Tune in to The Extra Mile presented by the Mississippi Department of Transportation. Co-hosts Paul Katool and Will Craft take listeners inside the world of transportation infrastructure in Mississippi.
MDOT presents
the Extra Mile podcast.
Welcome into another edition
of the Extra Mile
podcast presented by the Mississippi
Department of Transportation.
I'm Paul Katool.
And as always,
joined by my co-host Will Craft.
And very excited.
We have a third timer on the show today.
Last episode we teased a little bit.
We've been talking all things
the Big Fix.
We're going to really deep dive
into that today
with the director
of the Alternative Program
Deliveries Division, Jessica Dilley.
Jessica, I know you're
pumped to be back with us.
Thank you so much for joining us.
Thank you. I am I'm really excited.
I've been telling everyone
I've got my hat trick
in, like I am here for it.
Thank you for having me.
Of course, of course.
And I know we were talking
before the show.
It's been around a year
since you've been on the on the podcast.
So this is a really cool division
that you that you lead.
It's also,
I would have no idea what it is
unless you told me what it is.
So let's remind our audience,
our viewers, our listeners,
what the APD division is.
Kind of give us a little overview.
Sure. Yeah.
So the alternative Program delivery
division was established in 2023,
and the division was created
to have a space
to be able
to provide innovative solutions
to projects to help expedite delivery,
improve our quality of projects,
and then also provide innovative
solutions to projects.
It we had
we looked at a lot of different names
for the division
when it was being created
because there's a
a variety of different tasks
that are under the division,
including digital delivery,
the Electric vehicle Program grant
and then alternative project delivery.
So we landed on alternative program
delivery.
That way
we could incorporate
a variety of programs to help
reach the goal of the division.
Amazing. You'll do excellent work.
Thank you.
We we try small but mighty
team over there. That's right.
Well, let's
break out a couple of those things
for us.
We're going to get into more of
sort of the alternative
delivery and one sense, but,
maybe just real quickly
touch on what the
what exactly is digital delivery?
So digital delivery is
just what it sounds. Digital.
Digitally
delivering projects through construction
and then creating basically a 3D model
of the living asset of your project.
Okay.
So right now it's it's
kind of hard to believe,
but we still deliver paper plans.
Sure.
So our we've been
designing in 3D for
over a decade.
And what that is is our design
divisions create
basically a model of the project
that they are designing.
And there is a bridge model.
And then there's also a roadway model.
And then that model is printed
and taken to construction.
Right now
we deliver the model for information
only at bid.
But then we also
print actual paper plans.
The plans are at the end of the job
are returned back.
And those are the legal documents. Okay.
So what the digital delivery goal is,
is to create a model as a legal document.
So instead of having those paper plans
come back in, those servers are as built.
Have the model actually come back in
that serve as the as built.
And then that way
that infrastructure can be maintained
through the maintenance
lifecycle as like a digital twin.
Of what our infrastructure is out
in the field.
Very cool. Okay. That's cool. Nice.
And I know we'll get into
some of these other things.
But I did want to just
iron that out a bit.
Because I was a little bit unfamiliar.
And I'm sure you've explained it before,
but I have forgotten.
Well, just jumping right into it.
I know we've got a doozy here today.
Something that,
if you have tuned in to anything Mdot
in the last 2 or 3 weeks, there's no way
you haven't seen something about it.
We have been on the airwaves,
on the TV, on the radio,
and then we had stakeholders meetings.
Last week, meeting
with all kinds of local mayors
and supervisors
and industry officials,
commercial freight folks.
A big one.
What we got going on?
Oh, are you referring to the big fix?
My big.
I just might be fixes in.
Yes.
So this is the largest project that Mdot
has done to date.
And the largest
investment in one singular
let project at a time.
So, it has been quite an undertaking.
We are very excited about it. It has.
We have been working
very hard
towards the delivery of this project.
I believe that in your last podcast,
Barrett mentioned this project
and kind of gave a little teaser into it.
So the project is here in the metro area.
It is just what it's called the big fix.
It's intended to provide an upgrade
to the infrastructure along I-20
and I 55,
due to the age of the infrastructure
and the needs of that infrastructure
out there.
It starts at Wiggins along I-20,
and it follows I-20 going east
all the way to Pearson Road.
And then on the south side
it starts at McDowell,
and then it follows I-55 north to
just north of High Street.
There will
be 36
bridges in the project, and there is 121
lane miles
that we will be improving
along the corridor.
The scope of the job actually
has 45 different scopes of work
that's being handled in the job.
So there's a lot of work being done.
This is our busiest corridor
in the state,
so it's difficult
for us to go in and do some,
routine maintenance
without large traffic impacts
to the traveling public.
Not only does that corridor
serve the metro area, but it also is
a multi-state interstate connector,
so it connects a lot of through freight
traffic and traveling public.
So whenever we do
work through that corridor,
it does
cause a large disruption to traffic.
The infrastructure
through there is around 60 years old.
So the average age of the bridges
along that corridor is around 59 years.
This is potentially our
last major
upgrade of this infrastructure
to extend its life before
replacement will be needed.
And that'll be way off, right?
I mean, I guess what is the goal here?
What are we gaining years wise from this?
The goal is to gain around 40
to 60 additional years on these bridges.
It was basically twice the life.
Doubling the lifespan.
Yes. That's awesome.
And and if you go ahead
and knock this out now. Right.
I mean, this is going to
I know you mentioned a little bit.
Can you give some numbers on that.
So if we do this in two and a half years
instead of how long would this be.
Otherwise.
So we we actually
this project ended up in my division
because we procured it
alternative delivery, which is we
did that different
than our traditional design
bid build process.
There was a lot of thought
and planning that went into
that approach.
And with
that approach,
we're able to bring in the contractor,
they're selected based on qualifications,
and we bring them in,
and they work with us
through the design process
to ensure efficiencies in the job,
work through means and methods, work
through the schedule, work
through planning.
Try to identify
risks and
potential pitfalls during construction
by being able to do that.
We were able to plan
this large scope of work
and this large footprint
that we are undertaking
all this work in two and a half years.
So it's a lot of work
being done in two and a half years.
The intent of that is to try to limit
the impacts to the traffic
and traveling public as much as possible.
If we would
have done this, a traditional design
bid build, we'd be looking at around
probably a five year timeline on the job.
And then if we also
consider peace building the projects
36 bridges, those 36 bridges
have a, need a lot of work.
And so we had contemplated
kind of
bringing it up into
some smaller projects,
and we'd be looking at probably around
15 years of construction
through the area.
That's pretty crazy.
And yeah, you talked about the
the benefits of it.
And it's really
I mean,
first of all, it has to be done, like,
you know, these bridges and the roadway,
you know, it's
it'll give out if it doesn't.
It's a safety thing.
Like, you know,
you want your kids to,
you know, be safe
when they're they're driving this road.
And then you also mentioned,
you know, it's a freight corridor.
Like if you want the things that you need
and want, like this has to be fixed.
It's a major economic issue here.
So anyway, really, really cool project.
And then,
you know,
people have been asking about it
of course on social media everything.
So one of the big kind of questions
right now is like,
when is this work starting?
And you know,
what's kind of like the timeline
of what's going on here?
So we are actually expecting
to probably
have cones out as early as this week.
Wow. All right. Yes.
So first,
people probably
start seeing some barrels, cones out,
potentially some barriers
by the end of the month.
The barriers will be out there
to enable workers to
safely work behind them.
Those will not be lane closures.
They will just be out there
in order to create a barrier
between the traveling public and the work
that's happening behind those barriers.
And then, I'm not sure that we're ready
to get into the large impact
of the full closures,
but we do have two planned full closures
in in that schedule as well.
That is necessary to complete the work.
Excellent, excellent.
And just a time stamp stamp.
This episode is the middle of September.
So is it the 14th today?
Yes.
So anyway, it's it's
getting ready to get rolling then.
For sure.
A couple, a couple of the scope of work
that I think
are valuable
and people might be interested
in hearing about is,
you know, we'll be upgrading the paving
through there.
Right now.
There is, there is some paved.
There was an overlay
that was done that was intended to
kind of
create a patchwork
for this project going in,
and then this overlay that goes in
will extend
the life of that pavement
for 10 to 20 years.
And then also,
like I said, the 36 bridges,
there's several of them
that are being widened
in order to create additional shoulders.
Most of that work is being done.
And what we call the concurrent section,
which is where I 20
and I 55 run concurrently along I 20.
And then we are also
widening out the shoulders
through that entire concurrent section.
And what that does
is that allows a safe space for drivers,
that reduces impacts to our guardrail,
that reduces impacts to the barrier,
the bridge rail.
It also creates a space for
if you run out of gas,
if you, your engine light
comes on, if you get a flat tire,
you have a safe space to pull your car
over to.
I don't know that any of us
understand the real value of that until
it's necessary.
So it
gets the cars
out of the traveling roadway.
It gets them into a safe space.
It gets them out of high speeds.
I even add to that, you know,
you just don't think about it.
Maybe from
if you looked at it in any road,
if you just
if you're thinking about any
highway or any road,
maybe they don't all need,
you know,
huge wide shoulders,
something we're talking about 100,000
plus vehicles coming through here.
I mean, something
so insignificant
as your battery died or a flat tire.
You know, I say insignificant.
It's certainly not.
Would not be insignificant to me
in that moment, I get that.
But something
so sort of easy
to maybe deal with or not,
you know,
a big deal
can shut down the entire corridor.
And so having those shoulders
get the minor
traffic accidents out of the way,
we've had
the state law passed
a couple of years ago
encouraging people to do so.
I know when I was growing up,
it was like,
if you had an accident
or you wrecked or whatever,
it was like, that's where you
you just
you weren't supposed
to touch the vehicle.
You know,
you're supposed to wait
right there until cops
get there or whatever.
That is not necessarily
the case on the highway.
It's like a minor incident, right?
If someone's hurt or injured,
you know, things like that are going on.
Don't don't try to be superhero
or whatever.
To degree that you,
you know, feel comfortable, I guess.
But yes, again, having those shoulders,
I don't think people do
maybe understand myself included
until we really thought about it.
How much of a value that that can be?
When we see 100,000 vehicles
going through there
and something so small. Shut it all down.
Hopefully.
Yeah, we can use that shoulder,
get them out of the way
and keep traffic going.
And a lot of times
whenever we have those delays, we see
ancillary wrecks that happen that further
shut down that interstate.
And getting
getting traffic through
there is our safely,
which is our biggest goal.
And then also improving
the freight movement through there
and just keeping that corridor moving
at all times.
Solutely
no doubt, no doubt.
So you I know you did.
You just mentioned the full closures.
Let's dive into those a little bit more.
So specifics on it.
So the first year it's
going to be in the summer of 2027.
And that's is that westbound.
Yes. Okay.
So like I said the the
you'll start seeing cones
go up in barrels right now.
That from a day to day
standpoint, we have planned
the day to day closures.
The day to day lane
closures have been planned around
our known traffic volumes.
So we m dot
we collect traffic along that corridor
every day.
And we have been doing it for decades.
We have lots of traffic information.
And we have planned the day to day
closures around known holidays,
large events such as the state fair
and general traffic patterns.
So your day to day
closures are going to be at night
and on weekends.
We do recognize
we are in the middle of football season
and there's the
there's a game day travel campaign.
I probably messed that title up.
That's good. Got it. You got it.
So there is going to be closures
on the weekends
or lane closures on the weekends.
So I would just
we highly encourage people to plan ahead,
take extra time.
But yes in the summer of 2027.
So between 4th of July and Labor Day,
there will be a 45 day shutdown
of the interstate along I 20.
The this is a plan shutdown.
So we have
we have worked with a very large team.
Around our experience.
We have shut
down the interstate in this area
a couple times.
So we have used the experience
from those shutdowns
to plan this shutdown.
Those previous
shutdowns, I
will say were emergency lettings.
So this is not an emergency
letting we are trying
to avoid emergency lettings.
We are planning these shutdowns
to try to avoid future emergency
emergency shutdowns.
So it will start after 4th of July.
It'll be 45 days.
In 2027, in the westbound direction.
And then we will have another shutdown
in the eastbound direction
in the summer of 2028.
So that will be starting
after 4th of July
and go through Labor Day.
Wow.
Or it won't go through Labor Day.
It'll be over before Labor Day.
So say much between those two
before football season gets started.
That's it. Yeah.
Yeah.
Because, you know,
every decision we make in
Mississippi is based off of football
like it should be.
Yeah. Kidding, kidding.
Well, that's that's pretty intense.
Very cool.
So what can people kind of do
to prepare for those closures?
I know we've got some time, but what what
our intention
is to inform the public early in often.
So we as, as
you know, y'all have done an amazing job
at working on this campaign
to let people know about this project.
And we want people to plan.
I don't know about you, but
our school schedule has our calendars
scheduled out all the way until June.
I know where I'm going to be on June 4th
according to my children's schedules.
Yeah.
So, you know, we just ask that
y'all start making plans in preparation.
It's going to be here before you know it
and just,
you know,
trying to plan alternate routes,
trying to think about,
getting there safely.
And so planning extra time, seeing you
maybe can work around a different
like try to get to work a little earlier
or leave work
a little earlier,
get to work a little later,
leave work a little later,
try to kind of, plan around the high
traffic volume times,
plan alternate routes.
Just trying to
think about that
in advance of of that July date.
Absolutely. And I like to think about it.
So this is a good thing.
This is a really good thing.
We were being proactive
and we were doing something
that needs to be done.
So we're kind of all in this together.
So I know it's going to be
an inconvenience for people that,
you know, live in the area.
But, you know,
we're doing a really good thing for,
you know,
the investment, our infrastructure
and making sure everybody's can be safe.
So definitely an inconvenience.
But you know we're in this together
right guys?
Well the work that that is being done
under this
closure is cannot be done
under live traffic.
So it has to be done
and it has to be done under a closure.
And so we are trying to make the most of
that closure time period.
That 45 days is driven by
the schedule of the work
that is required to be done
under a closure.
However,
we are going to do some ancillary work
while we were out there, as well,
just to try to meet
that timeline as best as we can.
And I say we
I mean, the contractor team
that we have working on this job, and
so they're going to be doing
as much as they can during that closure.
But their primary focus
is going to be getting in, getting out
and having that schedule
driven by the work.
That can only be done
with the closure in place.
That's amazing.
And when it comes to detours,
I know we have a little
bit of information on that,
but is there anything you can say
about that right now?
So the plan detours,
are part of the closure.
We do have some maps that are
planning Division has helped
create for these.
Those will be published closer to time,
closer to the closure
because we don't want to, you know,
we want people to have the information
at hand
right before the closures happen
or closer to the closures.
We can only close our routes.
So only Mdot maintain routes.
I said we can only close our rules.
We can only detour on after hours.
So
the planned detour will be using
220 and I 55 around that 20 section.
So the the closure will be between 220
and the Pearl River along I 20.
And then.
So the closure will be in closure.
The detour will be along 220
and I 55 in both directions.
We do recognize that people
have those
and mapping devices
and will be using ways,
and we'll be using whichever mapping
platform platform will get you to
where you're going.
So there has we are planning
and there has been a lot of work
that it's done on US 80 and other routes
to help prepare for this shutdown.
So I know
we we often get that question of,
you know,
what have you all done
on some other routes
to help prepare for this?
So I don't know if y'all remember, a year
or two ago
we had some bridges
that were closed on 80.
Yeah, that bridge work
was done in preparation of this job,
knowing that it's
coming down the pipeline.
There was also some, signal coordination
that was done along
80 to help prepare for
this closure as well,
and to hold additional traffic
and to be able to move that traffic along
80 as best as possible.
And then there's some other
projects in the works to help.
Just try to do the best we can
to limit
the impacts on the traveling public.
So and we'll be monitoring that.
I will say the first couple of days
are probably going to be kind of rough.
And we know.
So we're going to
we're going to
have our ears to the ground
and make
sure that we are just trying our best to,
to help make it as.
As possible.
Recognizing that it is
a large undertaking.
Absolutely.
I just want to point out,
I mean, I feel like,
you hear a lot of good things
about them.
You're like,
maybe bad things or, you know, here.
Complaints or issues,
maybe gripes, concerns.
All fair.
Right?
Where government
employees, public sector.
That's just comes with the territory.
This to me is an excellent example,
of your state agency
and Mdot specifically
using every resource available
along with,
I mean,
I almost unquantifiable,
unquantifiable, unquantifiable,
easy for me to say amount
of forethought and planning.
I mean, we're talking about years
in advance of this major, major project,
work
going on on all these enslaved routes.
So that if when we get ready to do this
big project,
if something were to go wrong,
how can we accommodate that traffic?
How can we accommodate
during the detours?
I mean, yes.
And years of advanced planning and work.
And it's one thing
to just put pen to paper and say,
hey, we're going to do these.
And then a couple of years
later, we're going to these.
You're talking
about the financial obligations
of years of budgeting
and crossing over with federal highways.
Our our appropriations bill, which worked
currently under a continuing resolution,
would even have
a, you know, a major infrastructure bill
going forward.
I don't think you could really
ask or expect any more,
of the Mdot
professional staff
than what's been accomplished
on this project.
If I, you know, I just I'm
maybe a bit biased.
I'm inside the building here, but,
you know, everybody wants to be better
and more efficient
and do things better
and differently and change
as things come.
I've seen that happen
on a daily basis here
since since I got here
about a decade ago.
Not that Mdot was horrible
or bad or inefficient, then.
I don't think so. But,
by every count,
I think that we have stepped the game up,
and raised the bar across the way.
And again,
this to me
is just such a great example,
of a real full build out
years in advance of planning
and roll out now.
A couple things I want to that,
that that made me think of
is there are some
items that have been included in this job
in order to help
mitigate some of that impacts
that are different
or above
and beyond
what we would
have done in a standard job.
So one of them is
we have a rolling service
patrol on the job.
So that is designated to this work.
What that'll be
is, is basically a towing company
that will work the limits of the job
to try to move any vehicles
that might impede the traffic
along the corridor out of the way.
So tire comes off.
They'll get the tire, you know.
Yeah. To clean it up.
They'll clean up the area,
make sure that it is it it
the impacts are not due to
Steve Bender monitor.
Right. Yes.
We also will have blue lights,
so I will,
I will touch on the
I it's it's a should be probably
an entire podcast in itself
about work zone safety. Sure.
I think we have talked about safety
a whole lot in this job.
That is really, really important to us.
We will have increased
law enforcement on the job,
as I had said before.
We we plan the day to day closures around
traffic, known historical traffic volumes
to try to reduce that impact.
If you are seeing impacts
on a day to day basis.
It is most likely due to accidents
within the work zone.
And there is a lot of statistics
out there
that show that those
accidents are generally caused by people
that are driving
too fast in the work zone
or distracted driving.
And so, we cannot say enough
how important it is for
people to use works and safety
through here.
We, on a day to day
basis, are going to have around 100
workers out here at any one time,
and then
in most of it's going to be at night.
Most of it is going to be at night
and on weekends.
And then
on some of these higher work times,
we're going to have
almost 200 people
working out there at any one time.
So it is critical for us
to ensure that you, as the driver,
get home safely.
Other drivers get home safely.
But we also allow these men and women
out here
working to get home safely as well.
So works on
safety is going to be very critical.
They will be blue lights
throughout the entire corridor.
Just help.
We want people to
travel through here safely
and get through here efficiently,
but that doesn't always mean
that you're going to be going fast.
Slow.
Is oftentimes better.
Through these work zones,
we want people to slow down.
We want you to get through there
safely though.
And so that's you will see
a lot of blue lights on the job.
And then we also have the largest
smart work zone
incorporated into this job
than we've ever done in the state.
So what a smart work zone is,
is it monitors the traffic speeds
and the traffic volumes
through the work zone.
And then it provides real time alerts
back to drivers
as they are approaching the work zone
or they're in the works.
And so it'll tell drivers
you are approaching stopped vehicles.
You're approaching
queued vehicles you are
it might just tell you
you're approaching a word zone.
So it's trying to give that information
to drivers
before they get to the work zone,
so they know the expectation
when they get in there.
And that has been a huge planning effort.
I think it's really going to be great
and really going to be able
to communicate to drivers
well in advance.
That way you can plan accordingly.
As a driver,
I would pair that with,
you know
what, we talk about using them
dot traffic app all the time around here.
So this would be a great example
of something you know.
All right I'm getting ready
I got a big spare
today for my house
and Brandon Floyd area.
I'm going to check it.
You know. All right.
I'm looking at the Mdot traffic app.
Maybe you go straight to the big fix
our website and look at the interactive
traffic map there.
But you could legitimately look see. Hey.
All right man,
they're moving pretty good
I'm going to go through there.
Let me make double sure.
Let me open the camera
and I can watch the live
traffic there real quick.
It's moving pretty good. Let me go.
Get on the highway.
We don't want you looking at your phone
and checking,
you know,
maybe the the cameras or things.
However, there's going to be a great
big billboard
sort of coming up quick on you
as you get close to that work zone.
It'll let you know,
hey, it's going to be slow,
you know, or whatever
that queue time is, I think, you know,
so you'll be able to pair that
with checking before you go.
And then even as you're
approaching the work again,
I usually have a couple of kids,
you know,
my three kids in the car
and we got Disney
radio blaring,
and everybody wants a different song,
and probably not ideal
for me to look up and say, all right,
this that work zone
backed up today or not,
there's going to be a sign
on on the visible highway
coming up to let you know.
So I love that.
And one other thing I wanted to mention,
because I know
we're probably getting to, you know,
wrapping up on time,
but I do think it's valuable to note,
as as we said,
we procured this project,
alternative delivery.
It has been a huge benefit
to the schedule.
It's been a huge benefit
to the means and methods of the job,
and just ensuring
that we can get all of the
scope done in this project.
But that's
not to say it was a large undertaking.
And we had a
an amazing project development team
that worked on this job for nine months.
On average, I would say we probably met
about four times a week.
Sometimes it was
we were meeting every day.
So we have the JV
that is the contractor on the job.
That is Yates Key.
They are two Mississippi
based contractors.
They are have done
a ton of work in this corridor.
They know this corridor
better than anybody.
Immensely qualified right.
Very qualified to do this work.
They it's a bridge repair primarily.
It's bridge
repair work,
which is very difficult
because you're working
on aged infrastructure.
So you really need qualified people
that understand what it is
that they're getting into.
And they start
getting into this, these bridges.
And then also
we had our design team, which was Bulger.
They did an amazing job
delivering a very large scope of work.
Like I said,
over 45 scopes of work included in this.
They had a very large team working on it
hand in hand with us in the contractor.
Michael Baker was our owner advisor,
which just,
you know, they helped serve as, as
is basically an advisor to M Dot
through the job
to help ensure
that we were asking the right questions.
I, I always say,
especially taking on this new role,
sometimes knowing the right questions
to ask is one of the tallest tasks.
And then we also had
Ice, which is an invasive
contracting and engineering.
They were our independent cost
estimator on the job.
What they helped
do is ensure
that the cost of the job
is fair and reasonable.
And then we also had
our federal partners,
FH w a
that worked
hand in hand with us on this job.
And then we have our CNI team
which is led by Neil Schaefer.
And then they have
the sub Garver
who will be on the project.
And then of course,
our amazing Mdot staff that just
they put a lot of time and effort,
including our communication team.
You all did an amazing job and continue
to do that and roll that out.
And, our district, individuals and all
of our Mdot stop here is just
all hands on deck.
It's been on the job the whole time.
So it's been a
it's been a great experience.
It's definitely
been like
the quintessential definition
of collaboration through it.
And there's a lot of hard questions
and a lot of hard,
hard things
that we've worked through
to ensure
that this project delivery is successful.
Completely agree.
Yeah.
I mean, look,
you all put your
everyone's put their blood, sweat
and tears in this.
So to reiterate to the public like,
you know,
Will is talking about state government.
There can be some,
you know, thoughts on that.
But these are
these are
it's been a level of preparation.
And people are working
really hard for this project.
So I did want to mention
will mention the Mdot traffic app.
And I didn't want to get specific
on the website.
So right now
you can find all the information
that you need
just to get a really good job
of laying everything out.
But anytime you want go to go
dot dot com forward slash the big fix.
And there's a ton of information
on the project.
And you know we'll be adding to it.
So like you know
when the detours finalized
you know when there's other elements
that we need to get out to the public,
find everything there.
So please visit the website.
Absolutely. We're very proud of it, too.
It looks good. It looks great.
Keep going. Yeah. No doubt.
Do want to shout out Christy and Ben
who've also worked with you.
I mean Christie's been so she
she did a lot of work on the website and
really good people.
So that right shout out
Brown Christy as well of course.
Yeah.
Certainly couldn't have done it
without them.
Our IT professional Cameron
Brown as well.
There you go.
Another developer over there.
So really really really good stuff.
So that yeah that's the big fix.
The I 20 I-55
freight corridors
improvement project,
also known as the big things
big deal be going on.
Anything else you wanted to mention
in alternative deliveries real quick.
Anything else that's going on?
You know,
we touched on the digital delivery.
That's a huge,
that is a also a
very collaborative effort.
That's something that we mdot
we're very passionate
about moving forward.
We have some collaboration teams
that we have put together
to help work on that.
And that's something
that we really want
to continue to progress forward.
We feel like
it is a huge benefit
to projects,
to be
able to incorporate new processes
and procedures, to make projects
be delivered more efficiently
and with better quality.
And we feel like
this is the way that that happens.
So we have a few pilot projects
that we've identified
that we would like to progress
forward with digital delivery.
So that's something that we hope
in the near future,
we'll be able to give
some cool updates on
and let you know how that's going.
Maybe that can be, you know, round four.
I don't know.
And then we have some alternative
once we close this out.
This is probably our this is our biggest
alternative delivery project
that we've done to date.
But we want to keep progressing
that program forward.
We want to keep growing it.
We want to keep refining it.
We want to make it a great program.
That's an amazing tool for Mdot.
To be able to deliver projects
in a different way as they see fit.
So whenever we there's a pretty
rigorous process
that we go through to identify
what projects
are appropriate
for these delivery methods.
But they they're certainly out there.
And this delivery method
also helps us have a tool
to be able to respond to emergencies
and help respond to economic development
and things that have maybe
alternate timelines
than just our standard projects.
I know another thing that you
guys work on
spend a lot of time on
because I keep getting the emails.
Grants. Always working on grants.
Yes.
We are always trying to find,
additional funding for Mdot to be able
to move our projects forward
and then make the most of the money
that we are able to receive from our
legislative partners.
We are very grateful for that.
And we want to
make the most of those funds
and be able to provide
additional matches
to them
and be able to make those projects,
you know, the best they can be and,
and move our projects board.
So and that is no small potatoes.
Out there for my Marvel fans,
that's a whole lot of work.
I don't know how many of us out there
put together a grant application before.
It is not a three paragraph essay.
It is a bit more detailed
and they have to be,
we want to ensure the accuracy of those
whenever we put them in.
So we,
we try to be as diligent
as possible to make sure that if we are
thankfully successful,
which we are very grateful for,
every single
opportunity that we have,
we can also deliver on our promises.
So this is a team of 3 or 4 people,
by the way. Two down there.
You guys are crushing it.
They do have a lot of work.
Yeah, we get that money, right?
That's right.
All right.
And then lastly,
I think there's just one other thing.
The electric
the electric vehicle program.
Yes.
So we have
we've we've come a long way on that.
That was prior to the
there was no electric vehicle program
in the state of Mississippi.
So we have put together
a lot of information on that.
And we are hoping to be able
to move that forward here
in the next few months.
Okay.
So to
everyone will see
some information on that, I'm sure.
Well, listen, we,
we got in the technical weeds today,
so let's,
let's back out
and we'll take it away with the
the food question.
Yeah, absolutely.
So we joked
we can't remember
what your suggestion was
last time we were on the show.
It has been a little while,
but as you're familiar,
we love to talk about food
at the end of this episode
or at the end of every episode.
So maybe a food spot
that you don't get to go
by often, that you need time?
You're in the area,
got to swing by here,
or maybe something new that you've tried.
Okay. Yeah.
So we actually, me, my family,
we just spent the last weekend
in New Orleans. Okay.
And every time we go to New Orleans,
we eat at an amazing restaurant
called Dominica. Okay.
It is a John Bass restaurant.
He has several restaurants
down there, including, Luke August.
He has he has a ton.
And he has amazing food.
So if you ever
just are trying to look for like,
a great location,
you know, search
any John Bash restaurant,
you're going to love it.
But Dominica, it's Italian.
And I saw one thing on their menu
that was added or I hadn't seen before.
Maybe.
I don't know if it was added.
I hadn't seen before
because it had been a while
since we had gone.
Is there squid ink pasta?
And it reminded me of a restaurant
we actually have here
locally called Polito.
So that is an Italian restaurant
that's over there in Belle Haven
and they are amazing.
If you haven't eaten there, we ate there.
It was an anniversary or some.
We were celebrating something.
But it's Italian.
I mean, it was one of the best
dinners I've ever had.
Okay. And so if you.
I don't think they're squid
ink pasta is maybe.
I think it's a special.
They run.
It was it was delicious.
I know, you know, maybe.
Maybe.
Doesn't quite
sound like something
you would order off of a standard menu.
But it was it was phenomenal.
But they have other great dishes.
And it was,
it was a really, really good dinner.
So very good. That is
definitely have not
had that one mentioned yet.
I don't think Dominica.
I don't think so, but little Austria.
A couple times for sure.
I still haven't been,
but I went for the first time on Friday
and ate half a chicken.
It was awesome.
Stress ate half a chicken.
They get one.
Were you stressing
because of the big fix?
The big fix? No, not at all.
The Caesar salads.
An elite Caesar salad. Very.
That's a good.
I love a good Caesar salad.
See, Sal,
I also had
we had a Caesar salad and we ate it.
Domenico.
And they did it in the full leaves
like it wasn't chopped.
Oh, my gosh, it was so good.
We're gonna get our Simpson County boy,
I know.
Waiting for something.
You would like it?
You don't have a whole nother
episode on just what that is.
Probably just Google it.
I'm sure that's amazing.
That's a really good answer.
And lots of good things
going on in Belhaven, for sure.
Yeah.
Let's, let's say
one more thing about the big fix.
Yeah, visit the website and then highway.
Mike, we forgot to visit
highway Mike,
you're going to be seeing a lot
about big fix
over the next two and a half years.
And he's kind of going
to guide the process along
and show
everybody we're gonna have
a little bit of fun with it, too.
So, look out for some highway
Mike Michael Flood Facebook
post for sure.
Let's go ahead and wrap things there.
Lots of information to digest.
Jessica,
thank you so much for stopping by
and hanging out with us.
Thank you all for having me.
It was great.
And you know, this is a great project.
I know that it is
going to be an inconvenience
for a few years,
but when we come out of these two
and a half years,
it will be
a large improvement to the area.
We will look
at reducing a lot of future impacts
and a lot of future traffic
inconveniences.
So if you can just be patient with us
for two and a half years,
let us get through this.
I think in the end, you'll
you'll
all will be very pleased
and very happy with with the results
and hopefully, reduce your impacts
and get you where you're going.
Safely and
quickly as possible.
I'll do one more.
I'm sorry.
To me, this is a a heap on this.
Maybe a little too hard, but like,
this is another great example.
Or this is a
great example of things that me as a
a 30 year
old taxpayer in central Mississippi.
This is the stuff
I want to see from my state agencies.
We're talking about the pain now
for so much
less pain in the future, right?
We're going to deal with the issues now.
It will be a little more stress,
a little more strain,
but that is to alleviate so much extra
and additional work and stress issues
in the future.
I mean, that is this is something,
I guess, a best practice I'd want to see
from our state agency.
So again, I'm proud of the work.
Very proud of the work.
Yeah,
I am proud of everyone
that worked on this job.
It was a large undertaking.
But everyone,
everyone did showed up and put it all in.
So it's going to be great.
Top notch.
Let's go ahead and wrap things there.
Thank you to our listeners and viewers
for tuning into the Extra Mile podcast.
You can watch
and listen to episodes
by visiting dot dot com forward
slash the extra mile.
Follow us on social media
at Mississippi Dot is the handle there?
Thank you to our editor
producer Drew Hall, for holding things
down behind the scenes.
Remember to drive
smart out there on Mississippi highways.