Co-op Conversations with DEMCO

In this episode of Co-op Conversations with DEMCO, host David Latona sits down with Mark Phillips, DEMCO’s Chief Engineering and Operations Officer, to discuss the steps to restoring power after a storm.

You’ll learn how DEMCO restores power in a specific sequence—starting with transmission lines and substations and working all the way down to individual service lines—to ensure the greatest number of members are restored as quickly and safely as possible.
Restoring power is a coordinated, step-by-step process rooted in safety, planning, and service.

Be sure to visit DEMCO.org/StormCenter for hurricane preparedness checklists, safety resources, and outage reporting tips.

What is Co-op Conversations with DEMCO?

Discover Co-op Conversations with DEMCO as we explore the power of a local member-owned not-for-profit electric cooperative. Since 1938, DEMCO has woven cooperative principles into every wire, and our business isn’t just about electricity.

At DEMCO, we’re more than just an electric company, and our work, is more than just a job. As a local member-owned cooperative, we are your neighbors, your family and your friends. We exist to serve you, and we take a lot of pride in all that we do.

Our mission is to enhance the quality of life for our members, employees, and communities by safely providing reliable and competitively priced energy services. You’ve probably seen us out in the community—at events on and off duty—doing what we can to make a difference.

And now, you can hear us on your favorite podcast platform as we discuss what makes cooperatives special and inform the community about how we are striving to serve you in everything we do.

DEMCO, Powering life and community, that’s the cooperative difference!

David Latona:
Welcome to Co-op Conversations with DEMCO,
where we dive into the topics that impact your power,

your co-op, and your community. I'm David Latona,
your host.

In our last episode, we talked about storm readiness and all the
behind the scenes work that goes into

preparing our system year-round.

That preparation is not just over a couple of weeks.

Today we're diving into what happens after the storm,
the power restoration process.

Back with me today is Mr. Mark Phillips,
DEMCO's Chief Engineering and Operations Officer.

Mark, thanks again for joining us today.

Mark Phillips:
Yeah, excited to be here.

David Latona:
All right. Good. So once that storm passes,
Mark, what conditions are necessary for our crews to

respond safely?

Mark Phillips:
Depending on the type of weather that we've just experienced,
we attack each one differently,

right? So from a hurricane perspective,
we don't allow our linemen to go up in the bucket until at least,

you know, the winds have dropped below 35 miles an hour,
right?

It's just it's too dangerous in that environment or at that time.

In some regards, floodwaters, right. Floodwaters have to recede.

We have areas of our system that take on water pretty easily.

So it's not always a hurricane;
it could be just an afternoon thunderstorm that dumps an enormous

amount of rainfall on the ground,
and it all flows down.

It seems like it's all headed to Lake Maurepas.

So the water rises fast down there and we have to be able to
safely go through that.

And hey, we have boats. We have access to airboats and drones and
all the other cool things.

But our employee safety is really the most important.

And that gives us an opportunity to get out there and start doing
some, you know, damage assessments. That takes time.

You know, we talked in the last episode about,
you know, we service 9,200 miles of line and depending on the

impact, you have to look at that.

You can't just take for granted that you know that everything is
okay.

You have to put eyes on it. So we do a lot of damage and safety
assessments to protect the public and our members from any downed

power lines or broken poles. And then once we get a good all
clear for an opportunity to go to work,

well, then we'll start sending our crews out to start doing the
restoration.

David Latona:
That's great. It's just overwhelming to me.

9,200 miles of line, that's a tremendous amount.

And I've seen it firsthand, your team working.

And that assessment is not just a notebook and a pencil.

It is very technologically savvy,
and it takes a lot of decisions as to how to attack that

outage best. Walk me through that,
how that decision is made.

Where do you work first in a restoration?

Mark Phillips:
Yes, so there's a process, right?

It's kind of like the old saying you can't have one without the
other,

right. And that's the kind of way we approach outage restoration.

The first thing we look at is our transmission lines to ensure
that they're all energized and up in all clear.

From there, we go to the substation level,
right.

The substation actually takes that transmission voltage,
and it,

you know, it steps it down to usable voltage for our transformers
on the distribution line.

So the substations have to be up,
and we kind of have to have the all clear there.

And then from there we start getting into the distribution
facilities, right. That's the lines that reach into our

communities, right. Reach into our neighborhoods. So those lines
we ensure that the major backbone infrastructure,

that's our you know, it could be real technical here,
but that's our three phase.

Once it's up, and we get the all clear there,
then the little taps that pull off – it's like a river and some

tributaries, right. You got the main river,
and then you have the little Amite Rivers and Comite rivers.

So once we've got all of the main line three phase,
we start looking at those. And it really depends on,

you know, the impact, you know,
how much that line is impacting the community, how many members

are affected? We prioritize it that way,
right.

So we want to get the the biggest chunk on the quickest,
right.

So we attack those, and then we'll work our way all the way down
to the smaller taps,

and then the individuals, right.

David Latona:
That's great. I know that that comparison helps me,
and I know that three phase,

that's when I look up and there's three major lines that work in
tandem to deliver a larger amount of power.

And then those taps are something that comes off and into a
service to a home.

Some of those underground, some overhead,
but nonetheless that service gets smaller when it goes from that

substation all the way down to that meter on a home or business.

Mark Phillips:
That's correct.

David Latona:
Yeah. So why is that sequence so important?

Talk to me about the end of the line and the beginning of the
line.

What helps the power delivery when you go in that order?

Mark Phillips:
It's kind of like I mentioned just before.

You can't have one without the other. So if I start at the back
of the line,

but the front of the line is impacted,
well, I can't get the electricity to flow through the damaged

part, right? We do have devices down the line.

So as we're looking and assessing if we can open up a switch that
isolates damaged portions of the line,

we can energize up to that point while we work on this part.

So, you know, not as many members are impacted.

Same goes for the other way. If it's the other side of the
damage, if I have a loop feed coming around the backside,

I could actually close the switch from a different feeder and
back feed and then really minimize the impact of that outage.

So the sequencing is the most important part,
because I can't deliver power to the end of the line

at the front of the line.

David Latona:
That's a good point. So if there's a tree that is knocked out of
line coming right out of a substation,

but your team makes the repair to the end of that line,
well, there's no power in the line anyway.

So you've got to start at that.

Mark Phillips:
That's correct.

David Latona:
And that's great. Good to hear,
too, that the sectionalizing devices might play a greater role in

getting folks on than even the damage that's on the line.

It's just helpful in getting those members back.

Mark Phillips:
You know, it's really important that we don't skip any of the
steps,

right, that we have outlined for our linemen to follow,
because it can definitely create a very unsafe environment

for the public and for the members and for our linemen,
if we don't have full control of that line.

So by following the order, right,
the order of merit there to get to the end result,

it ensures the safety of both the public,
our members, which are our members,

and our linemen.

David Latona:
That's great. You know, and just to remind our listeners,
you know, our mission includes safety,

reliability and cost effective. So safety is certainly paramount,

Mark Phillips:
Number one.

David Latona:
In that delivery process. That's good.

So let's dive into operations a little bit.

How is the work coordinated? You know,
it sounds like a massive job to me.

When I remember Ida, you know, "the worst natural disaster to hit
our system" DEMCO system.

How is that? I mean, how do you just wrap your mind around the
beginning of that,

that coordinating that work?

Mark Phillips:
Yeah. So you bring up Ida. It was the largest storm to ever
impact our service territory in

regards to restoration and the amount of people that we had in
here.

And it is such a massive job. You know,
our control center operates 24 /7,

365. There's no days off in there because we're monitoring the
grid around the clock and literally around the clock.

There is never a time when a systems operator is not sitting in
front of our outage management system,

monitoring the grid to ensure that all of our members have power.

Having that bird's eye view of our system allows us to address,
you know,

outages as they come in. And those outages come in so many
different ways:

phone calls, text messages, our equipment in the field tells us
that the lights are out before the member calls in some regards.

B ut we do rely on the member a lot to call in and tell us when
their lights are out.

And that outage management system is taking all of those
different avenues and it's dumping into one spot.

And it's kind of helping the map predict where the problems are
so that we can address and send those linemen to the

source of the problem, which is the front of the line,
which is where they're taught to start because of those order of

operations that we talked about a little while,
about restoring power. Put you in the front,

starting from front to back.

David Latona:
That's great. And it really, it shows how historically that
restoration time has changed because of

efficiencies, technologies. Just we're growing in what we know
about power delivery.

And then the equipment also is advancing too.

Mark Phillips:
Yeah. So and just to add, I mean our control center is,
it is driven around technology.

Like it is so impressive how all that stuff orchestrates and
works together.

Some of the stories you'll get from some of our old timers that
are still in there;

I won't say that have left, but they're still in there,
you know,

think about it. You're taking a phone call,
you're writing an outage down on a card, and you're putting that

card on a table. You don't have a map to look at.

You're kind of organizing it amongst where the phone calls are
coming from. Think about how inefficient that was.

But that was the time and how we've grown since then.

To now, you know, the map is telling us not a phone call or a
card or an area is telling us.

You know, we're getting it, you know,
from the grid at that point of delivery.

David Latona:
So good.

Mark Phillips:
Pretty amazing.

David Latona:
So I know we get a lot of questions,
a lot of FAQs, if you will.

So let's take a dive into that proverbial member mailbag.

You know, we get these questions a lot.

Specifically after storms, one in particular,
and I know this might be a little painful because we understand

the truth behind the curtain, right. But why don't we have enough
DEMCO crews to handle everything ourselves?

Mark Phillips:
Well, I'll go back to Hurricane Ida.

You know where we had over 1,200,
you know, linemen come from out of state.

It's just not efficient or economically effective to maintain
that many employees around the

clock. So we have just the right amount of employees to pretty
much do our day to day and do small storm responses.

You know, there's a lot of times,
we'll have an afternoon thunderstorm that'll get us pretty good.

But we don't need the resources from the outside because we can
maintain. Just the the cost associated with employing that

many folks and then having enough for them to do every day when
there's not a storm.

David Latona:
Yeah.

Mark Phillips:
You know that could be challenging.

So it's just, I think we have the perfect balance,
the perfect mix.

And knowing that you can pick up the phone call and just get that
co-op from 50 miles next door or 50 miles south or

50 miles to east, west. And they'll come that day,
and you just kind of employ them as needed,

because when that major weather event hits,
you know, it takes a long time to just build one structure and

put one structure in the ground. But in the event of a storm,
I mean,

we're changing out hundreds of poles,
right where it may take you all day with your crews today to do

one. You know, so it's just speed of recovery,
right?

I think you just you bring the extra resources in for the
recovery part because you can get it done quicker.

David Latona:
Yeah. And you know, storms exist and they happen,
but it's not the majority of our time is the storm response.

So I could see how staffing for the most you might ever need in
the worst natural disaster is not efficient.

Right.

Mark Phillips:
Not at all.

David Latona:
That's not being a good steward of our members finances,
right.

But that, I've seen that in action,
that brotherhood, when they come in and help us out and same us

helping them. It's so valuable. And also there's a certain nuance
to a cooperative infrastructure that they

understand. So they're coming in with some similar terminology.

So when they go through our safety check,
our orientation with them,

they understand a lot of the terminology.

I've seen those guys come in, and they know what to do.

They just need you to get them to the spot that needs the
attention.

Mark Phillips:
Yeah. We love the mutual aid assistance because like I said,
it's an extension of DEMCO.

David Latona:
Yeah.

Mark Phillips:
Right. They're here to provide a service to restore communities
just like they do when they're back home.

So there's a lot of value, a lot of self,
you know, worth that they bring in providing that service to our

communities because they provide it at home as well.

David Latona:
And I know another common question which can sometimes seem like
the opposite.

Why can't I see crews in my area?

My power's out. I don't see anybody working.

You said you got crews here. You know the answer to that.

I want you to explain some of that,
some of those reasons why that equipment and those men are

somewhere else, but they're working on your power.

Mark Phillips:
Yeah. So we talked earlier about the order of restoration.

Right. So if our transmission lines are damaged,
well then those guys are working on our transmission lines.

And, you know, we're a rural utility.

I mean, we're in most people's backyards.

We're cutting through pastures. We're not next to the highway or
next to the road.

We're some, in some instances, miles off of the road.

So a lot of times they're isolated.

Right. Like, yeah, you may not see them because you're in the
subdivision over across the street down the road,

but the subdivision where the line starts,
as we mentioned earlier,

where it's coming through, they may be working in there.

You know, maybe you don't see a DEMCO logo on the truck,
but you see a bucket truck,

right? That bucket truck could be working for us because we do
bring so many outside resources in during some of these major,

major weather events.

David Latona:
That's true. Look, as a member myself,
I appreciate the fact that,

you know, my power goes out sometimes,
too when there's inclement weather,

there's an auto accident, or something.

But rarely do I see a DEMCO vehicle when my lights come back on.

So I know that those guys are working somewhere else,
and that's great.

I want them to work safe and efficient,
and we know that there's a system in place with 9,200 miles of

line. The odds are you're not going to see them when they're
working on your power,

like you said, working on your subdivision.

So here's one that comes in often.

Why does my neighbor have power and I do not?

Mark Phillips:
That's a great question, David. It's the way that the line has
been designed.

A lot of times, you know, we have our main lines coming in,
then we'll have switches and taps.

If we didn't put isolation switches or reclosers or
sectionalizing equipment on the line,

then the smallest outage would cause an enormous impact to the
area.

So rather than, you know, affecting 1,200 members,
let's just say that's associated with a feeder.

I may have a tap that has two people on it.

Well, I'll put a sectionalizing device at the feeder at the
source,

and it will actually open and and clear to prevent from impacting
everybody in that area.

And sometimes this could be, you know,
across the street from you.

So you could have power and your neighbor across the street
couldn't and vice versa.

And it's because we're trying to minimize the impact of outages.

So we sectionalize our grid to support that.

And the finer we can tune it, you know,
as we're getting, you know,

we're diving deeper and deeper into our reliability and our
resiliency and our hardening,

we're trying to minimize the impact of an event that causes an
outage of it impacting the entire community and just isolating

it. So you're probably just isolated because the problem is
associated with you or you and your neighbor or you and a few of

your neighbors. But the feeder actually may support 1,500,
1,400,

1,500 people. And we don't want – that takes a lot of time for
the linemen to ride that and look at that.

If we can pinpoint the location of the problem,
we can restore it quicker,

which we do very well.

David Latona:
That's a great point. And as I understand in that loop,
sometimes the neighbor that's out this time and

others are on, it's going to be reversed because that
sectionalizing device is there.

It's keeping them safe, but also when the damage is elsewhere on
that line,

you're going to be on. The alternative is everybody's out.

Nobody wants that.

Mark Phillips:
No, sir.

David Latona:
So, Mark, I know there's so many more things that are involved
with that emergency management that

is your task during those responses,
but we did cover a lot of what our members are interested in.

Maybe we can have you back again to speak more in depth about
some of these,

but thank you for sharing with us.

It's clear that DEMCO's commitment to safety and reliability is a
nonstop,

year-round process. For members listening,
be sure to visit DEMCO.org/stormcenter and

download your Hurricane Preparedness Checklist,
which is a great resource for any storm,

any situation. And there are other storm prep resources there for
your pets and safety information too.

Thanks for tuning in to Co-op Conversations with DEMCO.

If you liked what you heard, leave us a review.

Like and share the episode with a friend.

Be sure to subscribe so you don't miss an episode.

For Mark Phillips, I'm David Latona.

Let's keep the conversation going.