15,305 --> 00:16:18,486
You solve problems, you know, and you, and you execute and

201
00:16:18,779 --> 00:16:25,471
As long as you walk into that knowingly, oh think it's been a good experience that way.

202
00:16:26,423 --> 00:16:40,231
How much harder has global infrastructure delivery become as geopolitical pressure,
regulation, uh stakeholder complexity, that all continues to rise?

203
00:16:41,326 --> 00:16:48,886
It's hard because it creates risk in a project and it's different types of risk.

204
00:16:49,846 --> 00:16:57,866
Upfront, everybody wants to define the financial plan for the project, the pro forma, if
you will.

205
00:16:57,866 --> 00:16:59,586
How much capital do you need to build this?

206
00:16:59,586 --> 00:17:02,526
What's it gonna cost to operate and sell, et cetera?

207
00:17:02,526 --> 00:17:03,686
What's the valuations?

208
00:17:03,686 --> 00:17:05,006
What are the returns?

209
00:17:05,206 --> 00:17:11,226
So the financial risks are weighed very, very heavily.

210
00:17:11,482 --> 00:17:19,965
That creates, then you have project risk during the development phase, the construction
phase, pre-construction and construction elements.

211
00:17:20,046 --> 00:17:24,167
And that's where all of those permits, environmental work are being done.

212
00:17:24,207 --> 00:17:35,432
So if those things are taking longer than expected or longer than planned, because you
weren't honest about how long it takes or you weren't aware of it, or you just identify

213
00:17:35,432 --> 00:17:40,254
the fact that, now it's taking longer because of X, whatever that X might be.

214
00:17:40,698 --> 00:17:48,242
we can, we can, you have to, you have to look at what the impact to that project is, you
know, and is it a budgetary impact?

215
00:17:48,242 --> 00:17:50,683
Is it uh impact on the customer?

216
00:17:50,683 --> 00:17:55,985
Customers often give you timelines and say they want to be up and operational by X time.

217
00:17:55,985 --> 00:18:00,467
And, you know, and so we're all working together to try to achieve that.

218
00:18:00,547 --> 00:18:06,550
So I think it's mostly around certainty of, you know, and the risk associated with the
finance.

219
00:18:06,936 --> 00:18:12,711
project, you know, both pre-construction and construction elements, and then moving
forward into the operations and maintenance.

220
00:18:12,711 --> 00:18:20,246
So that is getting harder across the board because there's so many things going on that
could impact your project.

221
00:18:20,246 --> 00:18:32,349
You know, I gave the example earlier, impact on the war in Iran and impacting cost of fuel
and all cost of supplies, impact in the financial markets, you know, et cetera.

222
00:18:32,349 --> 00:18:34,390
So it gets everybody on their toes.

223
00:18:35,205 --> 00:18:40,392
Do you think that the world is taking infrastructure resilience seriously enough?

224
00:18:45,711 --> 00:18:51,032
I think unfortunately, sometimes it takes a crisis for people to pay attention to things.

225
00:18:51,462 --> 00:19:02,255
that's a little bit inherent in our psyche, because there hasn't been, if there hasn't
been a crisis for some time, people will stop believing that we need to put some money

226
00:19:02,255 --> 00:19:12,358
into a budget to address things like resilience in your network architecture, or, um, we
haven't had, ah

227
00:19:12,800 --> 00:19:16,742
any kind of seismic activity and earthquake, you know, in over a hundred years.

228
00:19:16,742 --> 00:19:18,823
So those hundred year charts, they're, not good.

229
00:19:18,823 --> 00:19:27,456
We're not going to build into any seismic capability into our design, you know, et cetera,
even though we're in the, we're due for something, right.

230
00:19:27,456 --> 00:19:36,860
uh You don't want to, you don't want to claim doom and gloom, but you also want to be
prepared and be able to develop and design to the, to the right standards and address

231
00:19:36,860 --> 00:19:38,100
these kinds of things.

232
00:19:38,141 --> 00:19:41,202
So I don't think anybody's sleepwalks into risk.

233
00:19:41,202 --> 00:19:42,114
uh

234
00:19:42,114 --> 00:19:51,197
think that both in the project development phase and a project implementation phase, all
the parties need to be able to have open discussions about those elements of risk.

235
00:19:51,197 --> 00:19:56,659
Again, what we just talked about, project, financial, supply chain, you know, all of those
activities.

236
00:19:56,659 --> 00:20:05,832
When there's a strong partnership or a teaming approach to risk itself, and you can have
those open discussions, I find it much easier to navigate the challenges as they present

237
00:20:05,832 --> 00:20:06,862
themselves.

238
00:20:07,801 --> 00:20:09,224
You're expanding into Asia.

239
00:20:09,224 --> 00:20:13,661
What are you seeing in that market that's really important for your next chapter?

240
00:20:14,510 --> 00:20:28,962
There's just a lot of growth uh in Asia, partly because AI is certainly driving everything
globally, but the cloud players, the Neo cloud entries, there's a lot of new entries in

241
00:20:28,962 --> 00:20:30,102
that space.

242
00:20:30,363 --> 00:20:33,986
There's just a rapid acceleration in growth.

243
00:20:33,986 --> 00:20:42,513
frankly, what's happened in Asia, the uh Asian countries and governments are taking
advantage of these opportunities.

244
00:20:42,513 --> 00:20:44,044
They're identifying.

245
00:20:44,338 --> 00:20:47,260
significant amounts of power for particular areas.

246
00:20:47,260 --> 00:20:58,487
They're trying to drive uh GDP growth, frankly, through technology into particular areas
and they're trying to manage it, which I think is great.

247
00:20:58,628 --> 00:21:05,412
They're trying to kind of uh put some of these in uh like technical quarters, if you will.

248
00:21:05,412 --> 00:21:14,198
So whether it's data center or any other kind of industries, they're trying to group these
a little bit and frame them up and make sure they have the right resources, both

249
00:21:14,386 --> 00:21:19,769
not only the land and the power and the connectivity requirements, but also the regulatory
pieces.

250
00:21:19,769 --> 00:21:29,095
So everybody's really working hard to try uh to uh have that growth occur within the
boundaries of their country, right?

251
00:21:29,095 --> 00:21:31,326
And then in specific areas as they manage it.

252
00:21:31,326 --> 00:21:34,138
So Asia in particular, it's booming.

253
00:21:34,138 --> 00:21:38,920
You have the largest populations on the planet, you know, kind of very centralized around
Asia.

254
00:21:38,920 --> 00:21:42,282
So that's where the basis for a lot of that growth.

255
00:21:42,590 --> 00:21:49,261
And a lot of connectivity, obviously, between each of the continents to connect into Asia
and take on that business.

256
00:21:49,261 --> 00:21:50,894
A lot of great people there.

257
00:21:51,154 --> 00:21:59,668
They're smart, they're working hard, they're leaning forward over there, and they've been
great to work with as this acceleration continues to ramp up there.

258
00:22:00,581 --> 00:22:06,335
with projects and missions this intense globally.

259
00:22:06,335 --> 00:22:12,679
How do you build and maintain a culture where people wanna join and stay?

260
00:22:12,940 --> 00:22:14,891
Yeah, it's a great question.

261
00:22:14,891 --> 00:22:17,811
uh I say this all the time.

262
00:22:17,811 --> 00:22:21,452
I'm, I am really blessed to have the people on the team that I have.

263
00:22:21,452 --> 00:22:25,053
I've got a very, very diverse workforce here.

264
00:22:25,513 --> 00:22:27,934
They're willing to jump in and help each other out.

265
00:22:27,934 --> 00:22:33,355
They're, they're extremely experienced uh personnel from across the industry.

266
00:22:33,355 --> 00:22:36,046
uh We're, we're international now.

267
00:22:36,046 --> 00:22:41,218
We're on three continents with these, uh with these folks, our headquarters in Northern
Virginia.

268
00:22:41,218 --> 00:22:42,956
uh

269
00:22:42,956 --> 00:22:51,569
And we have a small cadre of folks that come into the headquarters there, but we have
people in not only Virginia, we, where our headquarters is here, but we're, have people in

270
00:22:51,569 --> 00:23:01,694
Texas, Florida, Colorado, Washington state, uh, plus our European headquarters in Sweden
and our newest headquarters in Singapore and Asia.

271
00:23:01,694 --> 00:23:06,476
So many of these people have had multiple roles throughout their career.

272
00:23:06,476 --> 00:23:08,806
Sometimes some, some of them started in sales.

273
00:23:08,806 --> 00:23:11,822
Some of them started more technical, don't want to be technical anymore.

274
00:23:11,822 --> 00:23:12,938
I get that.

275
00:23:13,869 --> 00:23:16,350
I love the technical side.

276
00:23:18,230 --> 00:23:28,530
But, you one of the key things that I look for is not only bringing that experience to the
table that all of these folks do, but they have demonstrated their ability to work both

277
00:23:28,530 --> 00:23:34,830
independently, especially if you're going to work remotely and be part of a team that kind
of operates remotely.

278
00:23:34,830 --> 00:23:36,770
Some companies operate 100 % remotely.

279
00:23:36,770 --> 00:23:41,150
We're not quite there, but we often work remotely.

280
00:23:41,415 --> 00:23:44,377
but they also have to be able to step in and work in a team environment.

281
00:23:44,377 --> 00:23:55,544
So the tools that we have, uh cloud-based SharePoint, where we can get access to
everything from anywhere, securely, obviously, which is important.

282
00:23:55,544 --> 00:24:01,328
We can share those with customers very easily using those tools, right?

283
00:24:01,328 --> 00:24:04,420
And then the virtual meeting tools, like we're using today, right?

284
00:24:04,420 --> 00:24:10,854
So we use Teams, we use Zoom, and I don't know what this platform is, says Riverside.

285
00:24:11,116 --> 00:24:18,650
Riverside, but there's a lot of great tools just like we're using for this interview that
are out there that we take advantage of.

286
00:24:18,650 --> 00:24:19,491
that helps.

287
00:24:19,491 --> 00:24:31,768
uh Flexible works schedules are key uh to allowing people to work remotely because uh I
think as long as you're getting everything done and you're a team player and you're, and

288
00:24:31,768 --> 00:24:36,641
you're helping out, you you work your schedule and that fits well with people.

289
00:24:36,641 --> 00:24:37,541
They like that.

290
00:24:37,541 --> 00:24:39,118
They like the flexibility.

291
00:24:39,118 --> 00:24:44,198
They also like the autonomy that comes with that, where, you know, you get treated like an
adult, right?

292
00:24:44,198 --> 00:24:47,737
You're, you have expectations you're supposed to deliver.

293
00:24:47,818 --> 00:24:50,218
And if you don't, you got to get to talk to me.

294
00:24:50,218 --> 00:24:54,438
So, I think when everybody gets in that groove, right, you kind of make it happen.

295
00:24:54,438 --> 00:24:58,158
And that's a, it's a beautiful thing when you see that working well.

296
00:24:58,158 --> 00:25:00,618
And, and it's a beautiful thing for me here.

297
00:25:00,618 --> 00:25:01,678
Got a great team.

298
00:25:01,678 --> 00:25:03,590
Like I said, I'm very blessed with it.

299
00:25:03,724 --> 00:25:06,266
but everybody gets on board very quickly to that.

300
00:25:06,266 --> 00:25:12,961
And the people that have come here, they've really, they've expressed to me, they enjoy
this platform that we've developed here.

301
00:25:12,961 --> 00:25:14,802
And it's been through their input.

302
00:25:14,802 --> 00:25:18,905
uh I'm definitely not all the brains here.

303
00:25:18,905 --> 00:25:30,954
So we have a lot of great uh input from everybody on this team and we take that seriously
and we try to build a better mousetrap here on a daily basis.

304
00:25:32,315 --> 00:25:34,079
So let's talk about the future.

305
00:25:34,079 --> 00:25:35,681
What's your long-term vision?

306
00:25:38,094 --> 00:25:43,035
Uh, so let me walk you through a little history, right?

307
00:25:43,035 --> 00:25:45,956
So I started, told you a little bit about how the company started.

308
00:25:45,956 --> 00:25:51,478
So it started as a consulting company where we very quickly built a platform around
service delivery.

309
00:25:51,478 --> 00:25:58,360
Um, and all of the elements from, you know, feasibility strategy, desktop studies, if you
will, right.

310
00:25:58,360 --> 00:26:03,221
All the way through pre-construction construction activities, operations, maintenance and
sales.

311
00:26:03,221 --> 00:26:05,742
added all of those because these were things that

312
00:26:05,742 --> 00:26:09,062
customers want and we built a platform around that.

313
00:26:09,722 --> 00:26:17,502
We've got the financial back office in the back end to support, you know, the sales
activity on behalf of the customer that they really they've they've enjoyed.

314
00:26:17,502 --> 00:26:23,122
wherever we've seen a pain point, we've looked at it and seen if we can address that
ourselves.

315
00:26:23,122 --> 00:26:27,802
We also have moved just so that the growth of the company to owning and operating some of
our own assets.

316
00:26:27,802 --> 00:26:31,262
So we wholly own our asset in Europe.

317
00:26:31,262 --> 00:26:34,102
We're looking at adding more to our portfolio.

318
00:26:34,674 --> 00:26:41,480
We're getting into more partnership where we have an equity position, an ownership stake
and projects that we developed.

319
00:26:41,480 --> 00:26:42,951
We like having skin in the game.

320
00:26:42,951 --> 00:26:46,564
That's a phrase that we use as we participate.

321
00:26:46,564 --> 00:26:59,835
Sometimes that is not the discussion in the beginning of the arrangement, but oftentimes
when we've proven our value and proven that trusted partnership, that's a good way to uh

322
00:26:59,835 --> 00:27:02,017
show that we're here for the long run.

323
00:27:02,017 --> 00:27:04,108
We want to be here for the long run.

324
00:27:04,110 --> 00:27:06,370
and so, and we're going to continue to grow.

325
00:27:08,352 --> 00:27:09,714
That's our goal.

326
00:27:10,437 --> 00:27:11,951
Jill, this has been wonderful.

327
00:27:11,951 --> 00:27:13,636
Thank you for coming on the show.

328
00:27:13,636 --> 00:27:16,221
I'm sure I will see you again soon.

329
00:27:18,107 --> 00:27:19,710
Yes, you take care.

330
00:27:22,362 --> 00:27:24,105
Alright, that was awesome!

331
00:27:24,105 --> 00:27:25,341
That was so good!