Mortenson's published case study on Kaiser Borsari Hall at Western Washington University offers one of the more detailed cost-and-schedule breakdowns to come out of a mass timber academic project. The $55 million, four-story building came in $2 million under budget and 25% faster than the original schedule — and the mechanisms behind both figures are directly applicable to developers and GCs evaluating mass timber on future projects. Key Takeaways: Mass timber's lighter structural load allowed the team to eliminate the basement entirely, unlocking $2M in savings — the single largest cost...
Mortenson's published case study on Kaiser Borsari Hall at Western Washington University offers one of the more detailed cost-and-schedule breakdowns to come out of a mass timber academic project. The $55 million, four-story building came in $2 million under budget and 25% faster than the original schedule — and the mechanisms behind both figures are directly applicable to developers and GCs evaluating mass timber on future projects.
Key Takeaways:
For capital partners and developers, the Kaiser Borsari case study is most useful as a framework for where mass timber creates downstream cost optionality — particularly around foundation reduction — rather than as a direct cost benchmark. Geography, timber sourcing distance, and erection timing are all project-specific variables that can significantly shift the outcome. The Living Future certification adds a layer of performance credibility that may support ESG-aligned financing conversations.
Subscribe to Built Different for daily updates on Modular construction reality.
Built Different is a daily podcast for developers, general contractors, and capital partners working in modular, volumetric, and off-site construction.
No hype. No futurism. Just execution reality.
Each episode breaks down what actually determines success or failure in factory-built projects: coordination gaps, design freeze timing, transportation risks, sequencing failures, financing mismatches, and the hidden costs no one models.
This isn't a show about the promise of modular. It's about what happens when modules hit the jobsite—and what you need to get right before they do.
Topics include:
Why modular projects fail (and it's not the factory)
Design freeze and its hidden costs
Transportation as construction risk
Site work that still controls the timeline
Where modular actually saves money—and where it doesn't
Sequencing, coordination, and the gaps between systems