Welcome to the TCW Investment Perspectives Podcast, where

2
00:00:10,166 --> 00:00:13,111
our investment professionals share their insights and

3
00:00:13,111 --> 00:00:16,000
expertise on how to make the most of your portfolio.

4
00:00:16,000 --> 00:00:19,475
Today, we examine how the explosive growth in cloud computing and AI is

5
00:00:19,475 --> 00:00:22,950
contributing to record demand for data centers and the electricity that

6
00:00:22,950 --> 00:00:25,348
powers them, and what that means for asset-backed

7
00:00:25,348 --> 00:00:27,599
securities and fixed income markets generally.

8
00:00:27,600 --> 00:00:32,000
I'm David Vick, a Managing Director on the Fixed Income team at TCW.

9
00:00:32,000 --> 00:00:36,960
I have two guests with me today, each with a somewhat
different perspective on the issues created by TCW.

10
00:00:36,960 --> 00:00:38,950
by the growing demand for computing and power.

11
00:00:38,950 --> 00:00:46,380
Nikhil Chopra is a Senior Vice President and a Credit Analyst on
TCW's Fixed Income team, where he focuses on the power sector.

12
00:00:46,380 --> 00:00:51,960
Dominic Bea is also a Senior Vice President in Fixed
Income, where he specializes in asset-backed securities.

13
00:00:51,960 --> 00:00:53,560
Welcome to both of you.

14
00:00:53,560 --> 00:00:56,000
And Dom, let's get started with you.

15
00:00:56,000 --> 00:00:59,060
We know we've seen a ton of demand for data centers.

16
00:00:59,060 --> 00:01:04,960
Can you talk a little bit about where that demand comes from, how
sustainable we expect it to be, and how have markets responded to that?

17
00:01:04,960 --> 00:01:05,939
Yeah, absolutely.

18
00:01:05,939 --> 00:01:09,439
So demand for data centers is rude simply in increased usage of the internet.

19
00:01:09,439 --> 00:01:13,051
Many years ago, we would have talked about surfing the web, but whether

20
00:01:13,051 --> 00:01:16,510
it's mobile, streaming, e-commerce, internet things, work from home,

21
00:01:16,510 --> 00:01:20,020
or artificial intelligence, it's the everyday demand for the usage of

22
00:01:20,020 --> 00:01:23,480
the internet that's driving a demand for data center storage, right?

23
00:01:23,480 --> 00:01:24,859
Because all that data has to live somewhere.

24
00:01:25,269 --> 00:01:29,720
And so whether that data lives on a server that's in a large

25
00:01:29,720 --> 00:01:33,726
purpose-built multi-megawatt facility, that data needs

26
00:01:33,726 --> 00:01:37,880
to be in a data center, needs to be in a physical place.

27
00:01:38,659 --> 00:01:41,319
There's a few ways to think about the sustainability of this trend.

28
00:01:41,319 --> 00:01:50,209
A lot of folks will point to Silicon Valley, smartest, most well-resourced
companies in the world, and they're investing heavily in data centers, right?

29
00:01:50,209 --> 00:01:54,980
Because they know what the forward curve is going
to look like for the need for this data storage.

30
00:01:54,980 --> 00:01:58,459
And they're buying and their long-term leasing data centers hand over fist.

31
00:01:58,459 --> 00:02:01,659
But I also think the man on the street quiz is helpful too.

32
00:02:01,659 --> 00:02:06,180
Like how sustainable do you think the demand
is for a supercomputer in your pocket?

33
00:02:06,180 --> 00:02:07,939
I think it's pretty strong.

34
00:02:07,939 --> 00:02:11,382
So whether sort of, yes, the smartest people in the room or the man

35
00:02:11,382 --> 00:02:14,825
on the street, I think the demand for usage of the internet and the

36
00:02:14,825 --> 00:02:18,320
consequential need to store data is really strong for years to come.

37
00:02:18,680 --> 00:02:21,419
The market has responded a number of ways to serve this need.

38
00:02:21,419 --> 00:02:23,539
So there's sort of three ways to host your data.

39
00:02:23,539 --> 00:02:26,060
There's on-prem, co-location, and cloud.

40
00:02:26,060 --> 00:02:32,879
On-prem is the kind of the old legacy version that's dying,
but it's your data on your servers in your building.

41
00:02:32,879 --> 00:02:36,719
That can be expensive, not efficient, not reliable.

42
00:02:37,099 --> 00:02:38,669
The second way is co-location.

43
00:02:38,669 --> 00:02:41,759
That's your data on your servers in somebody else's building.

44
00:02:41,759 --> 00:02:49,110
This business had some issues several years ago, but some
migrations to different types of hosting have played out.

45
00:02:49,110 --> 00:02:53,960
And this is now sort of a mid-single-digit
growth type business that has a purpose.

46
00:02:54,099 --> 00:02:59,930
The third variety of data hosting, which
is by far the fastest growing, is cloud.

47
00:02:59,930 --> 00:03:03,900
That's your data on third-party servers in third-party business.

48
00:03:03,900 --> 00:03:05,139
This is data as a service.

49
00:03:05,139 --> 00:03:07,759
And this is growing incredibly strongly.

50
00:03:07,759 --> 00:03:14,270
So revenue for, for instance, Microsoft, one of the large cloud service
providers in their web services division, is up 30% year on year.

51
00:03:14,270 --> 00:03:19,860
And this is both due to the organic growth of
data and conversion primarily from on-prem.

52
00:03:20,629 --> 00:03:26,340
Ultimately, most folks will use a combination
of these types of data hosting mechanisms.

53
00:03:26,340 --> 00:03:29,000
Generally speaking, it makes a co-location in cloud.

54
00:03:29,000 --> 00:03:35,479
But each of them have their own characteristics, and ultimately, and we'll talk
more about later, kind of their own credit qualities that you can lend against.

55
00:03:35,479 --> 00:03:35,930
Great.

56
00:03:35,930 --> 00:03:42,250
So if cloud computing is sort of the data centers or the fastest
growth, to build new data centers, what are the biggest challenges?

57
00:03:42,250 --> 00:03:45,419
What's complicated about building data centers these days?

58
00:03:46,210 --> 00:03:46,530
Yeah.

59
00:03:46,530 --> 00:03:48,590
So building new data centers is really tough.

60
00:03:48,590 --> 00:03:53,930
To step back data centers, it's space, connectivity, an operator, and power.

61
00:03:53,930 --> 00:03:56,849
And power is the short supply right now.

62
00:03:56,849 --> 00:04:00,400
It's the chief bottleneck in delivering more capacity to the market.

63
00:04:00,400 --> 00:04:05,120
For instance, in Northern Virginia, it can take
up to seven years to get new data center power.

64
00:04:05,120 --> 00:04:07,449
And in some secondary markets, up to 11 years.

65
00:04:07,449 --> 00:04:08,539
So there's a real bottleneck.

66
00:04:08,539 --> 00:04:09,680
We have enough space.

67
00:04:09,680 --> 00:04:11,730
We have a fair number of cable operators.

68
00:04:11,730 --> 00:04:13,289
We have enough fiber routes.

69
00:04:13,289 --> 00:04:15,439
What we don't have enough of is delivered power.

70
00:04:15,439 --> 00:04:17,779
So maybe that's a good segue to you, Nikhil.

71
00:04:17,779 --> 00:04:24,939
With power being such a critical and potentially limiting factor,
how have electricity providers stepped up to meet the demand?

72
00:04:24,939 --> 00:04:29,160
And what are some other things that they might think about
doing going forward, assuming the demand remains robust?

73
00:04:29,540 --> 00:04:34,370
So I think for the purpose of this discussion, I
would like to divide the market into two segments.

74
00:04:34,370 --> 00:04:35,879
One is the regulated utilities.

75
00:04:35,879 --> 00:04:38,660
The other one is the unregulated power producers.

76
00:04:39,160 --> 00:04:42,395
So for the regulated utilities, which are on fixed return on

77
00:04:42,395 --> 00:04:45,522
their investment, these are utilities which own generation

78
00:04:45,522 --> 00:04:48,379
plans, transmission distribution lines, and the like.

79
00:04:48,379 --> 00:04:50,680
Again, they own a fixed return on their investment.

80
00:04:50,680 --> 00:04:58,240
So there we have seen a response where they're going to build some
new gas plans, some renewables to help support this load growth.

81
00:04:58,500 --> 00:05:06,480
So if you step away from that side of the market into the unregulated power
producer side of the market, here I think the response is somewhat muted.

82
00:05:06,480 --> 00:05:12,740
So the way this works is for the unregulated
power producers, they rely on power prices.

83
00:05:12,740 --> 00:05:16,720
Sustained power prices provide them signals to build new power plants.

84
00:05:16,720 --> 00:05:23,660
And we haven't seen that sustained part yet, and therefore
they're a little gun shy on putting out new power plants.

85
00:05:24,410 --> 00:05:26,740
So there's other limiting factors there as well.

86
00:05:26,740 --> 00:05:30,139
There is new EPA rules that were just introduced recently.

87
00:05:30,139 --> 00:05:33,920
We'll see if the new administration comes in to change those rules.

88
00:05:33,920 --> 00:05:37,420
There's also long backlog for gas turbines.

89
00:05:37,420 --> 00:05:40,939
The interconnect queues for grid operators are very long.

90
00:05:40,939 --> 00:05:44,579
So all these are limiting factors on the unregulated side of the market as well.

91
00:05:44,579 --> 00:05:49,399
So that's why they're a little bit shy of going
out and building new power plants right now.

92
00:05:49,399 --> 00:05:53,399
However, we have seen them step forward in different ways.

93
00:05:54,029 --> 00:05:59,019
They have stepped into other options, for
example, add new megawatts to an existing site.

94
00:05:59,019 --> 00:06:02,496
So if you have a combined cycle gas plant, 500 megawatts,

95
00:06:02,496 --> 00:06:05,668
they're adding 10, 20, 30 megawatts to that plant at

96
00:06:05,668 --> 00:06:08,779
a very cheap cost, which is a great use of capital.

97
00:06:08,779 --> 00:06:10,160
So we are seeing that.

98
00:06:10,160 --> 00:06:16,100
Also, what we are seeing is nuclear plants,
which are decommissioned, being restarted.

99
00:06:16,100 --> 00:06:19,240
That is something we haven't seen in U.S. history.

100
00:06:20,060 --> 00:06:21,980
So the first one was in Palisades, Michigan.

101
00:06:21,980 --> 00:06:33,079
And now the three-mile island in Pennsylvania, where Microsoft stepped up to
sign a 20-year PPA, which is a power purchase agreement starting in 2028.

102
00:06:33,079 --> 00:06:36,420
So this just goes to show the long nature of this demand.

103
00:06:37,139 --> 00:06:43,300
And then lastly, I think the other aspect we are seeing
is some plant retirement schedules being pushed out.

104
00:06:43,300 --> 00:06:46,939
In specific, we are seeing some coal plant
retirement schedules being pushed out.

105
00:06:46,939 --> 00:06:50,339
And large utilities like Duke and Southern have talked about this.

106
00:06:50,339 --> 00:06:57,779
So I think that's how I would characterize how we are seeing these
options and how electricity providers are responding to this.

107
00:06:58,240 --> 00:07:04,339
And if I can make a comment there, I think what Nikhil is
talking about is power being responsive to data centers.

108
00:07:04,339 --> 00:07:07,839
What we've seen increasingly now is data centers being responsive to power.

109
00:07:07,839 --> 00:07:15,660
So now that there's a lack of power, you see data centers trying to co-locate
generation resources or just move to regions where power is available.

110
00:07:16,319 --> 00:07:21,800
And what you're starting to see as well, we started
this podcast off talking about cloud and AI.

111
00:07:21,800 --> 00:07:25,220
These are two uses that are very hungry for data center capacity.

112
00:07:25,220 --> 00:07:26,959
They have different needs.

113
00:07:26,959 --> 00:07:31,139
And so the cloud computing needs to be closer to its load center.

114
00:07:31,139 --> 00:07:34,160
It needs to be close to the people that are calling and demanding the data.

115
00:07:34,160 --> 00:07:35,540
So it needs what we call low latency.

116
00:07:35,540 --> 00:07:43,639
AI, particularly AI training of models, is very hungry in
terms of capacity, but doesn't have a big latency requirement.

117
00:07:44,149 --> 00:07:48,699
And so that can locate closer to sources of power, cheaper sources of power.

118
00:07:48,699 --> 00:07:57,139
And so you see data centers now are being responsive to this problem of
decreased power and moving closer to the load center is part of that.

119
00:07:57,139 --> 00:07:58,779
Got it.

120
00:07:58,779 --> 00:07:59,319
Interesting.

121
00:07:59,319 --> 00:08:02,314
So it sounds like there's a lot of new things in the

122
00:08:02,314 --> 00:08:05,540
works, whether it's recommissioning an old nuclear power

123
00:08:05,540 --> 00:08:08,420
plant or building new generation capacity overall.

124
00:08:08,420 --> 00:08:10,759
It sounds like that requires a fair bit of capital.

125
00:08:11,379 --> 00:08:15,819
How do we expect that to be handled by markets, the inevitable
capital raise that I assume will have to come down the road?

126
00:08:16,819 --> 00:08:20,859
So overall, we feel the markets should be
conducive to finance these investments.

127
00:08:20,859 --> 00:08:27,680
Ultimately, this depends on power prices on the unregulated
side, which we are going to see on a sustained basis.

128
00:08:27,680 --> 00:08:33,980
On the regulated side, again, these are regulated
utilities with investment-grade credit ratings.

129
00:08:33,980 --> 00:08:37,839
So they have access to the market on the debt
side and obviously on the equity side as well.

130
00:08:38,329 --> 00:08:41,659
So we feel that there should be plenty of access
to the market to support these investments.

131
00:08:41,659 --> 00:08:45,812
On the unregulated side, where we haven't seen new power plant

132
00:08:45,812 --> 00:08:49,696
built just yet, and these are companies which are going to

133
00:08:49,696 --> 00:08:53,380
have below investment-grade ratings, double B or below.

134
00:08:53,379 --> 00:08:56,482
We feel that there as well, they will have access to market

135
00:08:56,482 --> 00:08:59,690
once the price signals are very clear or they're able to sign

136
00:08:59,690 --> 00:09:02,740
up for long power purchase agreements on the back of that.

137
00:09:03,299 --> 00:09:06,899
And for data centers, I mean, the markets have already been responsive

138
00:09:06,899 --> 00:09:10,659
All of this construction, and we're talking to put some numbers on this, right?

139
00:09:10,659 --> 00:09:13,899
In 2021, it was $10 billion per random private data center construction.

140
00:09:13,899 --> 00:09:16,460
Now it's a $30 billion pace

141
00:09:16,830 --> 00:09:20,100
This is a big number, and markets have already been responsive.

142
00:09:20,100 --> 00:09:27,100
And so you can finance a data center in the commercial mortgage market, in
the corporate debt market, but you can also finance in the ABS and CMBS.

143
00:09:27,100 --> 00:09:31,905
We have about $30 billion outstanding between ABS and CMBS, and we expect to

144
00:09:31,905 --> 00:09:36,710
see about $10 billion per year in issuance as more and more of this capacity

145
00:09:36,710 --> 00:09:40,061
that's under construction completes and finds its way

146
00:09:40,061 --> 00:09:43,159
from the bank market to the debt capital markets.

147
00:09:44,240 --> 00:09:50,899
So when we're looking at these investments, whether it's on the power side
or in the data center side, what are factors that we think of as important?

148
00:09:50,899 --> 00:09:52,259
You guys are looking at, what do you look at?

149
00:09:52,259 --> 00:09:52,980
What do you think is important?

150
00:09:52,980 --> 00:09:56,720
And what sort of opportunities would you
potentially see as we move forward from here?

151
00:09:57,909 --> 00:10:01,960
So on the power generation side, I think we consider market specifics.

152
00:10:01,960 --> 00:10:05,179
There is multiple unregulated markets in the US.

153
00:10:05,179 --> 00:10:08,200
We, however, do not participate in every market.

154
00:10:08,200 --> 00:10:12,340
There is supply-demand dynamics and other nuances with every market.

155
00:10:12,340 --> 00:10:16,120
So we are selective in which markets we do participate in.

156
00:10:16,460 --> 00:10:24,700
But we do see a lot of opportunities where we have participated in single asset
power plants, financings, or small portfolio financings and things like that.

157
00:10:25,200 --> 00:10:31,899
We also like some tangential industrial-type businesses
which play onto this theme of higher power demand.

158
00:10:31,899 --> 00:10:37,539
For example, businesses which provide infrastructure
like electrical transformers for the grid.

159
00:10:37,539 --> 00:10:39,059
That's a good business to us.

160
00:10:39,059 --> 00:10:42,639
We also like businesses which provide temporary power solutions.

161
00:10:42,639 --> 00:10:47,419
That's, again, an example of a slightly different
business, which we also do tend to like.

162
00:10:47,860 --> 00:10:49,059
On the data center side?

163
00:10:49,059 --> 00:10:53,899
Yeah, so I think the big thing to understand here is
the thrust is coming from cloud service providers.

164
00:10:53,899 --> 00:10:57,740
And cloud service providers are high-quality underlying tenants, right?

165
00:10:57,740 --> 00:11:01,659
So this is Amazon, Microsoft, Google, Oracle.

166
00:11:01,659 --> 00:11:03,519
These are investment-grade counterparts.

167
00:11:03,519 --> 00:11:10,620
And because there's such a lack of data center capacity, these tenants
are willing to sign really long-term leases to lock up supply.

168
00:11:10,620 --> 00:11:14,460
This creates really fantastic assets to lend against.

169
00:11:14,460 --> 00:11:18,365
So we've got brand-new build that's highly efficient

170
00:11:18,365 --> 00:11:21,969
to super high specifications where the payor is,

171
00:11:21,969 --> 00:11:25,799
investment-grade counterparty, for 7, 12, 15 years.

172
00:11:25,799 --> 00:11:30,279
This creates an ideal asset to finance and particularly to securitize.

173
00:11:30,279 --> 00:11:34,299
And so that's why we've seen so much of the data center capacity come to the

174
00:11:34,299 --> 00:11:38,212
asset-backed market where they can get a higher advance rate by pooling in

175
00:11:38,212 --> 00:11:42,019
one of these master trust structures where they put all their assets in.

176
00:11:42,019 --> 00:11:44,503
And we have a claim against a kind of cross-collateralized

177
00:11:44,503 --> 00:11:46,987
pool of assets as opposed to sort of a commercial mortgage

178
00:11:46,987 --> 00:11:49,299
loan where you're just lending against a single asset.

179
00:11:49,299 --> 00:11:56,200
But this industry that's creating these sorts of assets that
have a long-term lease are really attractive for us to finance.

180
00:11:56,200 --> 00:12:03,740
Just to provide some context to the conversation, looking
over the past decade, demand for power has been roughly flat.

181
00:12:03,740 --> 00:12:06,580
But as we look out over the next few years, it's going to

182
00:12:06,580 --> 00:12:09,519
grow at about 3% annualized on the back of data centers and

183
00:12:09,519 --> 00:12:12,359
some other factors like on-shoring, electrification, etc.

184
00:12:12,360 --> 00:12:14,080
So that is one aspect.

185
00:12:14,080 --> 00:12:19,639
But in specific, from data centers, we expect demand to be about 55 to 80 gigs.

186
00:12:19,639 --> 00:12:25,440
And again, just to put that into context, it is something
like adding 40 million new households in the U.S.

187
00:12:25,440 --> 00:12:31,539
And that just provides some context as to what kind of demand numbers we're
looking at, which we haven't seen in a very long time in this country.

188
00:12:31,539 --> 00:12:34,340
Those are some very large numbers, for sure.

189
00:12:34,340 --> 00:12:35,120
Yeah.

190
00:12:35,120 --> 00:12:37,627
And one thing to kind of bring that back to my market

191
00:12:37,627 --> 00:12:40,182
is you have all this issuance that's coming to the ABS

192
00:12:40,182 --> 00:12:42,879
market because it's the ideal sort of structure for this.

193
00:12:42,879 --> 00:12:45,679
The ABS market is much smaller than the corporate market.

194
00:12:45,679 --> 00:12:48,886
And so you sort of have this technical mismatch behind the amount

195
00:12:48,886 --> 00:12:52,093
of construction and capacity that's being delivered and financing

196
00:12:52,093 --> 00:12:55,300
that's needed versus the market where it's sort of the best home.

197
00:12:55,299 --> 00:12:59,279
And right now, data center markets, credit spreads are very tight.

198
00:12:59,279 --> 00:13:08,000
But over the next two, three, four, five years, this is going to apply a major
supply technical to the market, which is going to be favorable to ABS investors.

199
00:13:08,000 --> 00:13:11,379
And Nikhil, you talked about the obviously growing demands for power.

200
00:13:11,379 --> 00:13:14,480
What are some of the options in terms of how to generate that power?

201
00:13:14,480 --> 00:13:22,799
Does it all have to be existing technology or is there things like solar or
smaller generation capabilities that might make sense in this environment?

202
00:13:22,799 --> 00:13:30,200
We think a lot of the companies, the data center companies, they're
looking at new technologies like small modular nuclear reactors.

203
00:13:30,200 --> 00:13:33,159
This is something they're just starting to explore now.

204
00:13:33,159 --> 00:13:35,299
So we do feel that it will take some time.

205
00:13:35,299 --> 00:13:37,080
It is not a near-term solution.

206
00:13:37,080 --> 00:13:39,120
It may be a medium to a long-term solution.

207
00:13:39,509 --> 00:13:46,139
So I think that's the most promising in terms of the load
that they're facing because this is going to be 24-7 load.

208
00:13:46,139 --> 00:13:49,860
And a lot of the renewable technologies are not entirely suited for that.

209
00:13:49,860 --> 00:13:54,320
So in terms of that, that is probably the
most suited technology as we look forward.

210
00:13:54,320 --> 00:13:55,240
Got it.

211
00:13:55,240 --> 00:14:00,960
And if we're looking at a sort of a long-term solution, what's
the risk of obsolescence or something on the data center side?

212
00:14:01,039 --> 00:14:02,940
Like, can you do a long-term power solution?

213
00:14:02,940 --> 00:14:09,080
Does that still work with data centers and potentially the
risk that they're, you know, no longer viable in a few years?

214
00:14:09,820 --> 00:14:14,120
So we think that the demand for data centers
is very strong and very sustainable.

215
00:14:14,120 --> 00:14:19,379
But of course, obsolescence risk is a big problem, especially when
you're talking about something that's so technology intensive.

216
00:14:19,379 --> 00:14:22,779
And it's probably our most important underwriting
criteria when we look at a data center deal.

217
00:14:22,779 --> 00:14:29,539
To simplify a complex topic, there's one ratio you can look
at with a data center called its power unit efficiency ratio.

218
00:14:29,860 --> 00:14:36,120
And that is the total amount of power the data center consumes
divided by the total amount of power consumed by the servers.

219
00:14:36,120 --> 00:14:42,019
So it's telling you how efficient the data center is in terms
of cooling itself because they throw off a lot of heat.

220
00:14:42,019 --> 00:14:47,200
So to put some specific numbers on that, the average
PUE ratio now is a little over one and a half.

221
00:14:47,200 --> 00:14:54,200
The newest and most dynamic data centers being
delivered have a PUE between, say, 1.15 and 1.2.

222
00:14:54,200 --> 00:14:56,820
Anything around 1.3 is considered state-of-the-art.

223
00:14:57,399 --> 00:15:00,899
You have a lot of data centers out there that are older, less efficient.

224
00:15:00,899 --> 00:15:03,220
They weren't purpose-built, so they don't cool as efficiently.

225
00:15:03,220 --> 00:15:07,080
Consuming power around a 2x PUE ratio.

226
00:15:07,080 --> 00:15:11,200
We are really concerned about the obsolescence of those types of assets.

227
00:15:11,200 --> 00:15:14,000
And so we tend to avoid those sorts of exposures.

228
00:15:14,000 --> 00:15:21,980
Going forward, when you look at an asset that's at a 120 PUE currently,
right, there is a question of, you know, how much better can you get?

229
00:15:21,980 --> 00:15:27,019
And what is the marginal impact to going from a 120 to 1.1?

230
00:15:27,019 --> 00:15:33,679
And it's probably not worth building a new data center to replace
something that, say, at a 120, it is if it's a 2.0x, right?

231
00:15:33,679 --> 00:15:37,299
Because that efficiency eventually feeds
through to the cost to operate the data center.

232
00:15:37,299 --> 00:15:41,228
We're really focused on obsolescence, but it's something that you can

233
00:15:41,228 --> 00:15:45,043
quantify, and you can underwrite, and you can make sure that you're

234
00:15:45,043 --> 00:15:48,460
exposed to assets that have a pretty good long-term outlook.

235
00:15:48,889 --> 00:15:49,059
Great.

236
00:15:49,059 --> 00:15:50,039
Thanks, you both.

237
00:15:50,039 --> 00:15:51,399
Some interesting topics, for sure.

238
00:15:51,399 --> 00:15:56,399
Thanks, everyone listening, for tuning in to another
edition of TCW's Investment Perspectives Podcast.

239
00:15:56,399 --> 00:16:01,480
I want to thank Nikhil and Dom for joining me today and
sharing their insights into navigating the markets.

240
00:16:01,480 --> 00:16:06,840
For more information on TCW strategies, please visit our website at tcw.com.

241
00:16:07,409 --> 00:16:11,799
Thanks for listening, and we'll pick up next time exploring
the trends and opportunities shaping global markets.

242
00:16:13,879 --> 00:16:18,070
Thank you for joining us today on TCW Investment Insights.

243
00:16:18,070 --> 00:16:22,730
For more insights from TCW, please visit tcw.com slash insights.

244
00:16:22,730 --> 00:16:30,029
This material is for general information purposes only and does not constitute
an offer to sell or a solicitation of an offer to buy any security.

245
00:16:30,029 --> 00:16:32,934
TCW, its officers, directors, employees, or clients may have

246
00:16:32,934 --> 00:16:35,646
positions in securities or investments mentioned in this

247
00:16:35,646 --> 00:16:38,889
publication, which positions may change at any time without notice.

248
00:16:38,889 --> 00:16:42,735
While the information and statistical data contained herein are based on sources

249
00:16:42,735 --> 00:16:46,341
believed to be reliable, we do not represent that it is accurate and should

250
00:16:46,341 --> 00:16:49,610
not be relied on as such or be the basis for an investment decision.

251
00:16:49,610 --> 00:16:54,870
The information contained herein may include preliminary
information and or, quote, forward-looking statements, end quote.

252
00:16:54,870 --> 00:16:58,950
Due to numerous factors, actual events may
differ substantially from those presented.

253
00:16:58,950 --> 00:17:03,610
TCW assumes no duty to update any forward-looking
statements or opinions in this document.

254
00:17:04,019 --> 00:17:08,769
Any opinions expressed herein are current only as of
the time made and are subject to change without notice.

255
00:17:08,769 --> 00:17:11,430
Past performance is no guarantee of future results.