Investing in self storage gives you the fundamentals and growth you need to grow your portfolio. But skip the opportunities from golf buddies and gurus—invest in a real track record. Started by John Muhich in 1993, AAA Storage has delivered 20% IRR across 90 deals, totaling $450M in exits. Listen to our expert insights on investing from the AAA Storage team. See more at aaastorageinvestments.com.
Paul: There's always something
that can kill a deal that
maybe looked great on paper.
David Lutz: We realized two years after
we bought the land and were looking
to have the fund begin the process
of having that go forward, there was
just too much of of supply available.
It wasn't that way two years earlier.
It was that way two years later,
and we chose to kill the deal.
Paul: It wasn't that you couldn't
lease the property up, it was
it might take 10 years to do it.
David Lutz: We can't create demand.
We can grab demand from
another competitor.
We can try and position ourselves in
front of the rest of the pack, but
the demand in the market is the demand
in the market, I can't create it.
Paul: For every property that you
see in one of our funds, there are
multiple properties that we looked
at that didn't make it to that point.
Welcome to the AAA storage podcast,
your integrated real estate and
development partner, exploring all
things, self storage investing to
bring you diversified success.
Let's dive in.
Paul: Welcome back everybody to another
episode of the AAA Storage podcast.
I'm Paul Bennett, the president
of AAA Storage, and really
happy to be here today.
Brandon Gella, who's usually with
us, uh, is actually in the background
producing today, 'cause we've got a
whole host of folks on the podcast,
and there's not room for everybody.
So, uh, Brandon will be back soon.
Uh, today we, we're
gonna have a lot of fun.
Um, I've got three guys that I have
tremendous respect for, teammates, uh,
of ours, of mine, uh, that are critical
to what we do every day at AAA Storage.
And today we're going to talk about
the investment committee process.
You know, for every property that you
see in one of our funds, there are
multiple properties that we looked
at that didn't make it to that point.
so today we're gonna pull back the
curtain and talk about the, the
process that we run to select land
initially, and then ultimately select
projects that wind up as investments
in one of our multi-property funds.
Uh, because, you know, there, there's
always something that can kill a deal
that maybe looked great on paper.
We're gonna have some fun
today talking about that.
I wanna give you some context
before we get started, just so,
uh, you, you can sort of follow,
uh, our flow here on the podcast.
run a at least a two-step process
with every investment that we make.
Because we land bank land and get it fully
entitled before it goes into one of our
funds, the first step is when we have
a piece of raw land that we're looking
at and we're evaluating as to whether
we wanna buy it with our own capital.
Um, and that's a little bit different
look than looking at a fully designed,
costed project where we've got a
full model and projections, uh, and
making a final investment decision.
So it's a, it's a two-step process,
and today, um, we're gonna go through
that process with Logan Broyles, who's
our lead market analyst, David Lutz,
uh, who is our vice president of, of
property management on the self-storage
side, and Sean Buechler, who's our
director of development and construction.
Three critical legs of the stool,
uh, in our development process.
So, guys, I'm gonna
start with, with Logan.
Um, on the initial l- uh, land
review, Logan, before we've really
had a chance to really do any kind of
detailed design or, or costing, um,
talk a little bit about the process.
Where does it start?
And, and you really lead the
investment committee process and
inform it with a lot of market data.
So talk about the things that you're
trying to pull together as information
for David and Sean, um, and John
Mewick and Andy and I to review.
Logan: Yeah.
Yeah, absolutely.
And I appreciate the intro there, Paul.
Um, I would say, you know, when
I get a, a property come across
my desk, uh, the first thing
that I'm going to do is, is toâ¦
My intent is to look at it
through a, kind of a blank canvas.
Um, you know, uh, with the, the intent
meaning, uh, uh, you know, does it make
sense for self-storage and/or does it
make sense for, uh, industrial biz park,
uh, flex space that we, that we develop.
Um, and really kind of look at
it through each individual, uh,
lens, um, and assess, uh, which,
which could make the most sense.
Is there a viability for
both, um, or, or neither?
Um, and, and really how, how I do
that is first, um, you know, I guess
we start by saying, you know, there's
red flags, some things that can
kind of be immediate deal killers.
And forâ¦
The first thing for me would
be, uh, the size of the
property, the size of the site.
You know, if it's a, you know,
acre and a half, two acre site,
something of that nature, you know,
I can immediately throw it out.
Um, I would say generally, uh,
we're looking for probably a
five to 10 acre, uh, parcel.
I'd say that's kind of our sweet spot,
um, in terms of the size of the property.
So it's got to be within
that range initially.
But, uh, what, what I want
to look for first is try to
define the, uh, the market.
Um, and, and how I go about defining the
market is really, uh, about assessing,
um, the, the population density as well
as the number of quality competitors.
From a storage perspective, we're gonna
look at, uh, things like drive time.
Um, you know, 10 to 15 minutes is
probably the, the national average in
terms of, uh, tenants', uh, drive time
to a given, uh, self-storage facility.
Those are some things I'm gonna look
at initially, uh, taking into account,
you know, things, natural barriers.
Um, you know, we develop predominantly
in Texas, so, uh, we're usually not,
uh, along, uh, any, uh, immediate
coastline or, or, you know, don't,
usually don't have any mountains
or anything else like that.
But if that is the case, the lakes,
rivers, anything that's naturally
segmenting a market, those are
things we're gonna take into account.
Uh, but generally it's gonna be a
three to five-mile radius that we'll
define a market as, uh, depending.
Sometimes it can be beyond that.
Uh, we'll cast a wider net if we need to
take it further out, uh, based off the
population or the number of competitors.
But once we've defined that,
we can really kind of color in,
uh, what the market looks like.
We'll take a look at, on the storage
side, uh, things like, um, uh, household
income, renter occupan- uh, renter,
renter occupied hous- housing units,
uh, what that percentage looks like.
Um, and on the biz park side, we'll
look at, uh, things like, uh, vacancy
rate, absorption rate, uh, the, um, the
market, uh, sale rate, uh, per square
footage, um, of, of given, uh, a property,
uh, average in the market there, as
well as the, uh, market asking rents.
Um, and then across both the storage
and the biz park side, we'll also look
at things like, obviously, population
existing, but also population growth rate.
And then we'll look at things
like, uh, percentage of market
expansion and rental rate trends
on the, on, on that side as well.
Um,
Th-those are kind of s-some things
that we look at individually on the
storage side versus the biz park side,
and there's obviously some crossover
and some things that we look at
that affect both, both asset classes
Paul: Yeah.
You, you mentioned market expansion.
Just explain for a minute
what you mean by that.
That's, that's a key thing
that I know you look at
Logan: Yeah, so market expansion, what
I mean by that is basically, uh, we
look at is there any new supply coming
into the market and to what extent?
So if there's a million square feet of
existing supply in a market that is online
presently, um, and there's lookingâ¦
We're looking to, uh, there- there's
200,000, uh, square feet of additional
supply in the pipeline, whether that's
under construction, in planning, whatever
phase of development it's in, it's not,
it's not currently in the market, but it
is coming, uh, through the pipeline, um,
that would be a 20% market expansion.
Um, so that's something
that we wanna look at.
Uh, 20% is kind of a general, in my
mind, kind of a general rule of thumb.
Like 20% is, is pretty significant.
Um, any- anything beyond
that, that's something that
we wanna take a hard look at.
Um, but thatâ¦
When I say, talk about market
expansion, that's really what I mean
is how much is the market expanding
by with, uh, new supply coming in?
Paul: Yeah, and I, I know David
will talk about this probably in a
minute 'cause we chatted about it
before, uh, we started the podcast.
But you, you could also look at
things like market con- expansion in
combination with other metrics, right?
So if the market's growing at
extraordinary rates, how much expansion
there is in the market may lookâ¦
Uh, the, the comfort point may
look different than a market that's
really not growing very much at all.
So there's, there's some combination of
those metrics that ultimately, uh, make
a, m- you know, make a, a go or no-go
type decision when we're looking at land.
Sean, you're really looking at it
from a whole different standpoint, um,
particularly when we're at stage one,
which is just looking at raw land.
Um, I think at that point, you're,
you're probably less concerned about
actual construction costs because
there's no product that's been designed.
There's no really way
to know what it costs.
What are the kinds of things you're
looking at in that first step when
we're looking to acquire a piece
of land for future development?
Shawn Beichler Export: Yeah, thanks Paul.
So, uh, a number of things that we
look at for a, from a site viability
perspective for the first pass,
kind of at a 30,000 foot view.
Um, there's a lot of entitlement
risks that go with it.
That can be anywhere from, uh,
DOT asking you to widen a road
in front of your entire site.
It can be water issues, where
are you getting water from.
No availability of sewer.
Just any utilities that might, might
hinder it to, that, that make it a no-go.
We also try and do a
preliminary ⦠sketch.
Logan mentioned
a little bit earlier that, you know, if
the site gets too small, you really can't
fit enough on there for it to be viable.
So we wanna make sure that we've got
ability to, uh, uh, not in, in a detailed
civil set or anything like that, just
a site sketch that we're laying out.
Sizes of building and parking
and, and access and all those
good things that you look at to,
to see what you can get on there.
And we will look at, uh, preliminary
costs just to get a high level
view of, uh, what's going into it.
Um, those costs can change
for a number of reasons.
Uh, they can change from, uh,
material costs changing over time
so, or, or, or, prices going up.
It depends on where we're developing this.
Um, generally speaking, as you
get into bigger cities, the, uh,
the, your costs tend to go up.
That has to do with permitting
fees and stuff that comes through
the, uh, permitting office.
As well as, um, just, just the cost of,
uh, development in, in and of itself.
So that's probably the biggest things.
If there's any deal killers in there,
it's probably one of those being there's
some utility that we can't get, such as
sewer, and we don't think the site's big
enough to support us for putting in a,
um, an onsite sewer system, um, wh- which
might, might kill the site u- upfront.
So those are kind of the 30,000 foot
view answers to that
Shawn Beichler: view answers
Paul: Yeah.
Uh, you, you mentioned sewer.
Um, what about water and availability
of water and, and, and fire protection?
Uh, does that at least factor
into what you're looking at?
Shawn Beichler Export: It does.
We look at, uh, uh, uh, where
we're getting the water from.
Is water
Shawn Beichler: even
Shawn Beichler Export: available?
Um, we've, we've, we do water tanks on
site for both fire and water when we
need to, when we're in a very rural site.
Um, you'd like to get that stuff
understood up front as much as you
can, because fire protection can be
extremely expensive if you have, to put,
bring in a f- uh, a big 270,000 gallon
unit and put a pump house on it and
all the good stuff that goes with that.
So some of that stuff can be a, a deal
killer to a deal in and of itself just
because of the cost of the project
Paul: Yeah, I was leading you there
a little bit, 'cause we, we do focus,
al- although not exclusively, we
tend to be city skirt developers.
Not in the urban areas, but more in the
outlying communities around Austin or
San Antonio or Houston or Charlotte.
Um, and in those areas, you can get
into places where you either don't have
access to water and you have to drill
a well, um, and then you have to deal
with fire protection, which in our case
involves bringing in, like you said,
a 270,000, uh, gallon tank, uh, that
probably, I don't know, you would know
better now, but has a cost of somewhere
around a quarter of a million dollars
plus that can, you know, materially
impact the overall cost of a project, so
Shawn Beichler Export: And one
other thing I didn't mention
is we also look at timelines.
So if we're in the middle of Austin,
per se, doing a site in the middle of
Austin, that we know that the permitting
timelines are gonna be elongated and, and
we know that the, the review timelines
and all that stuff are gonna be elongated.
If we're out- outside of the city
limits, outside of the TE- TJ,
and we're just dealing with a fire
district for approvals, we tend to
get through those a lot quicker.
The plans can be a lot more simpler,
so they don't cost as much to get done.
So it, it, really just have to
look at the, the area that we're
going into and, and understand how
that might, affect the timeline.
Paul: Yeah, what about, what
about things specific to the
site, like topography or rock?
Are those things that when you're,
we're looking at land, are those
things that you look at and how they
might impact construction costs?
Shawn Beichler Export: We do.
Um, it may not be as much on the
initial, uh, review just because
you're, might be out on the site just
visually inspecting it, but you can't
st- see things that are below the dirt.
So, uh, in our due diligence
process further down the road, we look
at getting environmental reports back
for phase ones and geotechnical reports
so we know what's the soil like there.
Is it suitable?
Are we gonna have to
bring in a lot of fill?
Like you said earlier, are we gonna
have to dig up a lot of rock, and
figure out what to do with that.
So it does play into it maybe a
little bit more down the road in
between step one and two, but, uh,
just a visual inspection of the site.
Uh, uh, a- as well as looking
at if there's anything there
that's, uh, we've got to demo.
We've got houses or other buildings,
you know, do they have asbestos?
Whatever else that might be, a,
a, a hindrance for us getting it
off the site so we can develop it
Paul: Yeah.
Um, you, you just reminded me, I, I
haven't shared, I haven't kind of brought
our listeners along in the sense that
when we're, when we're looking at a
piece of land, I said we have at least
two investment committee meetings.
It's actually three, at least
three, because we have an initial
meeting to see if we wanna pursue
a piece of land, and that's the
discussion we're having right now.
But then w- we sign a, a non-binding
letter of intent, and then ultimately
a purchase contract, both of which
have due diligence periods in them, um,
usually 45 to 90 days, uh, where we're
actually spending money and resources
to do further due diligence on that
site, and that's really when you get
into the geotechnical stuff, the rock,
look harder at the topo and, and that
type of stuff to either, uh, in- let it
move to the next step or eliminate it.
So th- that due diligence you're
talking about is done during, uh,
once we have it under contract but
aren't yet fully committed to it
'cause we have a- an out based on
the, the ability to do due diligence.
And I, I didn't, I didn't
make that clear for everybody
Shawn Beichler: Yes,
and we're trying to get
Shawn Beichler Export: Yes, and
we're trying to get through when we
go through that due diligence, we're
trying to get every question answered
that we can that would be something
that's gonna affect cost or time.
So is it gonna cost us
more to do this or less?
Is it gonna take us
longer to do this or less?
And we, we just like to have,
uh, all those, those questions
answered before we're actually going
out there and purchasing something.
Paul: I, I think that's a great point.
Um, Sean and, uh, David and Logan
are really looking at the project
from a different standpoint.
You're looking at it almost
exclusively through, from the
standpoint of time and money.
Can we build it for a price that
makes sense, and can we get it
done in a timeframe that supports
our objectives with our investors?
So that's, that's a great
comment on your part.
David, the buck always
stops with you, my friend.
David Luce: I know.
That's, that'sâ¦
But the beauty of that, Paul, is I,
I, I really skirt out on a lot of
all that work, that extra upfront
work that Logan and Sean are doing.
I kinda come in at the last
minute with like the cavalry
and say, "Show me what you got."
It's, it's a beautiful thing
Paul: Yeah, the, David on our
team is the one o- obviously,
ultimately, that's responsible
for delivering the projections.
And so he's sort of the
last, uh, gate, if you will.
Um, he- l- David, a- and probably David,
you play a, a really important role
in the early parts of the process when
we're looking at land, but your role is
really critical when we get to that last
approval before it goes into a fund,
and we'll talk about that in a minute.
But, um, you're leveraging the information
that Logan's developed and provided
to the investment committee and the
information that Sean's developed.
What are the things that you're looking
at from 30,000 s- feet in that very
initial review of a piece of land and in
ultimately the approval to buy the land?
David Lutz: Uh, thank you.
Yeah, that's exactly what I'm, I'm doing.
Um, and I am at a distinct advantage
because of all this data that's being
presented to our committee at that stage.
Um, I'm looking primarily at rooftops
cl- I mean, a- and the beauty of any,
everything I say to you right now,
both Logan and Sean think about it too.
I, that, it's, it's, uhâ¦
But, but I'm looking at rooftops in the
very, the, the, the, the area, the three
to five-mile area that Logan talked about.
But not just current rooftops.
Of course, current rooftops
are super important.
But, but future potential, future rooftops
that might be coming down the pike.
Um, that's vitally important.
So that's, that's a big thing.
I, I do my own due diligence to see if
I can discover, um, any kind of hidden
sort of, what I'll say, uh, secret data
such as the, the development of Costco,
the, the, the, a Costco or, uh, a local,
uh, public school or, you know, these,
these big facility structures that get
put in place when it is deemed growth of
the, of the area is, is imminent, right?
You're not gonna build a new high school
if you don't see it, if the city doesn't
do the research, the $100,000, 300,
$500,000 research to, to see that the
market area is, the area is growing.
So if I see a high school going
in, that's a really positive sign.
If I see b- being built or in the stages
of being built, if I see a, a large
Walmart, I mean, all of those kinds of
s- they're not really subtle factors.
They really impact how we perceive,
or I personally perceive the market,
uh, as in terms of its potential for
growth in rooftops, growth in people.
Um, I try and study per capita, uh,
of the actual supply, of course, and,
and, and ev- like I said, everything
I'm talking about, they're doing too.
But the supply, you know, the, the, the
square footage of storage supply today.
And then if this building is not, this
project is not gonna be built for two
years, what is our projected view of what
the supply is gonna be two years from now?
Are there new competitor, what we call
competitors, but simply are there new
storage facilities in the pipeline?
And there's data out there that allows you
to gather that information and see if in
fact there are, uh, permitting, uh, issues
that have been submitted for new projects.
So all of that research, I'm not saying
I'm doing it all, but I'm doing it
as much as I can, and I know sh- uh,
Logan is doing all that work as well.
Um, just to, to make sure that when we
say, "Yes, we're gonna build it," but more
importantly, when Sean tosses it over the
fence to me and I catch it and it's my
job to run, um, I need to be able to lease
that baby up and lease it up quickly.
And there's only one way to do that,
and that's to have local people coming
in and, and shopping with us, so.
Paul: Yeah.
you, you mentioned Walmart,
Costco, and high schools.
kind of two pieces to that, right?
Um, one, one of those pieces is,
um, you're kind of leveraging
their market research.
You'reâ¦
There's a, a background assumption
that if Walmart thinks there are
enough rooftops to support a Walmart,
then a, a self-storage facility
is probably a pretty good idea.
On the other side, you're alsoâ¦
You, you know from your 23-plus
years of experience that those kind
of facilities drive traffic, and
visibility of a site and traffic by a
site is one of the places we get more
of our tenants than anything else.
Anything you wanna say about that?
David Lutz: I, absolutely, and
I appreciate you f- reminding
me, if you will, of it.
Because access, a- accessibility to
the site is very, very important.
But I want to, I wanna separate two
things, and that is immediate turn
left into our parking lot access.
That's what a McDonald's requires,
a, a, a restaurant requires.
They need to have day in, day out door
turns every single day, all day, to
make sure they can generate revenue.
Restaurants and, and, and
strip malls and things.
And allâ¦
And, and don't be fooled.
If we had that kind of access
to a storage facility, that's
th- the best possible option.
But that's not necessarily
required in self-storage.
We have customers that
are willing to find us.
So if we are slightly off the beaten
path but we are still visible, if we
have a location that is visible to a
highway, by at 70 miles an hour and
they see our big pole sign, and they
say, "Huh, I didn't know that was there.
I only live two miles down the street.
Let me circle back around and go stop by."
Right?
That's very powerful and positive,
uh, uh, you know, a, a very powerful
and positive position for us to be in.
Um, sure, if somebody can drive down the
road and turn right into our driveway on
a, on a road , a road that has 20,000, you
know, uh, cars a day, that's wonderful.
But that's, those, that
land is also very expensive.
And typically , know, we might wanna,
we might wanna look at other land that
might have a little lower price tag.
Of cour- I'm not the buyer of the land,
but I'm just seeing it as a anecdotally.
Um, you know, let's buy the land
that has the narrow strip on the
s- on the road, the big balloon of
the property in the back so that
we can build our store back there,
have a nice big pole sign out front.
And if it can be seen by the highway
going by, that's a trifecta right there
Paul: Well, it, it's ac- actually
really interesting and a littleâ¦
It's not funny, but
it's entertaining to me.
You just mentioned a road with 20,000
cars a day you could make a right turn
or a left turn right into our facility,
and w- I know what Sean was thinking.
Sean was thinking, "Yeah, that'd be great
except for DOT's gonna require a turn
lane and a decel lane, which I'm gonna
have to build at a cost of several hundred
thousand dollars to a million or more."
David Luce: Maybe so
Paul: th- that is sort of the
balance between the two, right?
If you can be highly visible on a
high-traffic road but not necessarily have
your ingress and egress be off that road
where you're gonna absolutely, 90% of the
time, get hit with, you know, additional
costs that are significant to put in
decel lanes and turn lanes, uh, that's
probably the best of all outcomes, so.
Sean, were you, were you sweating a
little bit over there when David was
talking about that 20,000 car a day
street that he was gonna turn off of?
Shawn Beichler: I just saw dollar
Shawn Beichler Export: I just
saw dollar signs in my eyes.
Logan: We have
a follow center
David Luce: H- here's the thing
that I will say, and, and it, I,
I will say it because I'll say it.
Customers will find you
if they want to find you.
And so, um, w- it's not that we're
a destination zone necessarily,
like a big theme park might be,
but, but customers will look for us.
And, and, and when doing the
marketing properly, they'll find us
Paul: And, and the other part of it
is you mentioned McDonald's where they
need literally hundreds or thousands
of people a day in their facility.
Our facilities don't
see that kind of daily
David Luce: No
Paul: move their stuff in and they may
come back once a month or less, depending
on what they've got stored there.
And we have some business customers and
others that are a little more in and out.
But for the most part, it's not nearly the
kind of traffic you see at a McDonald's.
Well, that, that covers what you guys
are looking at and looking for when
we're at the land acquisition stage.
Um, is there any last thing from any
of you, Logan, David, or Sean, that
you wanna kind of throw out there?
Maybe it's an unusual one that for you
would be a no vote when we're looking
at a piece of land in the early stages.
Maybe it's, it's gone
through due diligence.
We're, we're ready to go hard on the
contract where we're gonna put real
money at risk and expect to close.
Is there anything that would be a deal
killer that people listening might
not think about as being an important
aspect of a project or a piece of
land that's intended for a project?
David Luce: Well, I, I'll jump right
in and say I can think about something
that people might actually think about.
I don't wanna say they wouldn't,
but because it happened to us
with one of our recent projects.
David Lutz: We realized two years after
we bought the land and were looking
David Luce: to, to s-
David Lutz: to have the fund,
David Luce: you know,
David Lutz: begin the process
of having that go forward,
David Luce: that the
competition was just too strong.
Itâ¦
Not strong,
David Lutz: there was just too much of,
David Luce: uh, uh,
David Lutz: of supply available
David Luce: and, and
David Lutz: it wasn't that
way two years earlier.
It was that way two years later,
and we chose to kill the deal
David Luce: because supply in this
market area that Logan had identified
was just too, too much, uh, you
know, for us to try and, try and
g- you know, carve out our piece
Paul: it wasn't that you couldn't
lease the property up, it was
it might take 10 years to do it.
David Luce: Right.
That's a problem.
Paul: Yeah, that is definitely a problem
Logan: there's, uh, I guess to add onto
that, um, there's another scenario I, I
would think of in terms of, uh, there's
another property that we have that, um,
you know, based on a couple of, uh, demand
drivers that we identified in the market.
Uh, for one being, um, uh, a
resident- large residential
track, uh, nearby the site.
Um, you know, any type of delay by
that, that specific demand driver,
uh, in this case it could be any,
any driver that's been identified.
Um, a delay in that, um, can really
push a project back and cause
it to be, um, maybe not viable.
Um, you know, maybe, maybe that, you know,
demand is gonna be there 'cause you're
gonna have several thousand households
within, you know, a half mile or a mile
of a site, where in reality that's not
coming to market maybe for another,
you know, year and a half, two years.
That can really, um, kind of alter,
um, you know, projections on, on what
the market may do in the near term
Shawn Beichler Export:
I'll tag onto that as well.
I mean, it w- because it takes us
a, a while to develop a site, 18
months, two years, whatever the
case may be, you, there can be many
changes in the, in the market with
regards to competition in or out.
Um, we get, a, I got into a lot of issues
with, uh, codes changing for buildings.
So
what you thought you could build here
now for this price, they're on a new
code, which now says you've got to have
sprinklers, and so your prices just go up.
Uh, DOT is changing a road, so now, you
know, the access that they were gonna give
you gets changed or modified or removed.
So just you got to watch over time
as, uh, and continue to check on
all of these jurisdictions to make
sure that things are still where
you thought they were to begin with
Paul: We're gonna pivot now.
That's a great one, Sean.
We're gonna pivot now and talk about
the final approval before it goes
into one of our investment vehicles,
um, which is generally almost two
years after we bought the land.
A- a- after step one has been doneâ¦
We, we've sort of gone through two steps.
We looked at the land initially.
We were interested enough to put
it under contract, and then we
completed due diligence and made a
final decision to put our capital
at risk to actually buy the land.
Now, fast-forward 18 months to two
years, and we're back at the table.
You've got a fully designed project.
You've got a full financial model
with projections about what rates
are, what the lease-up rate is gonna
be, what the costs are gonna be.
Um, and we've got updated market data.
That's probably the thing that, that, that
all three of you were just talking about
that can change in that two-year period.
Like David said in his example,
when we bought the land two years
ago, the market looked great.
We came back to the table two years
later, and a number of new facilities
had been built very close to our
site, and the numbers just didn't work
anymore, 'cause two things happened.
Number one, you're not gonna get
the velocity of traffic that you
need to lease up because it's being
spread around multiple facilities.
And number two, when you get in that
environment, you can almost guarantee
that one or more operators are gonna start
cutting rates in order to get customers.
And, and even if you get to a reasonable
occupancy level, the rates are so
low it doesn't make financial sense.
So that's one of the biggest
things that can change between the
initial review and a final review.
But I wanna go back through
the final review, sort of
the same order one last time.
What do you look at, Logan, specifically
when we're getting ready to pull the
trigger on putting a, a, a project
into one of our funds, putting our own
capital at risk alongside our investors,
um, to build a project and lease it up?
What are the core things that
you wanna make sure that, that
we're looking at, and, and the
things that are most important?
And then lastly, what for you is
an absolutely no vote when we get
to that point, if something has
changed or occurred or, or, or been
revealed during that two-year process?
Logan: Yeah, I think, um, you know,
my first thought would be just kind
of what you were talking about in
terms of w- is, is the market, umâ¦
How much has it evolved and kind
of changed over, uh, the, the
time period from when we first
purchased the land till now?
When we're ready to, to, to have the,
the, the fund purchase the property,
um, what does the site look like?
Um, you know, has there been a bunch
of new supply coming in, and it's
completely changed the dynamic?
It's gonna soften rental rates.
It's gonna prolong lease-up.
Um, you know, what, what dynamics
have changed, if any, and what does
that mean, um, to the potential
risk that's, that's in front of us?
Um, that, that's really
what, what I go back to.
So really kind of sorting, you know,
kind of sifting through the market,
uh, data once more to, to really make
sure that I'm confident in what that
picture presents, um, and, and allâ¦
each of those, uh, metrics that I
quantified, uh, initially there in our
discussion, um, make sure that we're, uh,
confident in what those project and where
that's gonna, uh, ultimately lead us with,
uh, returns on the project long term.
Paul: Yeah, and I, I know one
of the things that you do on new
supplies, we don't just depend
on the externally available data.
When we get to that point, making that,
uh, serious a decision, you also actually
talk directly to the planning board or
the people in that local jurisdiction
to make sure that you've got an accurate
understanding of what not only is already
coming out of the ground that we may
be able to see with our eyes, but also
what's in the early stages of planning
or who've, who's approached them about
the possibility of a new facility.
You really dig pretty deep there to make
sure that we don't step in that hole
Logan: Yeah, that's correct.
Um, yeah, and, and confirming
what, you know, what our sourcesâ¦
Obviously we have our own, you know,
uh, different sources that we've
tried to, um, you know, identify
that information from the outset
on, but you're absolutely right.
And, and circling back and, um, you
know, having those discussions with, you,
you mentioned the planning office, for
example, um, and, you know, quantifying
what that supply is and where those
projects are along, uh, in the process.
Are they, um, just somebody that's just
kicking tires in the market, so to speak?
Or is it something that, uh, no, that
project's coming out of the ground and
it's coming out of the ground very soon.
Uh, what does that look like?
Um, so really, uh, making sure that we're
having those conversations and the, um,
you know, kind of have the supporting,
um, you know, su-support of, of the,
the individuals that can really back
up, you know, a, a, a project's validity
and, and, and what's gonna happen there.
So yeah.
Paul: So for you, the biggest swing factor
is where is the, the, the projected market
expansion or new supply in a market?
For you, that's probably the
thing that you look at most.
Sean, you're, you're nowâ¦
You, you've now gone through a process.
Your, your project's fully designed.
It's probably late stage permitting
because before it goes in the fund,
it has to be essentially risk-free
from an entitlement standpoint.
Um, and you've got really
solid cost numbers.
What are the things that you're
looking at when, when youâ¦
when we're at the, at that final step
making an investment decision wi-
armed with all the, the two years'
worth of work that you and your team
have done, um, to vet cost and risk?
What, what are the things that you're
looking at most, uh, m- most closely?
Shawn Beichler: Uh
Shawn Beichler Export: Yeah.
so to that point, Paul,
going into the fund, I
Shawn Beichler: in
Shawn Beichler Export: a perfect world,
Shawn Beichler: we'd like to have a site
Shawn Beichler Export: fully
entitled, fully permitted, n- no
stones unturned so that when we
buy it, we're ready to start and,
Shawn Beichler: and, c-
Shawn Beichler Export: and,
get on with it.
During that time, though, towards
the end of the, the, that two-year
period, we've got a lot of balls
in the air that we're juggling.
So Logan's got a lending
ball that he's got in there.
I've got a site
permit.
I've got building permits.
I've got, uh, different permits
that are requi- DOT permits.
They all have different timelines,
so we're trying to make sure that
we're keeping those permits in check.
Sometimes I might have to get an extension
on one, so we're just m- trying to make
sure that we keep every entitlement
piece that we've got in place, uh, valid
so that we don't have any hiccups down
the road once we've purchased the site
Paul: work in that final stage really
as much about informing all the
other aspects of it than it isâ¦
We're not gonna go or no-go
because a project cost 110 bucks
a foot versus 100 bucks a foot.
But we are gonna go or no-go based
on the combination of what it's
gonna cost per foot, what the rental
rates are in that market, and what
kind of economics it can produce.
So it really is, y-your, your piece at
the last stage is really an input piece.
Here's what it's gonna cost.
Here are any risk or remaining
open items on the entitlement side.
And then for you to start construction,
obviously we've gotta have the equity
in place, you've gotta have permits in
hand, and we've gotta have construction
financing, uh, that's ready to close
before you can actually put bulldozers
on the site and start construction
Shawn Beichler: go out to bid
Shawn Beichler Export: We'll also
go out to bid on these projects, so
we're looking at, you know, multiple
GCs to get the best number out there.
I mean, in today's environment, those
bids are good for only a certain amount
of time, so you've gotta make sure
that you, you're, not going out to
bid too early, but you're not doing
it too late so that you're, you're,
you're, missing the boat on the on the
buy.
Um
Paul: you you juggle a lot of, like
you said, a lot of balls there at the
end of the process trying to make sure
everything's ready to go, but kind
of dependent on other things that are
beyond your control, like the equity
availability and, and the loans.
David, again, the buck
stops with you, my friend.
David Luce: That's correct
Paul: y- you're probably the most critical
voice in the room we're making a final
decision because the one that's accepting
responsibility and accountability
for delivering the projections that,
that our analyst team have, have made
based on Sean's construction cost and
timelines and Logan's market data.
Um, talk about what are you looking at,
what are the things that matter most
to you in that final decision stage?
David Luce: Of course, the ultimate
question is can the store, the site
lease up in the timeline that we
predict, that in the timelineâ¦
And, and the answer to the question,
Paul, is per capita, uh, uh, supply.
Is square foot per capita.
I mean, you start getting in the yellow
zone into the bright orange and red
zone when you're at seven, eight,
nine square foot per capita per day.
Nine is like red zone.
Pfft, no, but if we couldâ¦
If, if it's lower than that, if it's down,
you know, to three, four, five, that's,
that's a huge factor because I can'tâ¦
You said it to me several times
in several of our conversations.
David Lutz: We can't create demand.
We can grab demand from
another competitor.
We can try and position ourselves
David Luce: in,
David Lutz: in front of the rest
of the pack, but the demand in the
market is the demand in the market,
David Luce: and I can't change h-
David Lutz: I can't create it.
David Luce: So if, if we're at a nine
or a 10 square foot per capita, there I
can't create demand to fill the store.
Paul: Yeah
David Luce: So, so that's a really
Logan: Can you
David Luce: big element.
I, I then
Paul: It
David Luce: take a look at
our, our past site, uh, uh, our
past numbers, our past stores.
We have lots of relatively new
stores that we've built in the
last three to five years, and I,
I compare the markets with those.
I look at a, a store in a small town
like Cibolo, Texas, or, or a bigger
store like San Antonio, Texas, and,
and try and find a, a match, right?
And to see what we're
looking at versus how, howâ¦
And is there a comparison I can draw,
um, between, between what we've done
in the past, um, and, and what this is.
And, it's just then you just have
to say, "What's your gut feel?"
I've been doing this
since 2002 for 25 years,
24 years.
And you just say, "Yes, I
can lease this store up."
We said that about, uh,
the North Carolina store.
Um, things might have changed there, but
I said, "Yes, I think, I know," actually,
not think, "I can lease this store up.
Let's go forward with
it from my perspective."
and the other store in, in the local,
the small Hutto, uh, Hutto store, I, I
agreed that no, this just wasn't possible.
So some of it's gut, gut feeling.
Uh, some of it's comparison of,
of what we've done in the past.
Um, but I can't create
demand that is saturated
Paul: Yeah, yeah.
That, that's the key dynamic for you.
You, you brought up a great example.
I, I'm gonna, I'm gonna expand
on it and, and we can talk about
it for a minute if you want to.
But Fund II, our current fund,
had a property in Hutto, Texas,
and when we bought the land, the,
the site looked good for both
self-storage and small-bay industrial.
And so we designed a project on that site.
Sean was three-quarters of
the way through permitting it.
Um, the site was designed,
everything was moving forward.
And when we went back to look at the
data, the storage market was oversupplied.
And
David Luce: Yes
Paul: knew you knew, and you told
us that that wasn't a, a storage
facility that you had confidence in.
So what we did is we went back to Sean's
group, and we completely redesigned
the site as a small-bay industrial park
only because dynamic on the small-bay
side happened to be 180 degrees from
storage because of a Samsung chip plant
that's built on 3,000-plus acres, and I
think it's over a million square feet.
And our site is literally within a
eight-minute drive of that facility,
David Luce: That's right
Paul: facility had created huge demand
for small-bay space by suppliers and
vendors that were supporting Samsung.
So we actually took a project that
had been approved in the early stages
as both storage and, and, and small
bay, and flipped it into a small
bay only because the storage market,
in your opinion, just wasn't there.
David Luce: right
Paul: a, that's a, that's a good
example of how our process tries
to catch shifts in the market.
Youâ¦
Because in development, you, y- y- you
buy a piece of land today, but you know
you're not delivering a product for two
y- to actually two and a half years.
Um, I, I think we've talked about this on
the, the, on the podcast before, but our
process, it's about a four-year process
to stabilize a self-storage facility.
Four to four and a half years.
It takes Sean and his team six to eight
months to get it built on average.
Uh, and then David, it takes your team
12 to 18 months to lease it up to 70
or so percent in phase one, uh, which
is usually about half the project.
Uh, and, and then we, we
break ground on phase two.
It goes a little faster because
the site work is al- already done.
And then the ball comes back to you
to push that facility across the
final lease-up threshold where we
stabilize it and, and we can sell it.
So you've got two years of pre-development
work and four years of, of actual
construction and lease-up activity.
It's
David Luce: Yeah
Paul: window from the time we buy the
land, and lots can change and move
around in a six-year period like that
Um, any last comments on, on things that
are s- or, or jump out at you that are
really no-go, um, from a, a property
standpoint for any of the three of you?
David Lutz: Well, I, I can jump
in and say my last comment forâ¦
I- is less about the no-go
because in me, for me, the real
no-go is, is demand in the area.
That, that's the one big factor.
Um, but I would wanna leave the
audience with this thought, that rules
and guidelines are great, and also
rules are meant to have exceptions.
And you just can'tâ¦
And, and the example specifically
is we, we, we joked with
Sean about 20,000 cars a day.
and that's a beautiful thing
if you, if you're actually
on a road s- 20,000, 15, 20.
Uh, just built a store in the middle
of 2024, opened it up in Cibolo, Texas,
in which the road traffic count on that
store's road was zero per day, right?
It's, it was at the end of a run.
The run turned.
There wa- Now, the good news is,
uh, not 100 yards up the hill was a
very large housing development that
was just 10% complete, and it was
g- I can't remember how many, how
many rooftops we were gonna see.
But clearly one factor
overrode the other factor.
Y- you just can't just assume that
if it's, if it's on a dead road,
that it's gonna be a dead site.
It's not the case.
So rules are meant to have exceptions.
That's, that's my point
Paul: Yeah, and, and that's, that's
Simplot property's in growth fund
one, um, and it's in final lease up.
And I looked at the numbers today
'cause I was working on the update for
our investors, and it's right at 50%
occupied as of the end of August, um,
David Luce: After phase two.
After phase two.
Don't be fooled.
Paul: phase
David Luce: a big difference.
Yeah, yeah
Paul: And, uh, and, and really on
track to hit that four to four and
a half year timeframe that we like
to get a property fully built,
stabilized, and, and, and sell it.
Guys, this has been fun for me.
I, Iâ¦
It's great for folks out there to
get a little bit of a glimpse of,
of how the team works together.
The last step in the, um, decision
process, however, steps away
from the three of you 'cause
it's an investment decision.
So the, the construction numbers that
Sean has put together, the market data
that David has then used to say, "I'm
comfortable with these projections.
Uh, I, I could deliver that result,
um, over the next four years," all come
together with the final step is John, and
Andy, and myself looking at the pro forma,
along with our analyst, and saying, "Given
the risk that we see, are the returns that
this property has projected to produce
acceptable to us and to our investors?"
So it, it, it starts with all of
the things that you guys have talked
about, and the end result is all those
inputs go into a financial model.
Theâ¦
How fast it leases up.
What are the rental rates
that we're projecting?
What kind of rental rate increases,
if any, are we projecting?
What was the cost?
What's the relationship
between cost and rental rates?
What's the yield on cost?
Which is something we've done entire
podcast on in terms of able to predict
and project, uh, the future profits from
developing, uh, a piece of real estate.
Um, but it, itâ¦
The final step in the process is
really a look at the pro forma and
the returns to our investors, and do
they meet our standard and, and the,
the kind of results we produce for,
uh, investors over the last 33 years.
As we wrap up, guys, I thank
you for being with us today.
I wanna encourage you, if you'd like
to learn more about AAA Storage and
just investing in commercial real
estate in general, be sure to visit
our website, aaastorageinvestments.com.
Uh, you'll find an Insights tab there
where, uh, you can, uh, it's, there are
links to all 50 of the podcast episodes
where we've covered lots of information
over the last year, year and a half.
Uh, there's also information you
can download about c- investing
in commercial real estate and,
and how to be a better investor.
Um, so just encourage you to visit
the website, feed on that information,
and thanks again for being with us.