The Nuclear Investing Podcast features thoughtful, in-depth conversations about one of the most important pieces of the global energy mix: nuclear power.
Through interviews with leading industry leaders, investors, and policymakers, the show explores how nuclear energy is becoming central to the clean energy transition — and how investors are gearing up to support it.
Each episode gets to the root of how companies plan to build, finance, and deploy next-generation nuclear projects — and how they aim to create lasting value for investors and society.
The goal: to advance awareness and informed participation in the future of clean, reliable energy.
So Kairos is not just the technology provider, we're the manufacturer of
equipment, we're the integrator of a lot of systems that are coming together.
We're the owner-operator of the first plant, so we have a lot more
control over the project.
Iterating. Build, learn, repeat. Build, learn, repeat.
Kairos fits that mold better than anyone I've seen in
the space.
Building that credibility has been key, and so the philosophy has always been,
well, whatever you see at the surface should look better when you dive.
The deeper you dive in, the better things should look.
Welcome to another episode of the "Nuclear Investing Podcast." I'm your host,
Brennan Moore. Today, I'm sitting down with Mike Laufer, co-founder and CEO
of Kairos Power. This one is a real treat.
Full disclosure, those of you who know me know I'm a big fan and personally an
investor in Kairos. This is the exact sort of thing that my firm, Nuclear Capital
Partners, has been formed to invest in.
Now, one thing, if you usually just listen, I highly encourage you to watch this
one on YouTube or Spotify. We have footage throughout, and you really
have to see what Kairos is building.
It's truly impressive, and you have to see it to appreciate it.
Here's my conversation with Mike Laufer. Welcome to the show, man.
Honored to have you on.
It's great to be here, Brennan. I'm excited.
Yeah, it's been so great getting to know you and your team and seeing what you're
building, and there's so much to cover.
I'm going to try, Mike, to fly through the Kairos story in three or
four minutes and give us an overview, and then you plug in any holes and correct
me at the end, okay? Because I think that'll allow us...
We could spend 30 minutes just giving the overview, and I think that'll allow us to
really hop in on some of the details of the story. That work?
That works well.
Little bit of a lightning round. Okay, Kairos in four minutes. Here we go.
Founded in 2016, about 10 years ago.
Over 600 employees spread across Alameda, California, the headquarters,
Albuquerque, New Mexico, the manufacturing hub, and Oak Ridge, Tennessee,
the deployment hub. Kairos' reactor, the KP-FHR,
Kairos Power Fluoride Salt-Cooled High-Temperature Reactor.
Its coolant is fluoride salt, a type of molten salt.
Fuel, HALEU, using solid TRISO.
The reactor operates at near atmospheric pressure, which we'll talk about in a bit.
Commercial reactor size, 75 megawatts electric.
Plant size, 150 megawatt electric, which is two reactors, one
turbine. What sets Kairos apart? Well, there's a lot of things on
the regulatory front, commercial, vertical integration, DOE
funding. Let's get into it. On the regulatory side, Kairos had the
first Gen IV reactor to receive an NRC construction permit in
2023.
On the commercial side, their partners include Google, the Tennessee Valley
Authority, TVA, Samsung C&T,
BWXT, among many others. They have a development agreement with
Google to deploy up to 500 megawatts by 2035 to power
Google's data centers. They have a power purchase agreement with the Tennessee
Valley Authority for the first 50 megawatts of the Google agreement, and this was
the first US utility PPA signed to buy
power from a Gen IV reactor.
Samsung C&T, a construction partner, recently invested up to 100 million
dollars in cash and in-kind services.
BWXT, collaborating on commercial TRISO fuel.
KP-OMADA utility alliance. This is Kairos and leading North
American utilities, AEP, Bruce Power, Constellation,
Dominion Energy, Entergy, Southern Company, and TVA.
Vertical integration. Kairos is manufacturing their own reactor
vessels and modules, graphite, molten salt coolant,
TRISO fuel pebbles, and many other things.
And the idea here is to control cost and deployment timelines.
They really need to do as much of this as they can in-house.
DOE funding. Kairos has received up to 578 million
dollars in DOE funding. That was initial 303
million in milestone-based funding through the ARDP program, and
recently, an additional 275 million announced for Hermes 2.
Now, what is Hermes 2? Hermes 2 is Kairos' first
commercial-scale reactor, targeted for operations as early as
2030, and the power generated by Hermes 2 goes towards the
50-megawatt power purchase agreement with TVA.
Kairos has done in-house demonstration projects, engineering test units
one, two, three, and Hermes 1. More on that later.
Their investors include Google, Google Ventures, Samsung
C&T, DCVC, and Nuclear Capital
Partners, one of the most impressive organizations
you will see in the space,
and one of the quietest. Mike, I love this about how you built it into the
DNA of the organization. We're going to do it first and talk
about it later. Mike, fill in the holes. What did I miss?
Did I get anything wrong, or did I miss anything? Off to you.
Well, Brennan, you make it sound a lot like sunshine and roses,
but behind that is 10 years of incredibly hard work
from the entire Kairos team, and that focus, I think, is what
sets us apart or at least differentiates us from many in the space,
which thankfully is crowded. A lot of people are trying things, but what
we're doing is hard, and we've had our heads down trying to do it the way that we
think is the right way and that makes sense to us.
And through that process, we've learned a tremendous amount, and
if you kind of boil it all down, in the early days of Kairos, we were trying to
figure a lot of things out about how to do things differently in the nuclear space,
and we didn't know if there were even answers to a lot of those questions.
And so, before we even got to the point of saying we have a product, I
said over and over again, what we're really trying to build is credibility.
A lot of excitement, a lot of momentum in the space, but credibility
takes a long time and a lot of hard work to earn, and unfortunately, can be lost
very quickly. And so, that's what we need in the space in order to deliver,
and everything kind of boils down to how do we maintain
that credibility of actually being able to deliver anything?
Because from my perspective- When you translate kind of the need, the
demand, which is there, and kind of the challenges of executing and growing and
scaling, it's really easy to get out over your skis in this one.
And so we've been really focused on doing it the way that we think makes
sense and being able to adapt and be agile.
And
I'm glad that there are some newcomers who are trying to do it in a similar way,
but proud of the record we've put together, and we've got 10
years of hard work at this and
what I think looks like a running start as far as we're concerned.
Yeah, that's another thing I love and respect so much, Mike, is just the honesty.
It's like no one said this was going to be easy, and you're very upfront and honest
about that. I want to go back to the early days, 10-plus years ago,
when this project was being developed by MIT in partnership with UC
Berkeley and Wisconsin. What made you and your co-founders, Ed
Blandford and Per Peterson at the time, fall in love with this specific
technology?
Yeah, so it was not a given that this was going to spin out of
what was a really exciting period in terms of university progress.
There was sort of a whole cohort of grad students, I was among them,
working on this technology and sort of doing exciting things that
I would say is not really in the normal realm of what grad students get to
do. But
I'm thankful that we had support from DOE to ask some of those tough
questions. There are two things that I think were really impactful that kind of led
to the formation of Kairos, and they were sort of,
neither of them were a given. The first one was Ed, Per, and I
were very close students to try and find useful
analogies in other complex technology fields to find examples of
how we might incorporate lessons to do nuclear power in a
different way. And over and over again, we
kept coming back to SpaceX as
not a perfect model, but probably the most instructive model.
SpaceX of
2002 to 2012 is very different than the SpaceX today.
Yeah. You were early.
People need to realize that this was a period where, in
2004, they had not successfully launched a rocket,
and no one really believed that it was possible for a scrappy
startup essentially to do this. This was what governments did, not what startup
companies were able to do.
Yeah.
So there was a lot of disbelief that they could even do it at all.
And the analogies for the nuclear industry to the aerospace industry
are kind of scarily close in terms of complex
technology, relatively small volumes, and kind of
really high or unique quality standards.
So you're kind of set up for a very similar cost paradigm.
So we were studying that in real time, and frankly, kind of when
we were looking at
what the crop of nuclear startups were doing in the 2010
timeframe, it was clear that no one was even attempting to do what
we thought was so important to just kind of doing it differently the way
that we'd observed from the SpaceX experience.
And
if anything was clear, is that that was not going to just magically happen by
itself. It takes a deliberate effort to make these things
happen, and it's incredibly hard. It's a huge amount of work.
That's sort of not lost on us. The other was a
recognition that the
technology itself was going to be enabling of a lot of
the ideas that we were trying to take from the SpaceX model.
So in particular, the idea of doing a lot of testing
and actually getting real live experience with the systems was going to be
important. And that was possible because of an insight that
we could really leverage kind of the unique combination of
the fuel that you mentioned, the TRISO-coated particle fuel, which is
incredibly robust, combining that with the salt coolants, which
is a great high-temperature, low-pressure coolant.
So you have a low-pressure system, which means your vessels are going to be a lot
thinner than the thick vessels that we need for high-pressure systems.
But the salt is also a backup barrier.
So, like, the safety of our system is largely defined by that combination,
which means that a lot of other things in the system are just not important
to safety. And so that means that we can do a lot of iteration,
testing, development work on things that are not relevant to
safety. Those mean that we can change those parts of the design as we
go through those cycles. And that was sort of the key difference, is that the
regulatory overlay on nuclear is just very different from what it
is for aerospace. And it was clear to us that we had to get this right from the
beginning. We had the benefit of having a lot of good connections to people
involved early on in the SpaceX experience, including people like Tom
Mueller, who led their rocket development.
And he said straight out that if SpaceX had to do what they did for human space
flight for cargo, the overlay of the
requirements for safety, which are totally appropriate, would not have worked,
right? So, understanding how to bridge that gap was a
challenge we knew we had to mount from the beginning.
We started engaging with the NRC back in 2018 and
started really developing a lot of credibility behind the safety case,
which unlocked the economic potential.
So, like, those were two things that were kind of converging, and then the
availability of kind of committed patient capital has allowed
Kairos to grow and focus in a pretty unique way.
It puts us in a very fortunate position now, 10 years in.
We've taken a lot of risk off the table, and we look at kind of
partners that we're bringing on board right now, like Samsung C&T,
BWXT. These are not newcomers in the nuclear space.
These are really capable, established players.
We understand how we fit into the value chain, and when they come in and they do a
deep dive into what we've done, I said building that credibility has been key.
And so the philosophy has always been, well, whatever you see at the surface
should look better when you dive. The deeper you dive in, the better things should
look. And so it's nice to get some recognition from that from the
partners that we're bringing in, but there's still a lot to go, and we've built
a solid foundation, but there's still
much work to be done.
The deeper you dive, the better things should look.
It's hard to build it that way, right?
Well, yeah, you definitely have to be thoughtful about a lot of things.
Hey, let's go back real quick. So, higher temperature and
atmospheric pressure is a great combination in the design itself.
I think the high temperature is broadly understood that there's other use cases of
industrial heat and other things you can do the higher the temperature you go.
Help us understand at a high level the additional benefits to atmospheric
pressure from a manufacturing standpoint and why that's such an edge
relative to the traditional designs that exist in the US from a
manufacturing standpoint.
We're going to dive deep right away here into kind of complexities around
supply chain, which is-
Okay, let's do it
... something people in the nuclear field love to dive into.
High temperature, low pressure is a great combination
to work from, kind of from a fundamental technology perspective.
High temperature allows you to drive higher efficiency, so you
kind of get more efficiency, more energy out of your fuel if you're driving a
higher efficiency, and then you can also use that heat for
various kind of industrial applications.
Our outlet temperature for our reactor is 650 centigrade.
Electricity is our primary market, but the technology itself could be
expanded naturally into different secondary markets, and processed heat
is one that's really hard to kind of get off of fossil fuels,
and our technology is one that could enable a lot of
opportunity there. Low pressure is also really attractive, and that's sort
of what's unique about our system, and the use of TRISO fuel
there. In contrast, most reactors that are using this fuel
form, which is very robust and it's great in a lot of different reactors, but
they're using it with helium high-pressure gas, which has some nice
qualities, but dealing with high pressure means that you're dealing with
really, really thick vessels. And you also have to, if you have fuel, pebble
fuel, the
golf ball-sized graphite and fuel pebbles that are going through the system,
they're larger in the gas reactors, they have to go through that pressure boundary
to go in and out of the system as you're kind of recirculating through.
So, there's a lot of operational complexity around dealing with a pressure
barrier and just making sure that things don't leak.
And then also when you go through kind of the quality and qualification, that
pressure boundary, it's actually not really important to the safety, but
for us, being able to go with thin wall components opens up a lot
of opportunities on the manufacturing side, and that's kind of the other...
Iterative testing and building things is a great takeaway from the SpaceX
experience. The value of vertical integration and in-house
manufacturing is just so crucial to
that early success that we see as the right model to
follow. And for us, being able to do that with a low-pressure
system, it just significantly reduces the potential
hazards in those development tests.
It allows us to push the system harder and do it in a safe
environment that's non-nuclear, and just reduces the hazard level
significantly. And then also just in terms of manufacturing, there are only a few
facilities in the world that can make the really thick forgings that are
needed for the high-pressure nuclear reactors.
I actually saw some of those facilities in South Korea last week.
They're amazing, but my reaction is I'm really thankful that we don't need those.
That's sort of my honest reaction.
Glad I don't have to wait on one of these.
And just dealing with much smaller components, it opens up
a lot of opportunity that I don't think would be available if we had a different
technology. So, everyone in the nuclear space can talk about why they think their
technology is great and why they think other technologies have challenges.
The reality is that there's good and bad with every nuclear technology, and you
have to make the choices. What is sort of unique, and I do this thought
experiment sort of all the time, our technology is really
compatible with this process. And so, the tests that we've built, and we
can dive into some of these, some of the explicit goals there are to test the
supply chain. And I like to say internally, these are non-nuclear
systems, and so a supplier or a vendor that can provide what we need for that
system, we don't know for sure whether they can make the leap to the nuclear
system. But if they can't deliver what we need for the non-nuclear system, there's
no way they can deliver
what we need for the nuclear system.
So, it's actually because we're dealing with kind of a
new operating regime with the high temperature and the salt
environment, it allows us to actually filter out a lot of
suppliers that are not able to do what we need very quickly.
One of the other things that we've learned as we build out kind of the
manufacturing capability,
it reinforces the value of having these capabilities on the team.
So, you don't do it all at once. You make decisions about what are the high-value
parts of the system that we want to do.
So, we decided to do graphite machining very early, and then the team
kind of learns, well, now this is something we're not dealing with a vendor.
They're going to have to do a lot of tooling.
What are we going to do with change orders if we change the design? It's like, no.
We can say, "I
know the person who's going to do this tooling, this machining." I can go talk to
them and say, "Well, if I wanted to change these things, how hard would that be?
And would that delay things?" And say yes or no.
And it makes the engineering process more pure to
some degree, rather than a contractual battle about
who's going to pay for the change orders.
And I didn't realize that 10 years ago in this process that
that was what the value is, but the vendor relationship, they're
ones that obviously work out really well, and we have great partners that we
continue to work with and are really thankful for.
But a lot of what engineering is, is actually defining out
specifications that protect you in contracting space.
So, you can say, "If you didn't follow these specs, you pay for it, not
me." Right? And if
you're dealing with Kairos and Kairos on both sides of that equation, it doesn't
matter, right? Kairos is responsible for it.
So, that wasn't obvious that that was going to be so much of the
benefit from the strategy beyond just the fact that
if we get it right, we can control costs.
... much more significantly. We have the infrastructure to do the qualification
testing, and then we have efficiencies of our quality program.
So we don't have to go out and audit a huge network of
suppliers and make sure that they all are following the same quality
program. The NRC can come audit our quality program, basically come to
Kairos and see almost everything that they need.
And there are just a few select vendors, mostly actually raw material
providers that they need to go see. So, that's been one of the surprises.
We've learned about how this process plays out and the efficiencies
that we gain from the strategy, but the core tenets of it were there from the
beginning. There's just a lot of nuance and learning that we've had along
the way about what it means. And in this space, there's a lot of work.
The details really matter. And I know that we don't want to dive down
into all the weeds in the podcast, but
when I say the deeper you dive, the better it should look, those details
really matter, and you can get hung up on so many little
things here that just having that broad base of coverage has been so helpful.
Yeah, I want to get into vertical integration in a bit and the
full scope of everything that you guys are doing.
And also, in my mind, you're really trading CapEx now in exchange for
control, which, to your point, that control goes a long way for a lot of different
reasons. Let's close the loop on fuel first.
So-
Yeah
... one interesting part of your design, you hear molten salt reactors, but you
guys are using solid fuel in a molten salt
design. Explain in non-technical, high-level terms,
why does that simplify the chemistry of the design itself, and why did you go that
route to use solid fuel instead of the...
Some of your peers are using
fuel that's dissolved into salt, right?
So it's very complicated from a chemistry standpoint.
Talk us through that before we move on.
We have to be very thoughtful about where we take on risk and where we don't want
to take on risk. So, Brennan, you're exactly right.
The salts that we're using were originally developed and
explored back in the 1950s and 1960s for
reactors that had the uranium actually dissolved into the
salt. And so, there is no solid fuel.
There's no fuel rod or fuel pellet or pebble.
It's just the uranium is in there. It splits apart, generates energy.
It also generates half the periodic table.
And so when you're looking at the chemistry in the system, you're
dealing with most of the periodic table is in there and is in the salt.
That's going to create a much more complex chemical environment.
Tremendously, the scientists that were working on this back mostly in Oak Ridge,
Tennessee, figured out a lot of really brilliant ways to manage this.
You have to use some specific high-nickel alloys to kind
of have more corrosion resistance in the system.
What's attractive about those systems is that they're almost like the chemist's
reactor. So, because you're dealing with a solution, you can do a lot
of really fancy things and creative things by taking things out and putting things
in that you can't do when you have solid fuel that's stuck in the
system. So, they are very elegant reactor designs that can
do all kinds of creative things. The problem is that
those are not the things we're trying to solve for today to get more nuclear power
out into the system. We're really trying to solve for cost.
And those systems, what they do is,
you can do creative things, but you have radioactive material.
Your fuel is basically going around your whole circuit.
And so, the footprint of the things that you have to contain is
actually much bigger than even the current conventional reactors.
And so for us, we like the salt as a backup
barrier. We kind of joke that
the tests that they ran back in the '60s are sort of like our
reactors with totally failed fuel.
So it's like a severe accident test, and it was okay,
right? So we sort of have run that experiment, and it was
okay. In the case of our system, we use the most
robust fuel, but we combine it with this backup barrier.
And for us,
we just have to deal with the normal kind of corrosion products in the salt,
but we get rid of the periodic table.
We get rid of the fuel moving around the whole system.
It allows us to shrink dramatically the area of the plant
where the fuel is and what is important to safety, and allows us to be
more innovative and creative and develop new
approaches for the rest of the system
significantly without triggering large regulatory reviews.
So, Hermes 1 to Hermes 2 is probably the best example.
So we took Hermes 1, which we have construction permits for
both.
The construction permits were issued for the same reactor design, but Hermes 1
was basically just dumping heat to the atmosphere.
It wasn't doing anything useful with the heat.
Hermes 2-
Not electricity producing.
Not electricity. Is
that fair to say?
Yeah. Hermes 2 in the application is connected to a steam
system that's basically generating electricity like conventional power plants.
The difference from the NRC's perspective, all those changes were actually pretty
large changes in the plant. None of them affected anything that was safety-related
in the plant. So actually,
the review was really around, do these new systems do anything that's bad to the
things that we care about for safety? The determination was no.
And so, that review time got reduced significantly
between the two and kind of validated the point that, yeah, there
really is only this limited set of things that are important.
And the really significant point is, the fundamental story doesn't
change for the smaller reactors to our commercial-scale reactors.
And so we've scaled up Hermes 2 to be at that
commercial scale and basically form the basis of our
standardized design. But the safety case is going to look the same because the
consequences of these reactors are so low, it opens up a lot of
unique opportunities. So, that interplay is really important.
That opportunity is not available with the liquid fuel reactors using the salts,
and actually, I think is uniquely available to Kairos probably
amongst all of the reactor vendors and technologies out there.
Yeah, it makes a ton of sense. Many of the advanced designs are using
TRISO, especially the micros. And to your point, I think it's because guys are
essentially able to check the safety box out of the gate and worry about other
problems. I joke that TRISO's the most sophisticated and
expensive ping pong balls in the world.
You call them golf balls, but it's amazing how much is trapped inside of
these balls, if you will. And there's lots of debate around cost.
The debate with TRISO is not about safety, it's about cost.
And the DOE's actually called TRISO the most robust
fuel on Earth.
And so I think you guys ultimately decided that the safety benefits
outweigh the cost. Is that fair?
That's fair. And to be transparent, when we were thinking
about what these reactors might look like, it was not obvious that
we would go the route that we did. There was an argument which was legitimate was,
if TRISO is expensive, can you leverage the qualities of
the salt to allow for
basically lower quality TRISO fuel and to lower the cost of TRISO?
And we decided, no, we want high-quality fuel.
We want to take advantage of that. But there are a lot of levers, and
I think one of the things that's been exciting is the approach that we've taken on
the reactor side has translated really well to
other aspects of the technology as well.
So, we're doing a lot of iteration on the fuel side as
well. Some of that comes out of necessity, right?
We needed 30,000 machined graphite pebbles
for our first large-scale non-nuclear engineering test
unit.
Turns out it's sort of expensive to buy 30,000
machined graphite-
... balls.
I can imagine.
And so the team was tasked then, all right, well, we have quotes
on what it costs to buy it. Let's look at what it would take to put the
equipment in and install and basically do it
ourselves. It made sense to do it that way.
And then it just became very clear that controlling
the quality of the fuel and being able to drive down the costs from
historic TRISO production processes was going to be really important.
And these are not secrets. People know generally
what the things you need to do to reduce the cost of TRISO.
You want to have a more continuous process. You want to take out...
Some of it can be very labor-intensive to do clean-out of equipment for certain
parts of the process. These are known because we're not the
only ones making this TRISO. What we've done is that we've
designed process equipment that enables us to have all
these levers, and this is what's valuable about the combination
with BWXT. They have the experience making TRISO at scale,
but they don't have equipment that has the flexibility that we have our own.
And surprises pop up. We talked about vertical integration on the
reactor side. We've actually been leveraging that to
make a lot of the equipment that we're using for TRISO.
So we're actually vertically integrated not just on the reactor side.
We also have a lot of vertical integration on the equipment that we're using to
make TRISO itself. And so, there's value in being able
to control and design equipment that's exactly what we need,
but then also drive down costs in the infrastructure as well in ways
that would not have been obvious at the beginning, but sort of
makes sense because we have a lot of these flexible
machining and kind of modular build capabilities that have kind of come along.
And so when we look at kind of where we are in fuel, again, we've taken the
philosophy of start small, do your iterations, do your tests,
and get your learning, and then scale up.
And so we're doing that in Albuquerque with basically
not with the HALEU fuel. We're getting the experience to make TRISO, to make
pebbles, but all of that is informing the optimization for the
commercial facility. There's real investment there.
There's tens of millions of dollars of investment in that infrastructure, and the
general response is, "I want to skip that.
I want to go straight to the big thing."
But I'm confident that we have saved at least that much and probably a whole
lot more on the future facility by working out all those kinks
and being able to work through the optimizations there.
It is a different approach of doing the staging in that way.
It wasn't clear at the beginning that that process was going to be as valuable
across the board, but we knew it was going to be necessary for the reactors.
It also turns out to be really important for fuel and for salt as well, which are
sort of our major product verticals.
Okay, Mike, we'll close the loop on the fuel side.
I want to go back to SpaceX, because as you said earlier, you guys were modeling
after SpaceX before SpaceX was really a thing.
Over 10 years ago. And
everyone now is calling themselves the SpaceX of nuclear.
It's on my nuclear bingo card.
I'm creating a nuclear bingo card of iterative development
and modular.
SpaceX is on the card, okay? But here's what it actually means to me, and
I want to draw the parallels to Kairos.
So,
iterative development, the SpaceX model, building from first
principles,
challenging industry norms, a mission-driven founder with long-term
vision and passion. This is very important.
So, the parallel from your views on this to how Elon has approached it.
Vertical integration, which we're already talking about.
And then lastly, iterating. Build, learn, repeat.
Build, learn, repeat.
Kairos fits that mold better than anyone I've seen in
this space.
And the part, really, this is what I think's important to understand, the part that
most people skip, it's not because they don't want to skip them, it's because of
capital and time, but it's the last two. Okay?
So they skip vertical integration because it's too capital-intensive.
You hear this phrase, "We're going with the capital-light model.
We're going to be the licensing model." So it's really hard to build
this stuff, to source the patient capital to build this stuff on the front
end, to serve a useful life of 40, 60, 80, 100 years
of a nuclear facility. And then the iteration piece.
It's not by choice. Everyone wants to iterate.
Everyone wants to build, learn, repeat.
But the model, because of time, compressed time, in the market right now is we're
going to iterate on commercial reactors.
Because it takes several years and significant funding to be able to
iterate. And what you guys have done, I mean, you guys have been building
intentional full-scaled hardware for years, right?
I mean, you have your demonstration projects, engineering test units, as I
mentioned earlier, number one, number two, number three.
You poured concrete on Hermes 1. Walk us through, we don't have to
go into the specifics of each, but walk us through holistically, what
was the purpose of these projects,
these internal
demonstration projects? And how did these collectively gear you guys up
for Hermes 2, your first commercial reactor?
I think one of the most important, and there is a great
slide that we have tried to understand, which
basically shows a big iteration loop of plan, design,
build, test,
representing the conventional cycle, and smaller loops below
it. What was clear early on about that
process is that the nuclear
cycle was just so long and so
expensive, was that you layer in a lot
of process and investment protection and risk
protection, which is rational, but it's there, and it
actually makes it much harder to do the innovative thing.
And the sad part for nuclear technology is that
the people who have the full life cycle experience is
so limited because we just have so few
success stories of going through that whole process.
What you find is that nuclear experience tends to
be concentrated for different parts of the process, and they've been doing the
same thing over and over again, but you lose the holistic
vision of that whole cycle. And so, from our perspective,
we went back and forth a lot about the literal analogy.
If SpaceX did a Falcon 1, which was a small rocket, before they did
the Falcon 9, which was their workhorse,
the big money-making engine for the company for cargo and
then for human launch, do we have to do small nuclear
first? And the story has evolved as we've decided
through kind of different iterations along the way.
But for the non-nuclear, big-scale systems that we were building
out, it was clear
a lot of the value was, and I'm going to say, it was a training exercise
for the Kairos team
to a large degree to test whether we could do this.
And some of the lessons that we got out of that process were not
the things that we expected, right?
So, one, the team went through that whole design,
build, operate, and decommission life cycle
for
ETU 1, which had 14 tons of salt in it.
We ran for about six months of different testing activities before
we shut it down. The world's biggest FLiBe test,
and we did a huge number of firsts on that system.
And the whole team got that life cycle.
And when we go back on it, we had PhDs who were doing night
shifts in the operation because it was, who's going to be the best
person we have on hand to do these? And we weren't setting up
necessarily a full-scale operations organization.
We have that now, but it was very much like a learning experience
around the way, and what do we need for the next one to go through there?
So, we now have a team that's gone through that life cycle once.
We're about to start up the second engineering test unit in Albuquerque.
It looks very different from the first one.
It looks much closer to what our actual nuclear build system, and all of
those lessons kind of come along for the ride.
Having an organization, I
like to say this as well, Kairos, if nothing else, is an organization that is
being built to learn,
and that statement has a lot of value.
We need that in order to do the work that we're doing right now because we need to
learn really fast. But where it really delivers
is everyone talks about that learning curve, right?
Like how you go from your first-of-a-kind cost to your nth-of-a-kind cost.
That doesn't magically happen.
You have to build out a team and a set of partners who are
actually capable of doing that. And there are a whole set of best practices
from the nuclear industry as well about how you can do that well and how you
can do that poorly. The South Koreans are best in class
right now in the world on following those best practices.
And so when we go engage with
Samsung C&T,
we look very different from the types of projects that they have done
for nuclear, but we speak a lot of the same language about best
practices for... And I'm going to say, this is going to sound like a paradox.
We're talking a lot about iteration, but once you get to that first reactor, you
want to standardize design and just do the same thing over and over and over again.
So, how do you allow for that innovation and then you lock it in?
This is what I'm fearful for, this is what I'm nervous about, about others in the
space. They're kind of going straight to that big design without going
through all these loops along the way.
There's no way that that first plant is going to be the optimized design.
And so when you go to change things, you run the risk of
introducing
new first-of-a-kind risks into the next build, or do I just live with what I
have and try and do it better the next time? That's not an easy decision.
We've sort of been through tough decisions on our end as well, as do
we... Because when you do that, you're going to lose schedule, it's going to take
longer to do it. You introduce more cost risk.
Your costs will probably go up before they come down.
And for us, building that learning
organization is absolutely essential, but you have to do a lot of
work, and you need- ... iterations at the right scale, you need
investors who understand the value of that process.
We got a lot of confusion. When we were showing people the first engineering test
unit, almost everyone went, "So you're doing this for the NRC, right?
Because why would you do something this big that
is not for the NRC?" It's like, "No, no, we're not doing it for the NRC.
We're doing it for these reasons, and they're mostly internal lessons that
Kairos is learning." And it was like, we got a lot of strange looks.
Like, "Why would you put
$20 million into a full facility to do that if you
don't have to meet NRC requirements?" It was very confusing.
But when we look at the scale of the investments for commercial plants,
the value, the return on that $20 million investment for
ETU 1 is tremendous. And I wish I could
have a precise, like, "We saved X dollars by doing this."
There's no way of running the counterfactual experiment of how much more it would
have cost. But when we look at kind of scales for commercial
facilities, nominally kind of a billion dollars for Hermes
2, that's pretty expensive for a facility, but it's less expensive than doing
three or four of them at the same site and
getting all those lessons in before you move to the next one.
Then we move to the next 450 megawatts, then we have a standardized
design, we're doing the same things over and over and over again.
This is the lesson we've taken from both the combination from SpaceX and the best
practices of nuclear, fuse them together, and to me, this is
controlling destiny is really important here.
And by integrating all of this, Kairos is not
just... You talked about other business models, and there are
definitely a wide range of business models in the space.
For us, when investors, you included,
look at us,
you kind of see the full spectrum of things that need to happen, and you can have
two reactions. Both are true. One is, "Wow, that's a lot.
You guys have to do a huge amount of stuff to make this possible."
The other is the recognition that we're actually being honest and transparent
about all the things that are needed, and
we're in control. So Kairos is not just the technology provider, we're the
manufacturer of equipment, we're the integrator of a lot of systems that are coming
together. We're the owner-operator of the first plant.
So we have a lot more control over the project
than I think many of our peers do in this space, and I
think we are the only ones at sort of the grid utility scale
that are doing it in this way. And it's then, going back, it's
possible because of some of the fundamental choices we made about the
technology that enable this, but it's a huge amount of work,
right? The general assumption is others can take this work.
We can pass it off to an EPC. We can build out a supply chain
that are going to do the development work and kind of come along with us along the
way.
Maybe that will work, but interfaces are messy, and the more
interfaces you have, the harder it is to execute and coordinate.
Kairos has cut out a huge number of those interfaces, but
as a consequence, a lot of that falls on us.
And so it's a lot more transparent.
A lot of what you see is there. I think with others in the
space, those costs for the first of a kind projects need to be picked up by
someone else, and you need to have confidence that they're going to come in and
they're going to provide the project financing.
And for us, it's kind of all on the table, but the benefit
is that it allows us to be more efficient overall in terms of getting
to grid scale demonstration, and it gives Kairos a lot more control in the
process than...
We need that control to make sure that we're successful.
That's a core tenet of what we believe.
It's going to be a big advantage not doing all this for the first time on Hermes 2.
So bridging there, now that you're really nearing the end of these
demonstration projects, what do the next five years look like as you guys
are gearing up for Hermes 2? I mean, presumably that
is the core focus, but also you said you're finishing up ETU 2, and
so is it really finishing the demonstration projects bridging to
Hermes 2, or are there some things that are all happening at the same time as well
along the way over the next five years?
When I say what we're doing is hard, it gets harder
as we keep going.
Yeah.
A lot of that kind of comes into play in the next five
to seven years. We have an incredible team.
People are dedicated. They work
really hard, right? Like, they do all the things that we ask of them, and they
push to do more, which is
necessary. The challenge is that when we're trying to do multiple
things at once, you're carrying a lot of balls,
and keeping everything moving together becomes kind of
the major execution challenge. So
Hermes 2 is the most important. In many ways, it sort of is the
Falcon 9 analogy for us. It is the system that proves
our commercial product. We can go through the entire delivery process.
We know exactly what the costs are.
We have the standardized complete design. We can extrapolate from there.
The problem is that we can't complete the project and then
start on the next one, because then we have all of this manufacturing
capability, all the people, all the knowledge is just sitting there, it's going to
atrophy. So we need to make sure that that knowledge
flows directly into the next projects, which is
why our agreement with Google is so important,
and from my perspective, has been thoughtfully structured to enable that
transition. So we have to make sure that the build...
And it's not even the whole life cycle of the build, right?
So we're going to start... Like, we're doing excavation now and site prep now for
Hermes 2. We're going to start the foundation construction next year.
We can't wait for the three years of construction to be done before we start
the next projects. We want to have that knowledge from the phases of
construction flow to the next phases.
So we need to have things moving on the next project overlapping.
And so that's actually- It's a deviation from kind of an
ideal case. If you look at software, let's call that
the easiest example in terms of the iterative process, which, in a lot of
agile development approach, for software, you run the cycle, you see
how it works, you can go... You get your data very quickly, generally, from those
types of tests. For us, we're not getting that return
data, so we need to overlap builds.
The build sequence needs to be continuous, so we just need to be building,
building, building, building,
and keeping all of that machinery moving in
the process. So, in the next five years, we need to
complete construction of Hermes 2, get it up and running, and
operational, and go through the startup process.
We also need to have fast following for the next
450 megawatt site for us, for the next six reactors.
It needs to come
fast following. So, we're working hard to get that lined up right now.
Carrying those two projects in parallel is not going to be easy.
And so, when I kind of look at the high level,
and as we've kind of engaged with you and other investors, and understanding
how we're going to build the financing bridges that are going to be necessary for
these next phases,
it becomes clear that
that overlap puts a lot in there.
But it provides a lot of value and a lot of opportunity.
Because we have a certain number, we can build out a supply
chain that makes sense for that scale and then grow up.
The other thing is that we have to keep our promises about what we're going to
deliver in check, because we're going to very quickly end up in a place
where we are capacity limited, particularly if we're talking about the
2035 time period. And so, we have to be very
direct and honest about how much we can actually deliver and what we're
enabling to stage. And so, I can be very bullish about what we're
talking about post-2035, because we have all the building
blocks, and then I think it's going to be primarily capital
and human capacity limited, at how much we could actually do with
growing scale. But how much we put in the bucket before 2035 is
going to stretch us thin, and we have to be very thoughtful to make
sure we don't get overstretched. That's a hard line to bridge with the
hyperscalers who are demanding power now, as soon as
possible, with investors who say, "We need to see the biggest
commercial ramp-up as fast as possible." And finding the right balance
between that is
definitely not easy.
The benefit is you have visibility and a commercial partner
supporting your first 500 megawatt build-out through 2035.
Yeah, so I guess it's a benefit and a challenge at the same time,
because the first 500 megawatts through the development agreement with Google, I
mean, how many development agreements are out there with real
off-takers?
So, that is also a
really compelling part of what you guys have, and your point is well taken.
I mean, you can't just build everything for Hermes 2 and stop.
And we'll talk a bit more about the vertical integration piece in a bit, but yeah,
the challenge is with all this upfront CapEx, is those facilities need
to keep moving. So yeah, it'll be interesting how this plays out.
Mike, I want to transition to your hubs.
We're going to show Albuquerque and we're going to show Oak Ridge.
Yeah. Before we do, I'm going to make a statement.
I'm curious if you agree or disagree, or somewhere in the middle here,
that Hermes 2 will be the first commercial advanced reactor
online in the US. Agree or disagree?
I'll add one more caveat. So yes, but I'll say grid scale.
I'll say grid scale.
It's an important caveat, and I think the market needs scalability,
and we feel quite strongly that there are different
opportunities in nuclear space. There's more than enough demand.
But when we start to see kind of
what can work, kind of the 50 to 100 is kind of the entry point to grid
scale,
that's really what industrial customers are looking for, what the hyperscalers are
looking for,
the utilities and the grid operators are looking for.
That is the sweet spot there, and I'd say we've got the best
shot. I'll caveat it that way.
Maybe a little bit more than you were expecting, but I think it's important.
Yeah, the one megawatt micros, the smaller micro guys have...
There's a lot better chance that you see one of those online sooner than grid
scale, so that's a great distinction.
Okay, Mike, let's go into the hubs.
So, this is where you just have to see it. I've already mentioned this before.
You really need to see everything that Kairos is building.
So, we're going to show this on screen, and just have it in the background and give
some things for Mike to speak to, and I'll talk over it as well.
But you really can't understand everything that Kairos is building, both in
Albuquerque and in Oak Ridge, Tennessee, without seeing it.
So, what you guys have built alone in Albuquerque, I think it's over
180,000 square feet of manufacturing capacity and growing.
There's reactor components being manufactured, modular
systems, fuel production equipment, molten salt coolant.
You show your manufacturing facility with machining, welding,
water jet cutting. You're producing key graphite components.
The TRISO fuel lab is there. I mean, this, like I said, you
really have to see it to appreciate it.
This is where your engineering test units one and engineering test units two were
done.
Mike, talk us through Albuquerque in your own words, everything that's going on
there.
Yeah, so Albuquerque,
it has grown, and I think now has a pretty well-defined
scope. But the best way of thinking about it, it sort of is the
microcosm of all the major pieces that need to come together
for delivering the reactor, with the major exception of
the civil infrastructure construction.
So, we have kind of our three verticals are reactor
systems, fuel, and salt, and we have essentially
the- ... the minimum viable supply chain of each of
those components demonstrated at scale in
Albuquerque, including coming together for the
full-scale integrated testing with the engineering test units.
We didn't know exactly what that was going to look like, and so we
sort of built out and added capabilities as
they presented as being really important.
And so, we knew from the first engineering test unit, graphite was going to
be really important for scheduling and for integration of design, so
that was one of the first big things that we put in.
We knew for the second engineering test unit that we had to take ownership over
vessels, and so we used the high bay space where
ETU is located has a divider wall, and that facility
was built to move around the ETU vessel, so it also happens to be the
most convenient place for us to do vessel work.
We have a lot of investment in welding, and we're thinking about putting these
systems together and putting that under Kairos' umbrella and our quality
programs is really important. And we also
integrate the facilities, so the facilities are linked.
And so, we
kind of are skipping over Alameda. We have smaller facilities here.
A lot of the early ideas for components kind of come
together and are tested here, and then they're scaled up in the Albuquerque
facility. So, really kind of it's where things come together.
Something different and equally impressive being built in Oak Ridge, Tennessee.
So,
acres campus,
shows a former DOE uranium enrichment site, which is really interesting.
It's where you're building engineering test unit three, the foundation of Hermes 1,
the Hermes 2 deployment, which you can see the TVA power lines in the
background. The construction approach here is unbelievable.
I mean, you have a concrete batch plant on site.
You have 3D printed molds for concrete.
You're doing precast concrete construction.
Recently announced a new camp workforce initiative.
Mike, talk us through Oak Ridge in your own words. What did I miss?
Yeah. So if Albuquerque is really where the
manufacturing and the testing is coming together,
Tennessee is sort of taking things to the next level in terms of
really being a unique hub for nuclear construction and operations.
And so, the facilities that we have there are really geared
towards
gaining cost certainty around and confidence in different
construction approaches, overlaying quality, and really being a test bed.
I think this has been one of the genuine surprises in the
process, not that this was going to be a really important part of the puzzle,
figuring out how to do the construction and the concrete and the integration.
We know that civil costs are going to be a big factor of any nuclear
facility, but being able to actually apply and grow and
expand the iterative philosophy even to kind of the
construction, the civil scale, was not something that we necessarily
expected, but may not
be totally surprising looking back in retrospect.
So, what we found is a lot of the civil
construction in particular,
it does have repetitive processes.
And so, being able to demonstrate and do the same thing
over and over again, you can get a lot of that learning by doing it
once or twice before you go in and putting it in the system.
And the common approach is you're just going to do the first-of-a-kind kind of
learning in actual build, but we found there's a lot of
overlap. So, Hermes 1 foundation is the first nuclear
safety-related foundation that used drill piers, a totally common
construction practice, but how are you going to do the quality inspections for it?
Well, we had a whole bunch of drill piers that we did for the
ETU 3 facility and the modular skid integration facility in
Tennessee. We were able to use that to pilot.
We did a 52nd pier, one just for practice, and these
are things that
fit in with our philosophy. They do add time, they do add
some cost, but what you save by having that
confidence is really kind of covering those gaps.
And then looking forward, Oak Ridge is sort of a unique
hub for kind of nuclear talent, nuclear labor.
Building off of that, having that kind of flow in really provides us like
a hub for regional
deployment and construction operations.
We look to partnerships with the University of Tennessee for
operations, and we look for our broader partnerships with local community,
including Oak Ridge High School, when we're looking at building out the labor pool
and the talent force. There's just tremendous opportunity there.
And Oak Ridge, Tennessee is a unique place in terms of
the level of knowledge that the community has for nuclear.
I was out there, and you have campaign signs for city council, they've got a little
symbol of the atom on them, right? It's
a unique place, and it's tremendous, but the credit
to our team,
what we're doing is we're having just a good open communication, and we're
delivering on what we say, and that's sort of the thing that matters.
People want to know what jobs are coming, what opportunities are going to be there,
and so we really believe that there's a lot of opportunity there, and we want to
build things in that region and grow there.
So, we see a lot of opportunity, not just at the site at Oak Ridge, but
when we look at the future commercial projects, in my view, the
closer they are to Oak Ridge, Tennessee, the better, because we can go back to
those best practices on nuclear construction that we're
applying to our projects and being able to apply it.
It depends on people, it depends on infrastructure.
We're setting that all up there and doing the iterative process, so there's a lot
of learning that's being embedded in the team that's there.
It's still relatively small, but it's definitely growing.
Well, Tennessee has made it clear that they are open for business for nuclear,
which is such an important box to check.
So on the footprint, I mean, you guys on the West Coast, the HQ in Alameda,
more central Albuquerque manufacturing, Oak Ridge deployment.
Do you find it helpful or- ... challenging at times to be spread
across the country from west to east.
The honest answer is, a perfect world, it'd be great if there was be one location
where we put everything. That would make life easier.
It would make plane travel a smaller part of all of our lives, which we
would all appreciate. The unfortunate reality is that
there is no single location where it makes sense.
So I think defining clear visions and roles for
each of the spaces, and then how they interface.
And during the pandemic, we got a lot better at
using kind of the video integration.
So when we do startup operations for E2,
we've got kind of remote control rooms with all the data here in
Alameda. We're setting up one of those in Tennessee.
So there's responsible engineers who are kind of overseeing the testing of their
systems.
They don't have to sit in the Albuquerque control room.
They can sit here, they can see all that they actually...
They can access the data on their laptop wherever they are, as long as they have
a secure connection. So, we have the ability to
have tremendous access, and so we got flexible, but
we realized that a lot of that benefit that we got from the virtual was
cashing in on the investment that we made on the FaceTime before
the pandemic. And so, having people flow back and forth,
seeing the manufacturing happening for their systems, being there for the testing,
understanding it, like, that all builds the personal connections that are
really important. And it's not always fun or easy going back and forth,
but it's absolutely necessary. And each site has a
distinct role in the overall picture, which is important as
well. But building a cohesive, kind of unified, kind of one Kairos
between all of the sites is something we put a lot of effort into just building the
right culture behind all of the sites.
Yeah, and different talent at the different hubs too, I think is important.
Mike, let's talk about the business model.
So, licensing versus integrated.
There's different approaches here.
And the licensing model really being,
you get a reactor design licensed, you license that to a builder, you collect the
licensing fee, maybe you sell fuel over the life of the project.
It's not right, not wrong, just different.
The pitch is that this is a capital-light model.
Little CapEx at the parent level with the builder basically carrying the
build risk and the CapEx risk. But does capital light
also mean control light? I'm asking you in a rhetorical question
because we already talked about this.
So I guess the real question is, how do you control
deployment timelines and cost if you're not
responsible for building the actual project?
That's something I ask myself all the time.
Like, it seems rosy and interesting, but how do you actually control both of
those critical variables if you're not responsible for building the thing?
The honest answer is that the vendor of the technology is
not in control of the project execution or schedule.
That falls to ultimately the owner.
And so they're the ones who are going to be...
They're responsible for the financing, so they're responsible for the money, and
they're going to therefore take ownership over the project risk and make sure that
they have the controls in place and the authorities and management that
makes them comfortable, right?
That's the historical model, and that's the reality.
In Kairos' case,
utilities are, needless to say,
by mandate and often by regulation and law, they
have to serve the interests of the service territories and the populations that
they serve. They have to do it in an economically efficient way, which makes
them conservative. So it's not their fault.
It's just the way that they're forced to be and how they have to think and operate.
So what they're going to do in terms of first-of-a-kind
build is
just going to be very slow and very cautious.
In our case, we recognize that
there are going to be learnings in the first builds that are going to be important.
We want to face those kind of head-on with open eyes.
For us, to go through a conventional utility process, you sort of
have to put on the best-looking appearance that the project
doesn't have risk. And that's because in many cases, they can't
take on that risk. Now, the hyperscalers have changed that because they see
unique value and they need the capacity, and in most cases, are willing to
pay higher rates for the attributes that they can get from
nuclear. But they're still... It's going to come down to who controls
the purse strings on those first projects.
For us,
Kairos is doing that for Hermes 2. That's a substantial amount of
investment capital that's required for that project.
But when we look at it, we have to look at kind of what's necessary, how long
is it going to take, how much investment is going to be required to get to
grid-scale demonstration. And I would argue, because you can
see a lot of that in the Kairos model, we would make the case that we have both
the fastest and the most capital-efficient
pathway to that grid-scale demonstration.
Now, that doesn't mean it's the cheapest from the perspective of the nuclear
vendor, but when you look at all the costs all in, who's going to put
up a couple of billion dollars for the first multi-unit projects
and take on that risk versus us, where we are saying, "We're going to do a single
Hermes 2 demonstration unit, and that will serve as
the reference design for the nuclear island for our subsequent plants,
get that standardized design in place, and then do it over and over and over
again."
Yeah.
And ultimately, we control that destiny.
It means we have to be thoughtful about when we go fast and when we need to take a
little bit of time to make sure we're doing it right.
But Kairos is in control of that schedule.
And so we can make deliberate choices along the way about
where we may want to be a little bit more conservative or where we may want to be a
little bit more aggressive because the cost-saving opportunities make a lot of
sense.
I imagine it's a delicate balance constantly
between what you build internally and what you partner on.
You know, and you guys did a very thorough analysis all the way through
the value chain of
what you're going to do in-house and what you're going to partner on, and I'm sure
that's ongoing as well.
And maybe the surprise twist, we spent a lot of time early on talking about
SpaceX. I mentioned that they're a different company now
than they were 20 years ago. That's true because they're doing all this stuff
with data centers and infrastructure, but they're also a different
rocket company now than they were 20 years ago.
And when you have such... and sort of
Apple sort of falls into this mold too.
When you have such
capability and knowledge over the design and the supply chain, you
actually don't need to do as much of it in later stages as you
may have had to do early on. And so SpaceX has a much broader
supply chain on the rocket side now than they used to, but
because they have the capability to pull anything in-house, it
gives them a lot of leverage in that they can really keep costs down,
and they know exactly how much it should cost, and they can control margins, and
they have full visibility, right?
So you can do things in a different way later on in the process.
What Kairos is doing is saying, "We need to take ownership over a lot of scope
and a lot of supply chain, a lot of manufacturing now.
Otherwise, we might lose control over the project execution,
and we don't want to do that." We want to keep everything
on track. This is what we have to do, but in doing that, we
also see what are the high-value, higher-margin parts of it.
So, what is going to be the core business of Kairos in 10 years is going to be a
subset of the things that we're doing now versus saying, "We're just going to have
to continue to scale everything up forever." And my perspective
is that there's going to be a lot of capital investment in scaling up all of the
infrastructure needed to deliver a lot of reactors.
We have to create the demand in the market and demonstrate that we can deliver.
I'd rather that Kairos has a smaller piece of a much bigger
pie than own the entirety of a smaller pie.
That's a much better outcome for Kairos, for investors, for
the market, in terms of being able to get more out there.
It's a very relevant analogy that we think about a lot.
So, how do we create the biggest pie?
And Kairos is going to get a good chunk of it, but there's plenty to share,
and I think that is definitely true.
The market has made it clear. The benchmark is commercial deployment.
The benchmark is who's going to get to commercial deployment the fastest, and
so balancing that along the way.
Mike, I know we're running out of time.
I want to hit sizing real quick, and I want to hit the regulatory path before we
wrap up. So I'm going to start with sizing.
Many argue that we need to build as many large-scale
reactors or large reactors as possible, and the only
domestic large design on the menu today is Westinghouse's
AP1000.
And so I've said for a while, innovation really needs to make its way to the
gigawatt-scale facilities. So, let's look at your plant, for
example. We'll show a rendering of the Hermes 2 plant.
To me, it looks like a basketball stadium.
It's like a very big, sophisticated basketball stadium.
And so the question is, to get to a gigawatt, do you just
build several of these, let's call them basketball stadiums, side by side?
Or do you eventually get to where you just build a massive football stadium
with more centralized facilities under one roof?
What is the real vision for Kairos on that front?
Is it really better to keep building these smaller
plants and just build more of them, and maybe eventually you're sharing one turbine
with more reactors?
Or to ultimately innovate up the size curve towards
a Kairos 1000 over time, a gigawatt-sized Kairos
facility?
The answer can evolve over time. So I think where we are right now,
this is a very distinct choice that we've made.
Our reactor size, in terms of power output, is
pretty much the same as NuScale's.
We're 75, they're 77. The difference in
the architecture is putting a lot of reactors into one
large building is a very different construction project for the
infrastructure. And so we've made a choice for the early deployment,
one reactor per building is going to be the most efficient
way to scale the learning that we get from Hermes 2
to a standardized design, build that nuclear island.
The
building looks a little bit larger and maybe
is not telling. Part of that is, in order to standardize
the design, we don't put anything substantial underground,
right? So, in other designs, a lot of stuff ends up underground, and so the
footprint of what you see above ground may look smaller.
In our case, in order to standardize design that can work across multiple
sites, you do that by keeping everything above the foundation the same, and
then the foundation design may change based on the local
site geology. But keeping that standard design, that's going to
be the really efficient way. And then the actual nuclear part of the system is
actually pretty small relative to the overall footprint of
the building right now. And there are a number of reasons and factors about kind of
why we have to account for space
right now, and
no one ever really says, "I regret making it a little bit bigger
in terms of access and maintenance." So there are a variety of things that play in
there. But being able to standardize and execute that nuclear island
over and over again, I do think that there's a point in the future,
probably about 10 years out from now, where
we do have to take a look how we learned enough about the
delivery and the design and the execution, where we can go to
kind of a Rev 2 of the system. And the issue is that
when you change the architecture, you change that, you basically will go and
introduce a lot of first-of-a-kind new costs into the system.
Landing at a good price point and coming down the learning curve at our scale
is good. We know, we have validation on the customer side that
this 50 to 100 megawatt sizing is a great increment in terms of
balancing scale,
how demand grows for large industrial facilities, including data
centers, and the availability so you're not taking off
and setting up backup
power and availability. It all works well for optimization at
that scale for the customer. The sort of 150 to
600 megawatt range increment for the site is a great
scaling for utilities. Grid operators love 300 megawatt increments
at a time. A gigawatt coming off the system is a
big demand that has to be met, and so there's value in that.
It just has to be cost-effective in terms of-
Yeah
... the cost per megawatt. And I think time will tell what the
right pathway is going to be, but again, I think because
Kairos is the central hub and the owner of so much of
the architecture, particularly for the nuclear island, we have
visibility into what the cost drivers are, and we know what are the levers we're
trying to pull right now. We also, what are the levers that we want to
save for the future, because we either don't know enough or we
don't have the bandwidth to address them right now.
And being thoughtful about that is going to be...
Those decisions are not always easy.
I mentioned the learning curve as being key and Kairos as being an organization
that's meant to learn. The learning curve is cruel because it's
totally agnostic about all of the sweat, blood, and
tears that it takes
to actually learn. All it cares about are the dollars, right?
Yeah. And
it's so much work to actually realize that we have general
vision about kind of what the major storyline is going to look like, but
the actual learning is going to come from individual engineers
in the field and teams working together, being like, "How are we going to do this
better? How are we going to execute better and drive out cost and schedule from the
system?" It's a lot of hours, a lot of time, a
lot of patience to be able to actually realize that.
And
part of what is both central but also maybe a little bit scary
about the iterative approach is,
and I believe this very deeply, you don't know all the lessons you're going to
learn as you go through the process.
If you did, you wouldn't have to do the iterations in the first place.
And so you have to realize there's a world where
we may learn things that we did not anticipate, and we may have to make
adjustments along the way based on that learning.
And that can be a little bit scary, but
when we balance everything, that's actually central is that we have to be
eyes wide open and be able to
balance what's a good opportunity and risk that we want to address
now and what can we save for later.
Yeah. It's a great bridge to the regulatory side, and we'll close with
this topic. The NRC and the DOE pilot program is...
You guys pretty much, you're a 10-year-old company.
You basically went down the NRC path from the beginning, and I think that's had
a lot of positives for Kairos, and I'm sure it's also created some challenges.
But a lot of decisions along the way were geared towards, want to have a commercial
reactor, grid-scale reactor, we need to get a permit from the NRC and
ultimately an operating license from the NRC.
I'm curious, though, if you were starting Kairos under the 2025 executive
orders and the new DOE framework, what would you have done
differently? What's one thing top of mind? Not the whole playbook.
What's one thing top of mind that you guys would have done differently had you had
the renewed support that came out in the last year and a half from the EOs?
We have a bias towards scale,
and I think that the NRC pathway,
having a pathway through the NRC is going to be really important.
And people are working on this to be able to use data from facilities and have
that...
There's thought behind this, and DOE has a lot of
experience regulating nuclear facilities, so they do have a lot of
capability there. Our thoughts,
when you actually go up to larger scale systems, it's not obvious that
DOE is going to be better or faster in any
way than NRC. For smaller systems,
yes, I think it's a lot more analogous to the types of facility that DOE has a
lot of experience with, and they manage those facilities exceptionally
well.
For us, I think there probably are areas that we would have pushed
harder on, basically saying, "Maybe we can move the
regulatory expectations a little bit in terms
of being appropriate." There's a lot of conservatism that
is put into the process, and maybe
we would have pushed back on some of those conservatisms early on that we just kind
of layered in and said, "We're going to have to live with this right now, and we
can fight those battles another day.
They're not worth it right now." I will say that our
approach has always been...
There is actually a flexible NRC licensing regime
that applies for reactors that are smaller, that have lower risk
profiles. It's just used for tests and research reactors, not for
commercial power reactors.
Yeah.
So by following that pathway for Hermes 1 and Hermes 2, we've
actually been sort of setting the groundwork for everything that we would expect to
include for the commercial licenses.
And right now, what the NRC is doing for new frameworks
for low-consequence reactors, which they're calling the Part 57 framework, it's a
new pathway, it actually is very familiar to us
because it looks a lot like what we've been doing for Hermes 1 and Hermes 2.
So we actually, the pressure on the NRC to reflect on
where it's adding value and where it can be more efficient in its process
has benefited from, I think, the high-quality technical
content that Kairos has been working with the NRC for the last eight
years on and getting them comfortable with this, that, yeah, we can do things in a
more efficient way. Reactors with lower consequences can
be put in a different framework. I think we've set the stage.
And so,
I- People ask, like, what do I worry about most?
There are basically four things that I think are always going to drive our critical
path. It's how long it takes to design and build the systems,
making fuel, making salt, and going through NRC licensing.
I go through a whole day worrying about each of them probably a little bit,
depending on what hour it is, where my concern is the highest.
But most of the time these days, the NRC is not
actually top of the list in terms of my concern for critical path.
I think that-
Yeah
... we have a responsibility on other factors to do it right,
and I think we can now look at 12 to 18-month review
times on the NRC side as being very achievable.
And when we fit that into the construction schedule, it lines up and it gives
us not a lot of time. There's never a lot of margin on the
schedules here. But saying that, three or four years ago even,
the idea that we could expect a 12 to 18-month review would have gotten a lot of
people saying, "No, you got to do..." Two years would have been aggressive, and you
have to put in contingency there. So, we can definitely go in now and I think say,
"Yeah, we're less concerned about the NRC being a
barrier." Part of that is because of the pressure on them to reform their
process and be more efficient in their reviews, but a lot of it is basically
building off the foundation of all the topic reports that we have
approved, which is going to set the stage for easier reviews as well.
It's like kind of getting chapters approved and different parts
of the process approved before you actually go in with your final answer.
I think there's been a lot of progress.
I think the NRC is often the target of a lot of
animosity, and ironically, I find myself in a position actually defending the
NRC a lot more these days than I would have expected.
But the staff there, they have a very hard job to do.
People need to appreciate that. They have to make decisions about what
they feel is meeting the requirements for being safe, and they
take that role very seriously, and people should not treat that as
a light responsibility when you have to be the person who signs off on
saying whether something's going to be safe or not.
That's a tremendous responsibility.
What we've tried to do is to make it easier by presenting a case that is
technically strong and makes sense, and it's paved the way for a lot of
opportunity that you don't have to do things the way that you used to just because
that's how they've always done it.
The DOE has played a huge role. In the pilot program, it was helpful
and it was very important. I think one thing that I like to try to make
clear and clear up is the
perception, the public perception, including in a lot of the venture community, is
that the leaders did the pilot program and the winners of the pilot
program went critical. So you have Antares, Valar, Deployable,
Aalo, Oklo Isotopes so far, I think a few more in the
pipeline that went critical. And it was great, great for the industry,
great initiative. It's important to understand, though, there's a lot of notable
names that didn't participate. I mean, Kairos,
BWXT, GE Vernova, Holtec, TerraPower,
Westinghouse, X-energy. I mean, all these guys, these are big names.
These are bellwether names
already on the path to commercialization through the NRC.
And the NRC requirement's not going away.
So I think it's really helpful framing, and just tying it back to the
iteration. I mean, we talked about engineering test units one, two, three,
Hermes 1 that you guys have done. I mean, it sounds like Kairos has effectively
been running its own pilot programs internally for years.
Is that fair to say?
We've been doing sort of our version of it.
I mean, I think-
Yeah, exactly. A little more tailored, right?
Like, a little more tailored versions.
And not to always go back, but if we go back to the SpaceX, I think
that the DOE pilot program is really meant to
act as an accelerator for
companies in earlier parts of their life cycle, and I think it
can be effective there. So, going all the way in here, it's
like, how do you get to a Falcon 1 faster, right, is sort of the
analogy. But-
Yeah
... Falcon 1, the fourth attempt in 2006
to human space flight in 2020, that's
14 years. That's a long time. And for nuclear, we
have to build that bridge with the regulatory overlay on top of it.
And scaling is not easy. I think that's just something that needs to be
acknowledged. It's not impossible, but going to
larger systems introduces new complexity, but you have
to find that balance of how big do you need to go.
And as I like to point out, economies of scale are very real, right?
Like, building a large gigawatt-scale light water reactor
is almost always going to be more economically efficient than building a small
light water reactor.
Yeah. You're sort of in your lane on the technology.
And if we can deliver 300 megawatt light water reactors at the
same dollar per megawatt hour as a gigawatt-scale plant,
the engineers and the team that pull off that deserve huge amounts of credit.
Fighting the economies of scale is a constant battle.
We're dealing with... We have a different technology, so we're sort of in a
different lane. But when you go to smaller size, you're going to get
killed by the civil infrastructure costs first.
Yeah.
And then as you go down really small, the fuel costs are just going to become
really dry. And then as you go really small, like the megawatt scale,
operations and maintenance and staffing are just going to...
You have to have really compelling stories about how you're going to drive all
those down really significantly. It's easier to...
For us, there's even that pressure, and I sort of used to joke that the right scale
for Kairos was always the overlap of the smallest reactor that
a customer would buy and the biggest reactor that we were confident we could
deliver. I'll note that it's not guaranteed that that's overlapping,
right?
So, right now we have that. It really is this sort of-
75 megawatt reactor, 150 megawatt power block of
two reactors, and sort of a 450 megawatt scale
site as sort of, it's the sweet spot for everybody in this process
and for scaling up on the US grid. That's what the system needs, and
we're very focused on trying to deliver that as quickly as possible.
The NRC is going to have to be a part of that process, and bringing them along for
the ride is going to be easier than trying to either fight them from the beginning
or say we'll deal with them later. That's been a part of our philosophy all along.
Certainly. Well, Mike, this has been a lot of fun.
Mid-2030s, 2035, what does success look like for
Kairos? Hermes 2 is online, all the Google facilities are online.
What does success look like for Kairos? And time's flying. We're getting there.
I know. It's not that far away. It's like right around the corner, practically
speaking. No, 2035, success is
basically we have completed multiple
early sites. We've got probably a gigawatt or so on the grid.
We have a couple of gigawatts of projects under construction in the
pipeline, and we're basically building, building, building.
And that includes all the infrastructure, supply chain, scaling it up.
But we know what our costs are. We know that we're cost-competitive in the
US, and we're actually starting to think about expanding, or we're already
in the works of expanding to secondary markets like international
deployments and processing. And at that point, we know what the unit cell
needs to look like. We just need to build the Lego over and over again.
Yeah.
That's the dream.
Well, it's going to be fun to track, man. Final question.
I love to ask people, especially as busy as you are,
how you keep going. What's one thing that you do consistently to keep your mind
and body sharp,
as it is so demanding, your daily schedule right now,
I imagine. What is one thing you do consistently or try to do
consistently?
Family and Kairos are sort of the only things that really exist in my life,
so there's not really time for anything else.
Being outside is really healthy, so it makes me sad when we lose that
hour of light in the afternoon with the daylight savings time.
So, being outside is always a good thing.
Getting out for walks, skiing in the winter.
Being outside as much as possible is good for the soul.
I love it, man. Well, sincerely, thank you so much for the time, Mike.
This was educational and a lot of fun. And good luck, man.
Thanks, Brennan. It's been great.
Thank you for joining another episode of the "Nuclear Investing Podcast." Be sure
to like, subscribe, and follow. And if you got something out of this one, share it
with someone trying to understand nuclear energy. See you next time.
Brennan Moore is the founder and managing partner of Nuclear Capital Partners.
All opinions expressed by Brennan and podcast guests are solely their own opinions
and do not reflect the opinion of Nuclear Capital Partners.
This podcast is for informational purposes only and should not be relied upon as a
basis for investment decisions. Nothing in this podcast is an offer to sell or a
solicitation of an offer to buy any security.
Nuclear Capital Partners, its affiliates, and investors may hold positions in
companies discussed on this podcast.